Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Mukesh kumar saini, Senior Electrical Engineer

Mukesh kumar saini

Senior Electrical Engineer·Datum Technology

United Arab Emirates

Bachelor's degree, Electrical Engineering

Work experience

Total years of experience: 17 years, 11 months

Senior Electrical Engineer

September 2021 - Present

Datum Technology

Dubai, United Arab Emirates

September 2021 - Present

• Design project Relocation and Upgrade Altron modular Data center to 500KW and supported in Tier 3 certification.
• Handled multiple Fit out and villas project as per customer requirements.
• Electrical engineering project plan, real estate development project budgeting, building systems, cost management, utility calculation, Load Schedule & Max. Demand, layout drawing, Schematic
diagram, industrial machines and Motor control and electrical testing equipment, fit out and construction, close out Project delivery & project execution.
• Assisting and coordination technical design as required standards and building codes of HTM, DEWA, RTA, DM, CIBSE, IEC, IEEE, NEC, NFPA, & BS standard & regulations
• Fallowing environmental regulations, Electronic Components, Blueprints, Cad Submittal, Sld and
shop drawings.
• safe working practice, Health and safety, Personal Injuries, Comparing Eficient Initiatives &
Productivity
• Project coordination, Conduct Method statement, Risk assessment, permit to work, health and
safety practice.
• Arranging planning, fit out, Technical Information, construction, procurement, investigations, preparation of preliminary and detailed design including service corridor routing,
• Coordinating R&D, Cost Analyses, invoices, Claims, Profit Margins, Variation, Verification, Project reports accuracy, tender documentation and issued for construction drawings for projects,
• Electrical work, value engineering, Electrical power systems design and lighting calculations, electrical systems design, medium and low voltage systems, shop drawings, Voice notification, lightning protection, emergency lighting, IT infrastructure and security systems and provide technical guidance.
• Supported coordination power network systems Low Voltage, 11KV, 13.8KV and 22KV Power Distribution Networking and distribution substation, Road/streetlight-highway, and landscape lighting for infrastructure work,
• Knowledge in the computerized tools for engineering development design software ETAP, Dialux, AutoCAD, and MS Excel/Word Electrical Codes etc.
• Responsible for getting authority approvals submission such as power supply master plan, BNOC, LV design, Getting electricity and estimation approval from DEWA.
• Review engineering drawings of project electrical specifications drawings and assigned design criteria.
• Providing solutions to technical problems Project Cost Safety Regulations Technical Drawings technical issues.
• To coordinate with other design disciplines as required on a day-to-day basis or as set out by the
project requirements
• Accountability to Keep Project technical documentation, shipping, Quality Standards, Sustainable
Energy, Technical Tools.
• Responsible for operating procedures, Preventive Maintenance Plan Corrective Maintenance Plan and AMC, Service provider and periodic maintenance.

Company industry:
Electrical Engineering
Job role:
Information Technology

Senior Electrical Engineer

November 2017 - September 2021

EFS Services

Dubai, United Arab Emirates

November 2017 - September 2021

EFS Facilities Services is a regional leader in delivering integrated facilities management services across the Middle East, Africa, South Asia, and Turkey.

• Electrical engineering System equipment operations in Al Jalila and Al Rashid Hospital Trauma Center in Dubai.
• Electrical systems of Al Jalila Hospital Al Rashid Hospital Trauma center as Health Technical memorandum standards.
• Accountability electrical operations and maintenance of all outlets and associated logistics.
• Manage all Mechanical, Electrical archicad, and Plumbing (MEP) works, lead dedicated maintenance workforce
• Coordinating and negotiate service contracts, ensure compliance with regulations and periodic maintenance activities.
• Oversee all MEP-related works in all Outlets, Logistics centers & New projects,
• Ensuring compliance with national and local standards for Fit out and construction
• Conduct regular site inspections and audits of electrical systems and equipment to assess
functionality and safety.
• Lead and managing a multi-disciplinary Team of technician and engineers to handle multiple tasks as labor laws
• Develop and manage preventive and corrective maintenance programs for electrical systems and
equipment.
• Manage the renewal of AMCs for electrical services, ensuring competitive pricing and quality service.
• Evaluate existing contracts, negotiate terms, and establish new contracts with service.
• Build and maintain relationships with key service providers and contractors.
• Negotiating contracts and service agreements to secure cost-efective solutions.
• Ensure service providers adhere to company standards and timelines.
• Coordinate necessary permit applications and ensure compliance with local regulations Environment and codes for electrical installations and maintenance as per user manuals.
• Develop schedules for periodic maintenance of electrical and equipment systems, ensuring minimal disruption
• Monitor execution and compliance of scheduled maintenance tasks, provide reports, and direct corrective actions
• Prepare and maintain reports on maintenance activities, equipment status, and compliance with
regulations.
• Register Document procedures and maintain records of all service interactions and maintenance activities.
• Collaborate with other departments and stakeholders to coordinate operational activities and maintenance schedules.
• Communicate efectively with facility management, suppliers, engineers project requirements and
progress updates.
• Manage projects from Planning stage, Customer service, procurement, submission, Internal stakeholders, technical studies, deliver surveys, commercial acumen, Insurance surveys,
emergency services, Root Cause Analysis, review designs, materials, Repairs, Real-time Data,
accountability product documentation, Report Writing, Project Development of the due diligence reports and findings, one- and five-Year Asset Maintenance Plans of switchgear, Energy Management Plans, workflow, 3rd Party Inspections.

