Mustafa Fadel, HVAC , Predictive Maintenance and Reliability  Supervisor

Mustafa Fadel

HVAC , Predictive Maintenance and Reliability Supervisor

( DLNG) Damietta LNG Plant

Location
Egypt - Alexandria
Education
Bachelor's degree, BSc, Mechanical Power Engineering
Experience
31 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :31 years, 2 Months

HVAC , Predictive Maintenance and Reliability Supervisor at ( DLNG) Damietta LNG Plant
  • Egypt - Damietta
  • My current job since December 2007

Damietta LNG Plant DLNG (MULTI National Co.)
From 15/08/2007 Till Now AS HVAC&R , Predictive Maintenance And Reliability Supervisor in Damietta Liquefaction Natural Gas LNG ( DLNG Plant)Gas
HVAC systems ( Design, Installation, Commissioning, Maintenance and Troubleshooting)
Condition Monitoring and certified Vibration Analyst CAT II

HVAC systems ( Design, Installation, Commissioning, Maintenance ,Troubleshooting ) and supervisor at Damietta Liquefaction Natural Gas DLNG Plant
  • Egypt - Damietta
  • My current job since December 2007

o managements of daily work activities
o Coordination of Design, construction and maintenance planning
and scheduling
o Root causes Troubles analysis for the Weak points in work
systems or failure equipment according standards
o Troubleshooting, material and spare parts retain and management
o Sub Contractor construction activities and evaluation of contractors and subcontractors performance
o Putting the jobs procedures for Design, Constructions and maintenance activities, man power and man hours which required for this jobs
Technical negotiations with HVAC& R material and HVAC&R
equipment suppliers and putting the technical specs for required equipments According standards (ASHRAE, AMCA, ASME, ASTM, NFPA, SMACNA, AHRI…. And so on)
o Writing technical reports and Key Performance Indicators (KPI's)
o Implementation of CMMS programs (Emback - Ocen . Maximo etc. ) in all HVAC&R works activities
Applying Commissioning and start up Procedures for all new projects according ( ANSI/ASHRAE 111-2010 standards and according SMACNA standard
1) Mechanical Engineer with experience in HVAC
2) Fluent in Arabic & English
3) experience in the GCC region
4) Ability to appoint distributor in the region Ability to conduct seminars, ability to represent in overseas trade exhibitions.
I'm free Lance instructor and have the ability to explain clarify and represent HVAC systems and equipment technically

AS a predictive and reliability Supervisor
o Responsible for measuring and analysis of all Plant rotating Equipment Vibration levels and recommending the proper action to other disciplines as a condition monitoring and predictive maintenance to increase plant availability and reliability
o Responsible for using Thermal Infrared camera for all plant Electrical Transformers and equipment to take thermal pictures and analysis for these pictures to avoid any overheating and sudden failures as a condition monitoring and predictive maintenance systems
o Responsible for issuing all Reliability and predictive Weekly and Monthly Condition Monitoring Reports including the plant availability and predictive maintenance activities

Heating, Ventilating, Air-Conditioning and Refrigeration Engineer at Spanish Egyptian Gas -SEGAS LNG PLANT in Maintenance Department
  • Egypt - Damietta
  • My current job since April 1993

• From 15/08/2007 till now in SEGAS LNG PLANT in Maintenance Department and responsible for: •
Implementation of Construction and Maintenanceo managements of daily work activities
o Coordination of Design, construction and maintenance planning and scheduling
o Root causes Troubles analysis for the Weak points in work systems or failure equipments according standards
o Troubleshooting, material and spare parts retain and management
o Sub Contractor construction activities and evaluation of contractors and subcontractors performance
o Putting the jobs procedures for Design, Constructions and maintenance activities, man power and man hours which required for this jobs
o Technical negotiations with equipment material and HVAC&R equipment suppliers and putting the technical specs for required equipments According standards (ASHRAE, AMCA, ASME, ASTM, NFPA…. And so on)
o Writing technical reports and Key Performance Indicators (KPI's)
o Implementation of CMMS programs (Emback - Ocen . SAP etc. ) in all Maintenance works activities
o Modified and Re design some of mechanical systems For Modified the chilled water circuit for Wax Plasticize unit to make the chiller run continuously and improve the unit efficiency and unit performance
 2 Years In SAUDI Arabia As a project manager ( New Career) responsible for :
 Management of project for 4 million sq. meter university buildings
 Project Manager for the project with 7 department managers
 Responsible for Design and construction for electromechanical equipments for labs and HVAC&R Using AutoCAD program
 Responsible for controlling engineers, technicians and labors
 Solve the project problems and reporting the progress of the project
 Controlling the Cost of material and equipments (heavy and light)
 Put the schedule of steps of progress and time schedule for all departments
 Coordination between all 7 departments of the project
 Weekly report has been issued every week

