Muhammad Javed Akhter, Senior Electrical Engineer

Muhammad Javed Akhter

Senior Electrical Engineer

Saudi Consulting Services

Location
Saudi Arabia - Onaizah
Education
Bachelor's degree, Electrical Engineering
Experience
25 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 9 Months

Senior Electrical Engineer at Saudi Consulting Services
  • Saudi Arabia - Onaizah
  • August 2016 to September 2017

Client- SEC-QASSIM -4 Saudi Arabia
Contractor- NCC
Employer- Black &Veach/Saudi Consulting Services Saudi Arabia
Jan-2016 to date
Project Lead/ in charge Electrical Engineer-Coordinator with SEC Departments and NCC on for Portion B at 380 KV GIS Substation (9032).

Responsibilities

Single handed handling above said Project from infrastructure to completion/commissioning TAC/PAC-ECC-CC.

1. Preparation of the project schedule.
2. Review the project plans and specifications and comment on the building design, scheduling, possible.
3. Cost savings measures and potential construction problems.
4. Assist estimator in preparation of project budget
5. Prepare the general conditions budget.
6. Assist in assembling the job site office and equipment requirements.
7. Expedite all shop drawings and approvals ensure all required municipal inspections are performed.
8. Prepare and expedite project deficiency lists.
9. Technical specifications for construction of 380 KV Cable line from GT Plant to GIS Qassim-380 KV Substation-to be followed as per PTS.
10. All 380 KV Interface related transmittal and materials approvals to be reviewed and approvals to be taken from all SEC internal concern departments. Any missing transmittals/submittals log to be maintained for future reference and follow up.
11. All substation related construction works/Materials inspections to be conducted along with concern substation department and update the records.
12. All internal letters to be prepared and SEC internal communication letters to be sent through CRS as an attachment.
13. All construction/works related works to be inspected along with SEC concern departments.
14. All construction works related work permits coordination to be done through proper channel.
15. All substation testing and commissioning activities to be inspected along with SEC Concern department.
16. Clearance to be taken from SEC concern department for synchronization.
17. Any miscellaneous job allotted by SEC Authority to be handled properly.
18. Site meetings with Contractor/Sub contractors for progress and quality.
19. Daily meeting with my team of Electrical Engineer for allocation of work and task.
20. Daily meeting with Site Manager (Black & Veach) along other Team leaders for coordination and comply.
21. Attending Commissioning/Pre-Commissioning meetings with SEC and NCC.
22. Attending Safety Meetings.
23. Attending Progress Meetings.
24. Meetings with T&D and NCC for discussing Pending issues, Approvals from T&D.
25. Management with complete SEC Authorities and Black & Veach with NCC.
26. Participation in FAT Testing.
27. Yearly Progress/evaluation Report for our Engineers and staff.
28. Coordination to take the work Permit.
29. Taking care of Punch lists and NCRs.
30. Turn over data pack completion to sign the ECC and CC.
31. Taking care of completion of Erection and Commissioning Certificates with team and Site Manager.
32. Follow up of all internal letters and technical matters.
33. Taking care of TAG IN and TAG out Procedure (LOTO).
34. Coordination and meetings with QA/QC and Safety Engineers/Managers.
35. Review and completion of Turn over Data Packs, Erection Certificates, Completion Certificates.

Sr. Electrical Engineer at Zuhair Fayez Partnership Consultants
  • Saudi Arabia - Abha
  • August 2012 to July 2016

August 2011 to 30.12.2015

Client- King Khalid University Abha (Ministry of Education)
Contractor- Arabian Baytur
Supplier- Schneider

Sr Electrical Engineer at King Khalid University (KKU) Zuhair Fayez Partnership Consultants of Medical City Male Campus Phase-2 & 3.
construction of 800 Beds Teaching Hospital, College of Pharmacy, College of dentistry, College of Medical Science, Conference hall, Female Medical College, College of Medicine .

