Construction Project Manager
AL Fattan Contracting Properties Management
Total years of experience :28 years, 0 Months
Dredging Reclamation including sheet piling, Roro Ramp work at Abu Dhabi UAE.
Project work include Offshore field of Dredging & Reclamation sand field 7.5 million, including rock revetment of 2.1Km.
Envisioning barge planning for managing vessels of various sizes to achieve effective discharge loading and unloading.
Construction methodology of piling for marine jetty.
Logistic requirement & management for efficient site management.
Planning of CSD 800 & 850 allocation at dredging point to get maximum dredge material.
Supporting to the QS department to prepare & calculation piping requirement.
Managing, directing supervision and controlling the quality & project progress.
Ensuring company policy for technical, safety quality and environment to be correctly addressed and implemented.
Identifying and bottlenecks and recommend corrective action to ensure smooth and timely completion of each construction
phases.
Leads and motivate to the project team, ensuring effective implementation of approved project plan.
Handling all correspondence with construction related from end users, other division, consultants, contractors, long lead
suppliers, and local authorities, to take immediate appropriate action in coordination to resolve and problem to ensure
uninterrupted progress of work.
To be ensure all TRA - (Task Risk Analysis) to be updated before starting any construction activity.
Ensure all crew member and filed supervision perform work in a safe manner and follow established safe work practices and
protocols.
Offshore of largest sour gas project contributing self -sufficient and transition to a potential gas exporter, Dredging land Reclamation
including marine construction work of the Ghasha concession of 10 no’s of Artificial Island Client ADNOC - Abu Dhabi.
Role:
Framed short & long-term strategies and project plans for creating project operations, monitoring construction activities as per
design & drawing, & construction materials quality
Project work include Off shore Field of ECW work package, Construction of Holding Pond, Excess Boat jetty, Davit crane installation,
Quay wall jetty, RORO Ramp, including Marine furniture installation
Reviewed project inception plan & created a systematic layout on quantifiable parameters including estimation of take-off costs,
analysing project constructability, project buy-out, scopes of work, sub-contracting requirements, project profitability and
scheduling
Drove strategic & enterprise level assessment of project volume impacts focusing on financial impact & understanding of
operational pressures
Defined project objectives and plans, including delineation of scope, budgeting, scheduling, setting performance requirements and
creating a detailed project planning schedule
Created preliminary estimation, detailed project material and cost breakdown, budget estimation and other related estimations
Collaborated with Engineers & Subcontractors to ensure synergy at all levels ensuring smooth and efficient management of all
project operations
Maintained necessary records at site of project detailed breakdowns & quotation preparation, and labour & drawing register
Ensured all TRA - (Task Risk Analysis) to be updated before starting any construction activity
Managed all aspects of management of contractors and established processes to control the delivery of the work
Onshore Crude Oil Flexibility project (CFP) under Samsung Client of ADNOC project in Abu Dhabi AL Ruwais. RCC Pipe sleeper
construction & installation, UG GRP piping, Pump Foundation, Local Foundation & Easement work.
Role:
Project work includes Brown & Green Field of ADNOC Plant, Pipe Rack foundation, Deep Excavation, Sleepers foundation, Pump
Foundation, UG piping incl. Concrete slope protection work
Mumbai Worli Piramal Reality Project as
Contract Head
SBUT (Saifee Burhani Upliftment Trustee) Rehab Redevelopment including Retail Shop, Demolition of Old Heritage Structure and
Development of Mosque Sub Cluster - 01 Bhendi Bazar.
Floor Storied Building located at South Mumbai (Shell & Core Structure, Project Value - 100 Crore INR)
Saudi Aramco Total Oil Refinery Project (SATORP), Jubail 2, Saudi Arabia, Project value - 80 Millions.
84 floor Storied High Rise Building of 300 Meter Height at Mumbai (work up to 4th
Podium Level).
Construction of building with B+G+8P+38TYP + Service Floors + 2 Duplex + Roof + helipad
G+7 and G+4 floor international luxury residential complex of Nakheel Project, AWIR, Dubai, UAE.
Ground stability making for crude oil farm tank using Vibro-floatation technique and feeding stone aggregate.
Optical Fibre Cable Laying Project in Backbone Area including Hilly, Marshy Land Area.
14 Floor High Rise NRI Cidco SEA Wood Complex, Nerul- New Mumbai.
courses: PDU Certified from PMI Project Management Prince2 Foundation & Prince2 Practitioner
Board of Technical Examination 03 Year Diploma in Civil Engineering from Shree Ram Polytechnic Airoli