Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
omar salih, Resident Engineer

omar salih

Resident Engineer·GHD GLOBAL

United Arab Emirates

Bachelor's degree, Civil Engineering

Work experience

Total years of experience: 29 years, 10 months

Resident Engineer

November 2018 - Present

GHD GLOBAL

Abu Dhabi, United Arab Emirates

I found this job using Bayt.com

November 2018 - Present

Resident Engineer at GHD Global-Abu Dhabi

Project - 1039 construction and operations &maintenance of 4 Parks & Playground in Abu Dhabi Mainland.

Project Scope is to carry out the Following Works for (four Parks nos. 1, 2, 3, 4 at Shakbout City including but not limited to design
irrigation network and submit hydraulic calculation for all irrigation network

. Supply and install a complete irrigation network, soft
landscape, hard landscape, water features/M&E, shading structure/play & sport
equipment, lighting/wiring/cabling/street lighting/power supply, storm water system,
fences/gates works and all other related items, operate and connect to existing
system including removal of existing pipes and tapping points.

• Responsible for implementing standards and quality management on behalf of
the client.
• Working on project shop drawing review of Irrigation network, pumping stations and
chambers.
• Involved in determining the obstructed routs and finding alternative routes to ensure
the construction is going in accordance with town planning requirements.
• Decided the chambers and risers locations.
• Working on supervision of the irrigation network activities as well as checking
structural elements (foundations, retaining walls, columns beams and slabs).
• Ensuring each project is going in accordance with health and safety legislation.
• Ensuring that the project is going in accordance with its time and cost.
• Directing tasks to a multidisciplinary team of staff.
• Reviewing the project time schedule.
• Creating Weekly and Monthly Quality and Progress Reports.
• Carrying out inspections and also final inspections.
• Attending various meeting with the client, contractor, subcontractors and suppliers.

Company industry:
Civil Engineering
Job role:
Management

Resident Engineer

August 2017 - Present

M/S Dorsch Holding Gmbh – DC Abu Dhabi

Abu Dhabi, United Arab Emirates

August 2017 - Present

Project - MZ 203 Operation and Maintenance of landscape assets on Abu Dhabi Mainland (Khalifa City, Shakhbout City, Mohammed Bin Zayed City, Maqta Area, Abudhabi Gate Area)

• Responsible for implementing standards and quality management on behalf of the client.
• Working on project Operation and Maintenance of Irrigation network and pumping stations.
• Evaluating Contractor's Work Performance by using approved tools and methods (KPI and Tasks).
• Working on supervision of the irrigation network activities as well as checking structural elements (Water Tanks, Pump Rooms, and Chambers).
• Ensuring each project is going in accordance with health and safety legislation.
• Ensuring that the project is going in accordance with contract requirements and standards.
• Directing tasks to a multi-disciplined team of staff.
• Creating Weekly and Monthly Operation and Maintenance Reports.
• Attending various meeting with the client, contractor.

Company industry:
Civil Engineering
Job role:
Engineering

Resident Engineer

January 2014 - Present

Dorsch Holding Gmbh – DC Abu Dhabi

Abu Dhabi, United Arab Emirates

January 2014 - Present

Project - 499 Development of 5 Parks & Playgrounds in Abu Dhabi Mainland
Project Scope is to carry out the Following Works for (four existing Parks nos. 4, 5, 6,
7 at Al Shamkha) and (Al Adla new Park) including but not limited to
dismantle/remove/set aside or sent to store and reuse of existing assets, design
irrigation network and submit hydraulic calculation for all irrigation network
considering existing pumps. Supply and install a complete irrigation network, soft
landscape, hard landscape, water features/M&E, shading structure/play & sport
equipment, lighting/wiring/cabling/street lighting/power supply, storm water system,
fences/gates works and all other related items, operate and connect to existing
system including removal of existing pipes and tapping points.
• Responsible for implementing standards and quality management on behalf of
the client.
• Working on project shop drawing review of Irrigation network, pumping stations and
chambers.
• Involved in determining the obstructed routs and finding alternative routes to ensure
the construction is going in accordance with town planning requirements.
• Decided the chambers and risers locations.
• Working on supervision of the irrigation network activities as well as checking
structural elements (foundations, retaining walls, columns beams and slabs).
• Ensuring each project is going in accordance with health and safety legislation.
• Ensuring that the project is going in accordance with its time and cost.
• Directing tasks to a multidisciplinary team of staff.
• Reviewing the project time schedule.
• Creating Weekly and Monthly Quality and Progress Reports.
• Carrying out pre inspections and also final inspections.
• Attending various meeting with the client, contractor, subcontractors and suppliers.

Company industry:
Business Consultancy Services
Job role:
Civil Engineering

Resident Engineer

November 2015 - August 2017

M/S Dorsch Holding Gmbh – DC Abu Dhabi

Abu Dhabi, United Arab Emirates

November 2015 - August 2017

Project - 499 Operation and Maintenance of 5 Parks & Playgrounds in Abu Dhabi Mainland

Project Scope is to carry out the Following Works for Five neighborhood Parks at Al Shamkha and Al Adla including but not limited to Operation and Maintenance for the assets, irrigation network and pumps, soft landscape, hard landscape, water features(M&E), play & sport equipment, lighting /street lighting/power supply, storm water system, fences/gates works and all other related items.