Company industry:
Facilities & Property Management

Electrical Engineer

April 2011 - November 2017

Serco Middle East Project-01-–King’s College Hospital

Abu Dhabi, United Arab Emirates

April 2011 - November 2017

KCH Healthcare LLC was established in 2015 to manage the Kings College Hospital and clinics in Dubai and operated by Kings College Hospital, London - the world-renowned British teaching hospital.
Key Responsibility

1. Electrical engineering Design Installation commissioning handover at Kings Clinic Hospital in London, Dubai. 2. Hospital MEP system designs, installations, commissioning, and maintenance Health point Hospital, Abu Dhabi. 3. Installation and Commissioning of MEP systems engineering with Machines (Kings Clinic Hospital, London, Dubai, UAE)
• Project Management, designing electrical services for hospitals building as per ADDC, BS7671, Health Technical Memorandum -02 Standard.
• Leading design team and medium size project management.
• Design of Low/Medium voltage electrical distribution system.
• Coordinating and specifications of all aspects of electrical services engineering include general services, low current system, fire alarm security and ICT systems in Fit out and construction.
• Engineering principles and Submission of Category-01 to Category-05 circuits.
• Design and specifications of internal and artificial lighting installations with switchgear
• Liaising with client representatives for approvals & quality control as per industry trends.
• Attending design workshops with architects and other design team members
• Design and specifications of electrical power and control to mechanical services
• Cost estimating and development of initial budget costs for electrical equipment.
• Liaise with site engineers to solve all technical design and shop drawings issues.
• Register department evaluation reports, sustainability and plan continues improvement
• Attending internal planning meeting and setting goals to meeting production programs
• Preparing department evaluation reports, and plan continues improvement

Project - 02- Serco Middle East -Project Health point Hospital Abu Dhabi, UAE, Facility Maintenance Electrical Engineer

Health Point Hospital -The 223, 000-square foot hospital and the 97, 000-square foot clinic are constructed on a 329, 000-square foot podium and comprise 78 beds over five floors with two levels of underground parking for 400 cars. The facilitys Centre objective was to create a robust and fully integrated private healthcare its infrastructure in Abu Dhabi.

Job Responsibility-

• Develop detailed electrical engineering designs for electrical projects
• Perform cost estimates, feasibility studies and Design Specification reviews
• Write technical Subject Matter reports sustainability and design documents
• Develop test data plans, protocols, and procedures for electrical equipment

Company industry:
Facilities & Property Management

Site & Maintenance Engineer (Electro-mechanical)

July 2008 - April 2011

SARVOTHAM CARE LTD (Pharmaceuticals Manufacturing & Healthcare)

Baddi, India

July 2008 - April 2011

Servo ham Care Healthcare (AMWAY) is one of the leading Indian companies marketing a wide range of health care products including pharmaceutical formulations, nutritional supplements, personal care products, Smart home care and hospital care products for a host of companies. The operations started on a humble beginning with the manufacture of pharmaceutical liquid orals, which in due course of time, expanded into manufacturing of other pharmaceuticals such as tablets, ointments, creams, cosmetics, home and health care products. The company scores high on each of the key drivers of your decision-making process. Servo ham Care Limited has been awarded ISO 9001(2000), EMS 14000(2004), Certificates GMP & Schedule M (FDA India)

