Muslim Ali, Piping Engineer

Muslim Ali

Piping Engineer

PT. Hyundai Engineering And Construction Co, Ltd

Location
Indonesia
Education
Bachelor's degree, Mechanical Engineering
Experience
11 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :11 years, 2 Months

Piping Engineer at PT. Hyundai Engineering And Construction Co, Ltd
  • Indonesia
  • March 2016 to June 2016

• Review of P&ID, GA drawings & Isometric drawings related to the project.
• Loop marking in P&ID for the pressure testing of piping system.
• Material quantity takes off from the drawings.
• Material identification with respect to the test certificates.
• Coordination with Engineering Department and the Supervisors to resolve any discrepancy in the drawings.
• Fabrication Supervision with the Production Supervisor to meet the Schedule.
• Controlling of job material.
• Assembly Inspection and Verifications as per the drawings.
• To monitor the progress as per the Schedule of the Job and report the Area of Concern to the Project Managers.
• Prepare weekly and monthly progress reports.
• To give on the spot solution to minor problems encountered.
• To support the quality assurance & quality control in their activities & carry out stage inspection of Job whenever required.

QC Engineer at PT. Tripatra Engineers & Contructors
  • Indonesia
  • December 2014 to July 2015

• Monitoring and Inspect Piping works on Central Process Plant.
• Piping Visual Inspection Joint fit up, dimension and orientation check also welding visual check.
• Carry out Daily Welding Record.
• Request and Mark of NDE spot.
• Piping line check and punch list.
• Monitoring and Inspection Fabrication StorageTank as per API Std 650 Welded steel tanks for oil storage.
• Review Welding Procedure Specification (WPS), Supporting Procedure Qualification Record (PQR) and Welder Performance Qualification as per ASME Section IX.
• Review and Verification Document Inspection And Test Plant (ITP) and others Procedure for fabricated storage tank accordance with API Std 650.
• Monitoring and Inspection of Joint Fit Up, Roundness, Peaking, Plumbness.
• Monitoring and Inspection tank hydrostatic test, settlement check and also pneumatic test.
• Monitoring and Inspection of Piping Installation and Function test for water sprinkler pipe on the Condensate Storage Tank.
• Check and measured Tank volume with DIMET for commercial requirement.
• Review and verification of Inspection Report to completeness Manufacture Data Report (MDR).

QA/QC Engineer at Rekadaya Elektrika Consult
  • Indonesia
  • November 2013 to November 2014

• Review and verification ITP, WPS, PQR, MDR and Mill certificate material.
• Supervise and coordination to owner about welding activity coal bunker and ash silo also verification filler metal and visual inspection as per AWS D1.1 structural welding code steel.
• Witness Inspection NDT-PT, Radiographic Test according reference code or standard.
• Review radiographic film also NDT report as per ASME/ANSI B31.1 power piping.
• Prepared punch list record to piping system for releasing by contractor.
• Supervise and Inspection of boiler Installation and auxiliary, coal handling system and belt conveyor.
• Supervise and Inspection mechanical works to guarantee quality.

QA/QC Engineer at PT. Rekadaya Elektrika
  • Indonesia
  • May 2012 to November 2013

• Preparation and Supervise welder test coupon as per ASME Section IX.
• Welding visual inspection of piping system and boiler auxiliary as per ASME/ANSI B31.1 power piping.
• Supervise and inspection of hydrostatic test, settlement check and painting storage tank.
• Inspection material incoming according with document list no damage.
• Prepared inspection report document and Take Over Equipment (TOE) data.
• Supervise and inspection subcontractor works about install mechanical static and rotating, Install boiler and auxiliary, fabrication and Install piping system, install coal handling system and belt conveyor to guarantee quality.

Mechanical Inspector at KSO-AGP
  • Indonesia
  • February 2011 to April 2012

• Supervise and inspection including install equipment mechanical static and rotating, piping fabrication and install, piping hydrotest, wrapping underground pipe, assembly coal handling system & belt conveyor, assembly jetty crane.
• Supervise fabrication storage tank, chimney and steel structure on site including painting system.
• Verification filler metal to welding accordance WPS.
• Witness inspection NDT-PT, UT, RT and PWHT.
• Review and verification Radiographic film also NDT report as per AWWA D100 Welded carbon steel tanks for water storage and API Std 650 Welded steel tanks for oil storage.
• Review and verification mill certificate material and Manufacture Data Report (MDR).