• Responsible for implementing standards and quality management on behalf of the client.
• Working on project Operation and Maintenance of Irrigation network and pumping stations.
• Evaluating Contractor's Work Performance by using approved tools and methods (KPI and Tasks).
• Working on supervision of the irrigation network activities as well as checking structural elements (Water Tanks, Pump Rooms, and Chambers).
• Ensuring each project is going in accordance with health and safety legislation.
• Ensuring that the project is going in accordance with contract requirements and standards.
• Directing tasks to a multi-disciplined team of staff.
• Creating Weekly and Monthly Operation and Maintenance Reports.
• Attending various meeting with the client, contractor.

Company industry:
Civil Engineering
Job role:
Engineering

Acting Resident Engineer

September 2012 - December 2013

Dorsch Holding Gmbh

Abu Dhabi, United Arab Emirates

September 2012 - December 2013

Project - O-1463 Construction works Associated with Replacement of existing
AC Sewer Lines and Roads at Abu Dhabi Island.
The project consists of 9km Replacement of Existing Sewer Lines, 12km of New
Construction Sewer Lines, 460 construction of New Manhole, 3.7km NDM, 0.77km
Rehabilitation of Existing Sewer Lines and 17.8 km Abandonment of Existing Sewer
lines. The project designed to upgrade the existing Sewer Network to serve the
residents in Al Butane Area in Abu Dhabi Island up to 2030.
• Responsible for implementing standards and quality management on behalf of the
client.
• Working on project shop drawing review of Sewer network and Manholes.
• Involved in determining the obstructed routs and finding alternative routes to ensure
the construction is going in accordance with town planning requirements.
• Decided the chambers and Manholes locations.
• Working on supervision of the Sewer network activities as well as checking structural
elements.
• Ensuring that project is going in accordance with health and safety legislation.
• Ensuring that the project is going in accordance with its time and cost.
• Directing tasks to a multi-disciplined team of staff.
• Reviewing the project time schedule.
• Creating Weekly and Monthly Quality and Progress Reports.
• Carrying out pre inspections and also final inspections.
• Attending various meeting with the client, contractor, subcontractors and suppliers.

Company industry:
Business Consultancy Services
Job role:
Civil Engineering

Assistant Resident Engineer

September 2009 - June 2012

Dorsch Holding Gmbh

Abu Dhabi, United Arab Emirates

September 2009 - June 2012

Project-481 Construction works of Irrigation Main Lines at Khalifa-Town B.
The project consists of 1 pumping stations with reservoir in capacity of 1.9 million
gallons. The project designed to supply the city with Irrigation water through HDPE
pipe in different sizes (160, 225, 280, 400, 500) with length 68 km, 125 chambers and
300 risers.
• Responsible for implementing standards and quality management on behalf of the
client.
• Working on project shop drawing review of Irrigation network, pumping stations and
chambers.
• Involved in determining the obstructed routs and finding alternative routes to ensure
the construction is going in accordance with town planning requirements.
• Decided the chambers and risers locations.
• Working on supervision of the irrigation network activities as well as checking
structural elements (foundations, retaining walls, columns beams and slabs).
• Ensuring each project is going in accordance with health and safety legislation.
• Ensuring that the project is going in accordance with its time and cost.
• Directing tasks to a multi-disciplined team of staff.
• Reviewing the project time schedule.
• Creating Weekly and Monthly Quality and Progress Reports.
• Carrying out pre inspections and also final inspections.
• Attending various meeting with the client, contractor, subcontractors and suppliers.
Assistant Resident Engineer
 Project - 480 Construction works of Irrigation Main Lines at Khalifa-Town A.
The project consist of 5 pumping stations, each pumping station has reservoir with
capacity of 1.8 million gallons. The project designed to supply the city with Irrigation
water through HDPE pipes in different sizes (160, 225, 280, 400, 500) with length 142
km, 426 chambers and 980 risers.
• Responsible for implementing standards and quality management on behalf of the
client.
• Working on project shop drawing review of Irrigation network, pumping stations and
chambers.
• Involved in determining the obstructed routs and finding alternative routes to ensure
the construction is going in accordance with town planning requirements.
• Decided the chambers and risers locations.
• Working on supervision of the irrigation network activities as well as checking
structural elements (foundations, retaining walls, columns beams and slabs).
• Ensuring each project is going in accordance with health and safety legislation.
• Ensuring that the project is going in accordance with its time and cost.
• Directing tasks to a multidisciplinary team of staff.
• Reviewing the project time schedule.
• Creating Weekly and Monthly Quality and Progress Reports.
• Carrying out pre inspections and also final inspections.
• Attending various meeting with the client, contractor, subcontractors and suppliers.

