Piping Engineer
PT. Hyundai Engineering And Construction Co, Ltd
Total years of experience :11 years, 2 Months
• Review of P&ID, GA drawings & Isometric drawings related to the project.
• Loop marking in P&ID for the pressure testing of piping system.
• Material quantity takes off from the drawings.
• Material identification with respect to the test certificates.
• Coordination with Engineering Department and the Supervisors to resolve any discrepancy in the drawings.
• Fabrication Supervision with the Production Supervisor to meet the Schedule.
• Controlling of job material.
• Assembly Inspection and Verifications as per the drawings.
• To monitor the progress as per the Schedule of the Job and report the Area of Concern to the Project Managers.
• Prepare weekly and monthly progress reports.
• To give on the spot solution to minor problems encountered.
• To support the quality assurance & quality control in their activities & carry out stage inspection of Job whenever required.
• Monitoring and Inspect Piping works on Central Process Plant.
• Piping Visual Inspection Joint fit up, dimension and orientation check also welding visual check.
• Carry out Daily Welding Record.
• Request and Mark of NDE spot.
• Piping line check and punch list.
• Monitoring and Inspection Fabrication StorageTank as per API Std 650 Welded steel tanks for oil storage.
• Review Welding Procedure Specification (WPS), Supporting Procedure Qualification Record (PQR) and Welder Performance Qualification as per ASME Section IX.
• Review and Verification Document Inspection And Test Plant (ITP) and others Procedure for fabricated storage tank accordance with API Std 650.
• Monitoring and Inspection of Joint Fit Up, Roundness, Peaking, Plumbness.
• Monitoring and Inspection tank hydrostatic test, settlement check and also pneumatic test.
• Monitoring and Inspection of Piping Installation and Function test for water sprinkler pipe on the Condensate Storage Tank.
• Check and measured Tank volume with DIMET for commercial requirement.
• Review and verification of Inspection Report to completeness Manufacture Data Report (MDR).
• Review and verification ITP, WPS, PQR, MDR and Mill certificate material.
• Supervise and coordination to owner about welding activity coal bunker and ash silo also verification filler metal and visual inspection as per AWS D1.1 structural welding code steel.
• Witness Inspection NDT-PT, Radiographic Test according reference code or standard.
• Review radiographic film also NDT report as per ASME/ANSI B31.1 power piping.
• Prepared punch list record to piping system for releasing by contractor.
• Supervise and Inspection of boiler Installation and auxiliary, coal handling system and belt conveyor.
• Supervise and Inspection mechanical works to guarantee quality.
• Preparation and Supervise welder test coupon as per ASME Section IX.
• Welding visual inspection of piping system and boiler auxiliary as per ASME/ANSI B31.1 power piping.
• Supervise and inspection of hydrostatic test, settlement check and painting storage tank.
• Inspection material incoming according with document list no damage.
• Prepared inspection report document and Take Over Equipment (TOE) data.
• Supervise and inspection subcontractor works about install mechanical static and rotating, Install boiler and auxiliary, fabrication and Install piping system, install coal handling system and belt conveyor to guarantee quality.
• Supervise and inspection including install equipment mechanical static and rotating, piping fabrication and install, piping hydrotest, wrapping underground pipe, assembly coal handling system & belt conveyor, assembly jetty crane.
• Supervise fabrication storage tank, chimney and steel structure on site including painting system.
• Verification filler metal to welding accordance WPS.
• Witness inspection NDT-PT, UT, RT and PWHT.
• Review and verification Radiographic film also NDT report as per AWWA D100 Welded carbon steel tanks for water storage and API Std 650 Welded steel tanks for oil storage.
• Review and verification mill certificate material and Manufacture Data Report (MDR).
• Carry out fabrication pipe spool.
• Erection pipe spool, install and joint fit up on site.
• Install pipe support.
• Carry out close of punch list comment.
• 10 inch NPS fabrication pipe spool for serving pipe condensate line from cooling tower to wellhead.
• Erection pipe line, install and joint fit up.
• Fabrication and Install pipe support.
• Fabrication pipe spool.
• Erection pipe spool, install and joint fit up.
• Carry out piping hydrostatic test.
• Piping alignment to mechanical equipment.
• Precommissioning plan arrange and prepared to fabrication pipe spool temporary for water flushing and air blowing.
• Carry out of open and install any line pipe required to water flushing, air blowing and steam blowing according with owner standard.
• Restoration of pipe and component after flashing and blowing.
• Inspection incoming material piping and component according with document list.
• Documented of material shortage, excess and damage.
• Recording of requirement material to releasing for piping fabrication.
• Serving request of material piping and component according to drawing list for pipe spool fabrication.
• Check preparation drawing and arrange plan work to erection and install mechanical equipment static and rotating.
• Giving a duty also arrange and supervise works of install mechanical equipment static and rotating.
• Carry out preparation of equipment foundation check dimension center line to reference line, install also check elevation and leveling of padding plate or base plate.
• Carry out erection on the position and setting up mechanical equipment static and rotating accordance design drawing and assembly each of the component .
• Carry out Alignment shaft or coupling mechanical equipment rotating.
• Carry out supervise about to work furnace erection to get quality standard according requirement by client.
• Preparation document to request inspection to owner.
• Documented inspection report.
• Preparation and Verification technical drawing for fabrication pressure vessel.
• Re check material dimension before and after cutting plate.
• Documented work report.
• Backup of engineer job to carry out supervise about work install of booster compressor and gas generator engine.
• Documented work report.
1987 - 1992: Mechanical Engineering - Abulyatama University, Aceh.
1984 - 1987: Senior High School (SMAN-1) Bireuen.
1981 - 1984: Junior High School (SMPN) Ulee Gle.
1975 - 1981: Elementary School (SDN) Jangka Buya.