Mechanical Engineer/Section Head at Alexandria petroleum Co
  • Egypt - Alexandria
  • April 1993 to December 2007

o managements of daily work activities
o Coordination of Design, construction and maintenance planning and scheduling
o Root causes Troubles analysis for the Weak points in work systems or failure equipments according standards
o Troubleshooting, material and spare parts retain and management
o Sub Contractor construction activities and evaluation of contractors and subcontractors performance
o Putting the jobs procedures for Design, Constructions and maintenance activities, man power and man hours which required for this jobs
o Technical negotiations with equipment material and HVAC&R equipment suppliers and putting the technical specs for required equipment According standards (ASHRAE, AMCA, ASME, ASTM, NFPA…. And so on)
o Writing technical reports and Key Performance Indicators (KPI's)
o Implementation of CMMS programs (Emback - Ocen . SAP etc. ) in all Maintenance works activities
o Modified and Re design some of mechanical systems For Modified the chilled water circuit for Wax Plasticize unit to make the chiller run continuously and improve the unit efficiency and unit performance
 2 Years In SAUDI Arabia As a project manager ( New Career) responsible for :
 Management of project for 4 million sq. meter university buildings
 Project Manager for the project with 7 department managers
 Responsible for Design and construction for electromagnetically equipment for labs and HVAC&R Using Auto Cad program
 Responsible for controlling engineers, technicians and labors
 Solve the project problems and reporting the progress of the project
 Controlling the Cost of material and equipment (heavy and light)
 Put the schedule of steps of progress and time schedule for all departments
 Coordination between all 7 departments of the project
 Weekly report has been issued every week

HVAC systems ( Design , Maintenance , Installation and commissioning ) Supervisor at Alexandria Petroleum Company ( April,1993 to December 2007)
  • Egypt - Alexandria
  • April 1993 to December 2007

HVAC systems ( Design - Maintenance - Construction and cooissioning)
Design all HVAC systems for different buldings
Select the suitable Equipment for HVAC systems
o managements of daily work activities
o Coordination of Design, construction and maintenance planning and scheduling
o Root causes Troubles analysis for the Weak points in work systems or failure equipments according standards
o Troubleshooting, material and spare parts retain and management
o Sub Contractor construction activities and evaluation of contractors and subcontractors performance
o Putting the jobs procedures for Design, Constructions and maintenance activities, man power and man hours which required for this jobs
o Technical negotiations with HVAC& R material and HVAC&R equipment suppliers and putting the technical specs for required equipments According standards (ASHRAE, AMCA, ASME, ASTM, NFPA, SMACNA, AHRI…. And so on)
Freelance Internationl HVAC instructor in Gulf Area
o Writing technical reports and Key Performance Indicators (KPI's)
o Implementation of CMMS programs (Emback - Ocen . Maximo etc. ) in all HVAC&R works activities
Using HAP for Design cooling and Heating
Applying all standards procedures for HVAC systems commissioning and start up

King Khaled University Project Manager and Consultant at king khaled university
  • Saudi Arabia - Abha
  • August 2004 to August 2006

2 Years Leave without pay Through working in Alex. Petroleum Company
15/08/2004 To 15/08/2006
King Khaled University Project Manager and Consultant
And it is other qualifications with other experience