Responsibilities

1. Responsible for all of Electrical related activities.
2. Monitoring to ensure that all testing & inspection requirements are being full filled as per concerned approved ITP.
3. Monitoring to ensure that proper documental evidences are being produced to prove full compliance of contract.
4. Check and review the plans & specifications for the proper construction & quality
implementation at job site,
5. perform pre-inspection to ensure that all installed materials are within the standard in
conformance to applicable drawings & specs.,
6. conduct final inspection with owner’s representative prior to proceed concrete pouring and other succeeding work activities that requires step by step inspection as per inspection and testing procedures (I.T.P.).,
Render monitoring and surveillance on site to control the quality of work being implemented by the construction group.
7. Represent the Company in meetings with the Client, interfacing EPC’s, sub-contractors, and other stakeholders. Lead meetings and record minutes of meetings as required.
8. Manage the Client at the Site
9. Support the interests of the Project Manager at the site, in particular in relation to safety, security, cost optimization and management, and schedule control
10. Support and promote the implementation of the Project Safety, Security and Quality plans
11. Support and promote the implementation of the Project Execution Plan
12. Provide strong leadership and coordination to ensure the site team is working effectively to achieve the project KPI’s. Identify and address risks and issues, escalating to the Site Project Manager and Senior Project Manager as required
13. Provide leadership to ensure prompt prioritization and coordination of all unforeseen issues at the site, escalating to the Site Project Manager and Senior Project Manager as required. Provide cross-functional coordination on site, with external stakeholders, and with the team as required

Quality and inspection Grounding to end of complete laying, Installation and inspection.
Suppose, Installation of ground conduit, Inspection Pit and connections with cad weld.
Installation of lightening copper tap, laying, installation, testing of LV/MV Cables. Cable tra
BMS, Lighting, Breakers, Panels, Transformer Generator, Bus bar UPS, batteries, HVAC, VAV,
CAV, Europium bus bar lighting system, AHU, s, Fire Alarm, Radio, Nurse call, clock, Access
Control and their inspection and testing. All equipment’s operational controlling from BMS.

Senior Electrical Engineer for SEC-East through Saud Consult at saudconsult
  • Saudi Arabia - Dammam
  • November 2008 to July 2012

Project Engineer (Electrical) for SEC-East through Saud Consult, with Laymhere international Saudi Arabia at Quraya Power Plant with contractor Arabian BEMCO from 23 NOV 2008 to 30-12-2009. Responsibility
o Installation, erection, testing & commissioning of electrical power system equipments according to international and power regulatory authority standards i.e. IEC, IEEE, NEPA, SEC etc.
o Reviewing the ECC (Erection completion certificate) and CCC (Commissioning completion certificate)
o Rising of Punch lists if the equipment is not as per drawing and standards.
o Generate the non-conformance report (NCR) and observation reports according to the quality management Procedure (QMP) and project quality procedure (PQP) project technical specification.
o Review subcontractor or supplier quality document submittals (Quality plans, inspection tests & plans, procedure.
o Review Material and Service Requisitions, bids tabs (including QA evaluation of bids), subcontracts and Purchase Orders.
o Monitoring and reporting the status of implementation of the Project Quality Management System and its effectiveness.
o Preparation and verification of monthly Invoices of concern activities.
o Inspection of Generators, Exciters, Unit Auxiliary Transformers, IPB (Insulation Phase bus duct), Unit Transformers, Station Transformers, GIB (Gas Insulated Bus Bar), Energization of PEECC, LCI, AC/DC Line Reactors, Air Conditioning System, UPS, Batteries, Central Control Building, MV/LV2 and Black Start Diesel Generator.
o Inspection of related equipments above said Jurisdiction i.e. is as following.
o The CCB at ground floor consist of 34.5 KV (2 lines are coming from SARAMCO)
o No SST1, 2 Transformers for 34.5 KV Lines.
o 34.5 KV Switch gears (2 No's)
o From 34.5 KV to 13.8 KV and than 4.16 KV.
o 480 V MCC-A and B for HVAC and other utilities.
o DC and UPS System.
o 125 KV Station Batteries and Batteries for UPS also.
o Station Auxiliary Transformers (2 No's) from 13.8 KV to 4.16 KV.
o Diesel Generator and MV/LV lines.
o Review of scope of work, project quality plan and procedures.
o Prepare and update quality control procedure (QCP) and the inspection test plan (ITP)
o Installation of Cables.
o Generate non-conformance report (NCR) and observation reports according to quality management procedure (QMP) and Project quality procedure (pap), Project technical specifications.
o Review subcontractor or supplier quality document submittals (Quality plans, Inspection Test & Plans, Procedures.
o Review Material and Service Requisitions, bid tabs (including QA evaluations of bids), subcontracts and Purchase Orders.
o Monitoring and reporting the status of implementations of the Project Quality Management system and its effeteness.
o Issuance of site instruction if any work delay or work not according to PTS or approved drawings or standards.
Working with GE
o It is a GE based Project where GE is supplier of Equipment.
o Energization of all PEECC and MCC, s DC or AC.
o 2-Hour run test of motors.
o Functional and Timing test of ABB Breakers.
o Phase index (PI) test of Generator.
Documentation: o Issuing and closing of Punch list.
o Issuing of NCR (Non Conformance Report)
o Making of Shut down Schedules.
o Arranging of NCRS and Punch list.
o Reviewing the ECC (Erection Completion Certificates) and CCC (Commissioning Completion Certificates) Packages.
Inspecting of all RFI, s regarding Installation, erection and grounding carefully according to PTS, IEC, IEE and SEC Standard. On any complain regarding any abnormality issuing a Non Conformance Report (NCR) and follow up the NCR and I do my extreme try to solve the matter as per standards.