Job Responsibility-

• Electrical Project Management of industrial Plant pharmaceuticals healthcare and cosmetics. India Servo ham Care.
• Complete inspection and survey of HT & LT in eight feeders Line, Preparation of cost comparison sheet for all suppliers & Sub-contractors ofer with project documentation.
• Complete scope of work, bill of hook materials packages, quantity preparation as per drawing. Monitoring and evaluation of Contractor job quality and progress as per Engineering Projects
• Site work executed with project safety and quality as per Technical Standards, Constructability, administer material management; ensure quality execution as per the design standards, Preparation of Project progress reports.
• Coordinate in Erection of 33KV and 11KV Outdoor Substation switchgear with overhead and
underground distribution with Control & Protection Equipment like Isolators, DO Fuses, Surge Arrestors, PLCs, LT ABC Cable as per detailed design and drawings.
• Make measurement sheet & billing sheet of project, Survey for BOQ of maintenance & Erection of Line & substation of Distribution system (33/11 KV) & all supported report.
• Attend project meetings and client Meetings, consultant, subcontractor and answer as well raising issues.
• Reviewing Commissioning Documents, Engineering Design, site selection, Product Data Sheet, Drawings and other Project related documents of the Mechanical, Electrical and Civil services
building materials in the overall building to create DLP resister and advice the Project team on rectification and planning.
• Coordinate Testing and checking installations and ensuring pre-commissioning plan and carry out
efectively ensuring building regulations and health and safety standards requirements.
• Responsible for defect liability of in Electrical switchgear and ELV Systems packages, Data canter
power system, CCTV IT Networks, Mechanical, Thermodynamics, HVAC, Fire Fighting and Alarm
system, renewable energy, Plumbing and Domestic Water drainage Systems, Storm water, Medical Gas System.
• Manage and monitor the workings of various departments in the organization, Channel Partners, Financial Reports statements and data, improve processes and policies in support of organizational goals, Presentations, establishment of organizational structure, delegation of tasks and accountabilities, establish work schedules. Supervise staf. Monitor and evaluate performance.
• Participated in calls and responded to afterhours problems and emergencies; and was required to return to duty within a specific recall time, Reported directly to the project manager.
• Continuous improvement for MEP system Industrial Controls, machinery, appliances, Manufacturing Machines, Neo Cota an Automatic Coating System for Tablets and Pellets. Cosmos Block.16/8- cylinder, Blister Quick Servo machine for packing of Tablets, Pam-Pac capsule filling machine, Safe line metal detector Machine, Automatic and Manual Tube filling machines, Induction sealing machine, punching machine, Conveyor belts, Mixing and Manufacturing vessels, 450-degree Fahrenheit Furness.

_______________________________________________________________________________________________

Company industry:
Manufacturing

Education

Sunrise Univercity

August 2009

August 2009

Bachelor's degree, Electrical Engineering

India

GPA (percentage): 72%

GPA (percentage): 72%

Bachlor of Electrical engineering

Skills

Testing
Expert
Testing
Expert
Preparation
Expert
Preparation
Expert
Commissioning
Expert
Commissioning
Expert
Installation
Expert
Installation
Expert
HVAC
Expert
HVAC
Expert
MS office
Expert
MS office
Expert
Maintenance Management Software (MMS)
Intermediate
Maintenance Management Software (MMS)
Intermediate
COMMISSIONING
Expert
COMMISSIONING
Expert
COORDINATING
Expert
COORDINATING
Expert
MECHANICAL ELECTRICAL AND PLUMBING (MEP) SYSTEMS
Expert
MECHANICAL ELECTRICAL AND PLUMBING (MEP) SYSTEMS
Expert
CONSTRUCTION
Expert
CONSTRUCTION
Expert
ELECTRICAL ENGINEERING
Expert
ELECTRICAL ENGINEERING
Expert
DRAWING
Expert
DRAWING
Expert
MANAGEMENT
Expert
MANAGEMENT
Expert
PLANNING
Expert
PLANNING
Expert
INSTALLATION
Expert
INSTALLATION
Expert
SWITCHGEAR
Expert
SWITCHGEAR
Expert
MS Office / Autocad 2012
Expert
MS Office / Autocad 2012
Expert
Computer Added Facility Management System (CAFM)
Expert
Computer Added Facility Management System (CAFM)
Expert
Testing
Expert
Testing
Expert
Preparation
Expert
Preparation
Expert
Commissioning
Expert
Commissioning
Expert
Installation
Expert
Installation
Expert
HVAC
Expert
HVAC
Expert

Languages

Hindi
Expert
English
Expert
Punjabi
Intermediate
Urdu
Intermediate

Training and Certifications

Certifications
Licensed Electrical Engineer
Feb 2014

Hobbies

  • NA