• 2 Years In SAUDI Arabia As a project manager responsible for: • Management of project for 4 million sq. meter university buildings
• Project Manager for the project with 7 department managers
• Responsible for Design and construction for electromechanical
equipments for labs and HVAC&R Using AutoCAD program
• Responsible for controlling engineers, technicians and labors
• Solve the project problems and reporting the progress of the project
• Controlling the Cost of material and equipments (heavy and light)
• Put the schedule of steps of progress and time schedule for all
departments
• Coordination between all 7 departments of the project (attached)
• Weekly report has been issued every week
• Reduction of project coast with a good management
• Faculties Building: 3000 T.O.R. As Roof Top DX. Package Units.
• Main Library Building: 650 T.O.R. As Roof Top DX. Package
Units.
• Laboratories Building: 1400 T.O.R. As Chilled Water System
• Main Theater Building: 800 T.O.R. As Chilled Water System.
• Restaurant Building:250 T.O.R. As Roof Top DX. Package Units.


• Mosque Building: 180 T.O.R. As Free Stand Units
• Aware of all HVAC&R material suppliers and companies in Saudi
Arabia such as FAWAZ CO., Marium Corporation, GGC for Grills and HVAC&R equipments suppliers (Train, York, Carrier, LG and
El Zamel)

Education

Bachelor's degree, BSc, Mechanical Power Engineering
  • at Faculty of Engineering - Alexandria University
  • July 1989

• Arabic language as mother tongue. • Fluency of spoken & written English. • Proficient use of Windows, Excel, Word, Access, PowerPoint, and Office software. • Proficient use of AutoCAD, Internet. • Proficient to use all CMMS applications • Ability to troubleshoot equipment problems, failures and performance • Proficient in communicating with others and technical negotiations with very good communication skills • Ability for supervising maintenance personnel (10 years experience) • Have the supervisory skills to work with different mentalities and cultures • Ability to work well under pressure. • Ambitious, Co-operative, Hardworking, Self-motivated, Creative & Team Worker. • 25Years Experience in maintenance in oil and gas field o 15 Years experience in maintenance and Engineering department in Alexandria Petroleum Co. For refinery (OIL FIELD) Alexandria University, Alexandria, Egypt. BSc. in Power Mechanical Engineering (Very Good Honors), Ranked ninth of 140 students. 1985-1989 o 10 Years (until now) in LNG plant (SEGAS LNG PLANT - UNION FENOSA Gas) GAS FIELD as HVAC systems design, installation , maintenance and troubleshooting 0. Professional in using Hourly Analysis program HAP software to design HVAC cooling and Heating loads 0. Professional in using all Duct Sizer Software to design Air ducts systems

Bachelor's degree, BSC, Mechanical Power Engineering
  • at Faculty of Mechanical power Engineering Alexandria University
  • June 1989

• Aware of international standards ( API, ASTM, ASME, AMCA, NFPA, SMACNA, .etc.) • Freelance instructor for Maintenance applications and Maintenance types • Freelance instructor for HVAC&R calculations and maintenance and conducted A lot of courses for most of Oil and Gas companies in Middle East and Gulf area for Engineers and Technicians Aware of most of HVAC systems and Air Ducts Systems design tools and software such as HAP ,...

Specialties & Skills

تكييف
Maintenance
Commissioning
HVAC Design
AutoCad Skills
AIR CONDITIONING
CHILLED WATER
MAINTENANCE
PROGRESS
PROPOSALS
REFRIGERATION
SYSTEMS DESIGN
HVAC-R consultant

Languages

Arabic
Expert
English
Expert

Memberships

ASHRAE USA Member
  • ( ASHRAE USA ID : 8113320 )
  • February 2011
Mobius Institute Certified Vibration Analyst CAT II
  • Certification Number: M-150715-01
  • May 2015
Egyptian Engineers Syndicate
  • Member + Consultant
  • August 1989

Training and Certifications

Vibration Analyst Category II (Certificate)
Date Attended:
August 2022
Training Certificate (Certificate)
Date Attended:
February 2010
Valid Until:
February 2010

Hobbies

  • كرة القدم
    ثلاث بطولات متتالية نظمتها الشركة بين الادارات المختلفة