ELECTRICAL ENGINEER at TPS Guudu Wapda Sindh Pakistan
  • Pakistan - Multan
  • January 2000 to November 2008

Experience as Electrical Engineer in Power Plant Construction of 450 MW CCPS and 600 MW CCPS and Maintenance of HV/EHV Lines in Guddu Thermal Power Station Combine Cycle and its Grid Station 500/220 KV Lines from Guddu- Jamshoro and Tarbela Wapda.

Client- PEPCO-GENCO-III (WAPDA)
Contractor- Siemens /Habib Rafique Limited Pakistan
Jan 2000-August 2008

ELECTRICAL ENGINEER-Client Side

Responsibilities.

o Construction of HV line from Guddu-Multan-Tarbela 500/220 KV.
o Design Review of HV/MV Grid station and lines
o Working on one line diagram single bus bar and Double Bus bar System.
o Installation of Conductors Dog, Rabbit with Proper line span to avoid the corona losses.
o Installation of Capacitors and Capacitor banks on each end.
o Installation of Circuit Breakers in Switchyard with complete Protection scheme SF6, Vacuum and Air Blast Circuit Breakers.
o Installation of Bus bars of ACCR or else.
o Installation of Transformers of 500/220 KV and 220/11 KV.
o Installation of Panel boards and Batteries at Grid Stations.
o Installation and laying of Cables HV and LV Cables.
o Review the design as per site conditions.
o Issuing the Punch list.
o Issuing the Site Instruction.
o Issuing the NCR on noncompliance of work.
o Review of Electrical Proposals, Estimation and Calculation.
o Checking the design submittals and Material.
o Maintaining and monitoring the line behavior from Regional Control RCC and NPCC (National Control Centre) if in operation.
o Maintenance of Switchyard Work Shop related equipment’s and to attend forced, routine and major shut downs on Breakers, Isolators, Transformers of 160 MVA Auto transformers, 60 mva, 10 mva, 6mva aux: transformers and 800, 1200 KVA of 0.4 KV.
o Motor workshop which relate to 6kv, 0.4kv and DC motors. Maintenance of all motors, there testing and installation.
o Control workshop which relates to the control circuits of power plant, following testing as under to manage with staff.
o Different Protections of transformers, Generator and motor like insulation test, open circuit, short circuit, Hi Pot testing, (IR) meger and continuity test.
o Maintenance of Electrical Part in Diesel Generators.
o Maintenance of Electrical part in HVAC System.
o Thermos vision of Breakers and Isolators.
o Testing and maintenance of DC system.
o Installation, erection, testing & commissioning of electrical power system equipment’s according to international and power regulatory authority standards i.e. IEC, IEEE, NEPA, SEC etc.
o Review subcontractor or supplier quality document submittals (Quality plans, inspection tests & plans, procedure.
o Review Material and Service Requisitions, bids tabs (including QA evaluation of bids), subcontracts and

ELECTRICAL ENGINEER at TPS GUDDU
  • Pakistan - Hyderabad
  • January 1992 to October 2000

600 MW CCPS TPS Guddu Sindh Pakistan.

Client- PEPCO-GENCO-III (WAPDA)
Contractor- General Electric Pakistan
Jan 1992-January, 2000

ELECTRICAL ENGINEER- Client Side

Responsibilities.