Piping Foreman at Gama Qatar Co WLL
  • Qatar
  • December 2008 to March 2010

• Carry out fabrication pipe spool.
• Erection pipe spool, install and joint fit up on site.
• Install pipe support.
• Carry out close of punch list comment.

Piping Foreman at PT. Sanggar Sarana Baja
  • Indonesia
  • February 2008 to June 2008

• 10 inch NPS fabrication pipe spool for serving pipe condensate line from cooling tower to wellhead.
• Erection pipe line, install and joint fit up.
• Fabrication and Install pipe support.

Piping Foreman at PT. Yasa Industri Nusantara (YIN)
  • Indonesia
  • September 2004 to April 2005

• Fabrication pipe spool.
• Erection pipe spool, install and joint fit up.
• Carry out piping hydrostatic test.
• Piping alignment to mechanical equipment.

Foreman Precomm at PT. Rekayasa Industri (Persero)
  • Indonesia
  • April 2003 to November 2003

• Precommissioning plan arrange and prepared to fabrication pipe spool temporary for water flushing and air blowing.
• Carry out of open and install any line pipe required to water flushing, air blowing and steam blowing according with owner standard.
• Restoration of pipe and component after flashing and blowing.

Field Engineer at PT. Kelsri
  • Indonesia
  • July 2002 to December 2002

• Inspection incoming material piping and component according with document list.
• Documented of material shortage, excess and damage.
• Recording of requirement material to releasing for piping fabrication.
• Serving request of material piping and component according to drawing list for pipe spool fabrication.

Mill Wright Foreman at PT. Perkasa Konstruksindo Nusajaya
  • February 1998 to May 1998

• Check preparation drawing and arrange plan work to erection and install mechanical equipment static and rotating.
• Giving a duty also arrange and supervise works of install mechanical equipment static and rotating.
• Carry out preparation of equipment foundation check dimension center line to reference line, install also check elevation and leveling of padding plate or base plate.
• Carry out erection on the position and setting up mechanical equipment static and rotating accordance design drawing and assembly each of the component .
• Carry out Alignment shaft or coupling mechanical equipment rotating.

QC Furnace at PT. Perkasa Konstruksindo Nusajaya
  • Indonesia
  • September 1997 to December 1997

• Carry out supervise about to work furnace erection to get quality standard according requirement by client.
• Preparation document to request inspection to owner.
• Documented inspection report.

Engineering at PT. Texmaco Perkasa Engineering
  • Indonesia
  • February 1995 to November 1996

• Preparation and Verification technical drawing for fabrication pressure vessel.
• Re check material dimension before and after cutting plate.
• Documented work report.

Asst. Mechanical Engineer at PT. Moeladi
  • Indonesia
  • October 1994 to December 1994

• Backup of engineer job to carry out supervise about work install of booster compressor and gas generator engine.
• Documented work report.

Education

Bachelor's degree, Mechanical Engineering
  • at Abulyatama University
  • January 1992

1987 - 1992: Mechanical Engineering - Abulyatama University, Aceh.

High school or equivalent,
  • at Senior High School
  • January 1987

1984 - 1987: Senior High School (SMAN-1) Bireuen.

High school or equivalent,
  • at Junior High School
  • January 1984

1981 - 1984: Junior High School (SMPN) Ulee Gle.

High school or equivalent,
  • at Elementary School
  • January 1981

1975 - 1981: Elementary School (SDN) Jangka Buya.

Specialties & Skills

COAL FIRED
CONVEYOR
DRAWING
ENGINEER
FABRICATION
INSPECTION
WELDING

Languages

English
Intermediate

Training and Certifications

Welding Inspector & International Welding Inspection Personel (Training)
Training Institute:
B4T - Bandung. Indonesia
Date Attended:
September 2010
Duration:
559 hours
NDT ASNT LEVEL 2 Radiographic Interpreter (Training)
Training Institute:
B4T - Bandung. Indonesia
Date Attended:
January 2014
Duration:
112 hours