Total years of experience :13 years, 5 Months

Pipeline Supervisor at Nigeria Liquefied Natural Gas Company
  • Nigeria
  • My current job since December 2016

Pipeline Right of Way surveillance and inspections via chopper overfly and drive through.
•Collate surveillance reports from contractors and report to Head of pipelines.
•Carry out routine inspections and maintenance activities on above ground piping, pig traps and all critical equipment within the Gas Transmission Stations at remote locations.
•Oversee third party contractor carry out integrity activities (Cathodic Protection, UT, Intelligent Pigging and Wall thickness check) on the pipeline.
•Prepare and submit to Head Pipelines weekly activity progress report.
•Conduct and supervise routine pigging, venting and condensate evacuation within the Gas Transmission Station.
•Prepare Right of Way contractors’ payment schedule for surveillance and maintenance of the ROW.
•Populate the annual GTS Integrity and Inspection Plan and submit to Head pipelines for review and approval.

Project Supervisor at CANDIX Engineering Nig. Ltd (for NLNG)
  • Nigeria
  • December 2014 to November 2016

Client: Nigeria LNG. Project: CONDNSATE KNOCK-OUT VESSEL INSTALLATION.

Duties and Responsibilities:
•Act as Company representative to ensure design work meets Company standards and relevant international/industry codes.
•Coordinate/Conduct routine and continuous Gas testing and monitoring with a PGM at Gas Transmission Stations and location of work.
•Coordinate task needed for Project execution including survey, Permit issuance, procedure/job hazard reviews, installation procedure and testing.
•Developed a system to help identify any issue that would impede progress of the project, repot to senior project coordinator and follow up on close out timely.
•Inspect and supervised high risk excavation within live facility to accommodate the knock-out vessel and 292m drain line pipe laying.
•Supervised the installation of LEVOLUX structural/shelter fitting for the vessel cover, and welding activities within the facility.
•Identifying and documenting of anomalies, non-conformities detected and ensuring adequate close-out is carried out.
•Prepare and present daily reports, weekly reports, and construction progress reports as required.

Project Engineer at CANDIX Engineering Nig. Ltd (for NLNG)
  • Nigeria
  • February 2012 to November 2016

Client: Nigeria LNG. Project: OML 58 UPGRADE/O.U.R 42”x45km PIPELINE PROJECT.

Duties and Responsibilities:
•Act as Company representative to ensure design work meets Company standards and relevant international/industry codes.
•Participate in the review of design bases, drawings, specification and installations procedure.
•Coordinate task needed for Project execution including survey, Permit issuance, procedure/job hazard reviews, installation procedure and testing.
•Inspect and Oversee contractors’ safety activities on site, follow up on corrective and preventive actions, emergency response plan and assist in safety trainings, inductions and orientation.
•Identify, evaluate and develop hazard control methods and practices in the workplace.
•Develop methods of ensuring existing facilities within and outside the Gas transmission nodes are not affected during ROW clearing and preparation.
•Control and manage the application of electronic PTW for all activities on the project and ensuring the conditions set are adhered to in the course of work.
•Represent NLNG at weekly/monthly meetings, construction progress meetings, and safety committee meetings.
•Managed PTW, Supervised and monitored the HOT-TAP activities and welding of “Split-T” on NLNG 28” pipe within UBETA node.
•Monitored the preparations and plans for pre-commissioning, commissioning and start-up of pipeline, mechanical equipment packages and metering analyzer.
•Monitor as-built documentation prepared by contractor for close-out reports.
•Maintain pipeline records of all existing pipelines in order to avoid unplanned pipeline crossing.

Safety Supervisor at ALSTOM Power
  • Nigeria
  • August 2010 to September 2011

Project: C-Inspection for GT13 Okoloma Power Generation Plant (AFAM VI)

Duties and Responsibilities:
•Conducted daily tool box meetings and safety pep talks.
•Ensured adequate orientation and training on the use of required PPE’S, distribution at work site.
•Ensured prompt facilitation of PTW on daily basis and its re-validation when due.
•Ensured that confined space activities, “Lock-out Tag-out”, isolations, personnel ingress and egress into restricted areas are monitored.
•Conduct Drill Regularly.
•Identify safety issues likely to impede the progress of work, close them out and document cosed-out items as required.
•Promote and coordinate First-Aid.
•Inspected waste management system on a daily basis for proper segregation.
• Supervised the use of corrosive and hazardous chemicals to ensure every personnel using them have basic understanding of the MSDS (material safety data sheet).
•Returned daily reports, anomaly reports, MTC report, near misses and accidents reports (where applicable) to HSE Coordinator for record purposes.

Education

Bachelor's degree, Electrical Engineering
  • at University of PortHarcourt
  • October 2009

options in Power and electronics

Higher diploma, Physics and Electronics Tech
  • at Federal University of Technology Owerri
  • November 2005

semi-conductor technology and applications to electronic components

Diploma, Science Laboratory Technology
  • at Federal University of Technology Owerri
  • October 2003

Understanding and application of laboratory research techniques.

Specialties & Skills

Reporting
Site Inspection
Natural Gas pipelines
Permitting
Document Control
CUSTOMER RELATIONS
DOCUMENTATION
FIRST AID
MECHANICAL
MEETING FACILITATION
PROGRESS
TRANSMISSION
WELDING

Training and Certifications

E-VISION Permit System (Training)
Training Institute:
NigeriaLNG Learning center
Date Attended:
March 2013
Duration:
24 hours

Hobbies