Engineering, Installations, Procurement, Recommissioning & Commissioning Coordination of of Power Plant and 11kV Distribution Substation Equipment’s detailed as below:
o 2 MVA 11 /0.433kV Distribution Power Transformer SCHNEIDER ELECTRIC
o 500KVA, 415V Diesel Generator CATERPILLAR
o 11kV High Voltage Switchgear MCSET SCHNEIDER ELECTRIC
o 415V LV Switchgear BLOKSET SCHNEIDER ELECTRIC
o 24V and 110V DC UPS systems GUTOR, ALCAD
o Building Services - HVAC System, lighting & small power, Earthing system, Cathodic Protection of Pipelines
o Rising of Punch lists if the equipment is not as per drawing and standards.
o Generate the non-conformance report (NCR) and observation reports according to the quality management Procedure (QMP) and project quality procedure (PQP) project technical specification.
o Review subcontractor or supplier quality document submittals (Quality plans, inspection tests & plans, procedure.
o Review Material and Service Requisitions, bids tabs (including QA evaluation of bids), subcontracts and Purchase Orders.
o Monitoring and reporting the status of implementation of the Project Quality Management System and its effectiveness.
o Preparation and verification of monthly Invoices of concern activities.
o Inspection of Generators, Exciters, Unit Auxiliary Transformers, IPB(Insulation Phase bus duct), Unit Transformers, Station Transformers, GIB(Gas Insulated Bus Bar), Energization of PEECC, LCI, AC/DC Line Reactors, Air Conditioning System, UPS, Batteries, Central Control Building, MV/LV2 and Black Start Diesel Generator.
o Inspection of related equipment’s above said Jurisdiction i.e. is as following.
o Diesel Generator and MV/LV lines.
o Review of scope of work, project quality plan and procedures.
o Prepare and update quality control procedure (QCP) and the inspection test plan (ITP).
o Installation of Cables.
o Generate non-conformance report (NCR) and observation reports according to quality management procedure (QMP) and Project quality procedure (pap), Project technical specifications.
o Review subcontractor or supplier quality document submittals (Quality plans, Inspection Test & Plans, Procedures.
o Review Material and Service Requisitions, bid tabs (including QA evaluations of bids), subcontracts and Purchase Orders.
o Monitoring and reporting the status of implementations of the Project Quality Management system and its effeteness.
o Issuance of site instruction if any work delay or work not according to PTS or approved drawings or standards.

ELECTRICAL ENGINEER/STORE MANAGER at MW SIEMENS Combine Cycle Power Project TPS Guddu Sind Pakistan
  • May 1992 to January 1994

ELECTRICAL ENGINEER/STORE MANAGER MAY1992-JAN1994
PROCUREMENT OF MATERIAL WITH DIFFERENT METHODES.
300 MW SIEMENS Combine Cycle Power Project TPS Guddu Sind Pakistan
Mode of Procurement
o Preparing the accurate estimates and assessment of accurate material for tendering and proposals in order to ensure that they are competitive through and line with the company policy and objectives.
o ICB (International Competitive Bidding)
o EPC (Engineering Procurement construction)
o Country or nation wide bidding.
o Local/Emergency Purchase from local market.
o Allocation of material procured from sister formations.
Code
PPRA (Public Procurement Regulating Authority)
Company Policy
Wapda Purchase Procedure.
Wapda Book of Financial Power.
Wapda Schedule of Rates.
Deposit Works
Mode suppose the works which completely ordered to specialize formations those are Capabable of entire work with all means installation, commissioning etc like sui gas, wapda itself.
ESTIMATION OF EQUIPMENTS
All capacity of motors (AC/DC) i.e 6/0.4 KV motors Feed Pumps, ID/FD Fans, Cooling Fans motors. DC control motors for breakers, speed changers, Air pre-heaters, Tap changers, motors for burners, motors for fans for cooling system of transformers. DC aux. oil pumps, seal oil pumps, lubricating.
All Capacity of electric Panels.
All Capacity of LV/HV equipments.
All types of control panels, relays, pressure switches.
Excitation system. Impledane, reduction gear, field breaker.
All LV/HV/MV Switchgears and Panels.
All type of LV/HV Ear thing System.
All types of cables, conductors (dog, rabbit etc) aluminum or copper.
All equipments related to distribution system. Distribution Transformer, SF6 Breakers, insulators, isolators, Discs, Rotating Heads, Finger Strips, valves, accessories of transformer.
All types of oil suppose Furnace oil (hsfo/lsfo), HSD, lubricants, transformer oil etc.
All type of large batteries for Power houses/Grid stations/substations of 1200/730/500/110 AH.
All types of invertors/converters.
All types of generator accessories.
All types of AVR (Auto voltage Regulators)

Education

Bachelor's degree, Electrical Engineering
  • at metro manila
  • April 1991

Bsc in Electrical Engineering. Passport No:-CH1349172 Iqama No:- 2329485151

Specialties & Skills

Electrical Engineering
Maintenance Services
CIRCUITS
DIESEL GENERATORS
ENGINEER
GENERATORS
MAINTENANCE
TESTING

Languages

English
Intermediate

Memberships

Saudi Council of Engineers
  • Engineer
  • May 2009

Training and Certifications

Generation/Transmission/Distribution (Training)
Training Institute:
Wapda Academy Faisalabad Pakistan
Date Attended:
January 1994