Company industry:
Business Consultancy Services
Job role:
Civil Engineering

Senior Civil Engineer

April 2009 - September 2009

Bainuna Consulting

Abu Dhabi, United Arab Emirates

April 2009 - September 2009

Project Dusit Thani - Abu Dhabi

Dust Thani Abu Dhabi comprises 402 rooms and suites and 131 furnished executive
apartments, each offering modern lifestyle. Room types range in size from 36 to 450
sqm. Consist of 32 floors with ground Mezzanine and 4 basements.

•Identify the critical materials essential for the project construction.
•Responsible for quality control/quality assurance of engineering, construction and
documents.
•Attending various meeting with the client, consultant, contractor, subcontractors and
suppliers.
•Involved in a project that included the construction of the Hotel building, sewer
network, storm water network, Electrical cabling work and ducts constructions.
•Review construction shop drawings material submittal and method statements of
reinforcement, masonry, doors& windows, curtain walls, roofing system, general site
arrangement, etc).

Company industry:
Business Consultancy Services
Job role:
Civil Engineering

Construction Manager

February 2007 - April 2009

Al Quadra Project Management International LLC.

Abu Dhabi, United Arab Emirates

February 2007 - April 2009

Project Construction of Dante Abu Dhabi Development Infrastructure &
Holiday Inn Hotel Building (B+G+M+ 9 Typical).
The project consists of 12th floors, with 180 rooms and suits furnished to provide
modern lifestyle.
• Identify the critical materials essential for the project construction.
• Responsible for quality control/quality assurance of engineering, construction and
documents.
• Attending various meeting with the client, consultant, contractor, subcontractors and
suppliers.
• Involved in a project that included the construction of the Hotel building, sewer
network, storm water network, Electrical cabling work and ducts constructions.
• Review construction shop drawings material submittals and method statements of
reinforcement, masonry, doors& windows, curtain walls, roofing system, general site
arrangement, etc).
• Review construction shop drawings material submittals and method statements of
reinforcement, manholes, storm water network, irrigation network, child water
network, general site arrangement, etc).

Company industry:
Management Consulting
Job role:
Engineering

Assistant Resident Engineer

April 2004 - February 2007

Concept Consulting Engineers -Dubai

United Arab Emirates

April 2004 - February 2007

➢ Project

1) Construction of 4 phases sewerage Treatment Plant- Dubai.
2) Construction works Sewer Lines - Dubai.
The project consists of 4 phases of sewerage treatment plants each phase with capacity of 5000 qm per day.


• Reviewing construction drawings of Sewerage Treatment Plants and Sewer network.
• Involved in determining the work requirements to ensure the construction is going in accordance with government authority's and the client's requirements.
• Reviewing the planning and scheduling of work.
• Creating Monthly and Weekly Quality and progress Reports.
• Directing tasks to a multi-disciplined team of staff.
• Reviewing all types of work reports and decide which type of action shall be take for next step.
• Attending various meetings Progress with the client and contractor, Technical meeting with company technical staff and contractor.
Project 1) Construction of 4 phases sewerage Treatment Plant- Dubai.
2) Construction works Sewer Lines - Dubai.
The project consists of 4 phases of sewerage treatment plants each phase with
capacity of 5000 m^3 per day.
• Reviewing construction drawings of Sewerage Treatment Plants and Sewer network.
• Involved in determining the work requirements to ensure the construction is going in
accordance with government authority’s and the client’s requirements.
• Reviewing the planning and scheduling of work.
• Creating Monthly and Weekly Quality and progress Reports.
• Directing tasks to a multi-disciplined team of staff.
• Reviewing all types of work reports and decide which type of action shall be take for
next step.
• Attending various meetings Progress with the client and contractor, Technical
meeting with company technical staff and contractor.
• Project 1) Construction of building (G+M+16 Typical Building) -Sharjah.
2) Construction of building (G+M+3 +Health Club) - Naif Area /Dubai.
3) Construction (G+2 Typical Floors) Labor Camp.
4) Construction of Mosque-Dubai and 7 Nos. Villas- Dubai.
•Identify the critical materials essential for the project construction.
• Responsible for quality control/quality assurance of engineering, construction and
documents.
• Attending various meeting with the client, consultant, contractor, subcontractors and
suppliers.
• Involved in a project that included the construction of the Hotel building, sewer
network, storm water network, Electrical cabling work and ducts constructions.
• Review construction shop drawings material submittals and method statements of
reinforcement, masonry, doors& windows, curtain walls, roofing system, general site
arrangement, etc).

Company industry:
Business Consultancy Services
Job role:
Civil Engineering

Senior Project Engineer

November 2001 - February 2004

Al Dalih Contracting Company

Baghdad, Iraq

November 2001 - February 2004

Projects

1) Sewerage Treatment Plant -Baghdad.
2) Construction of Khark Hospital-Baghdad.
3) Construction Irrigation Open concrete lining Chanel-Samara.
Construction of Khark Hospital in Baghdad, the hospital has 250 beds, with 10
operation theaters, staff rooms, call centers, central kitchen and external clinic with
emergency department.
• Involved in a project that included the construction, maintenance and repair work on
buildings.
• Involving in buildings construction works.
• Involved in infrastructure construction work.
• Responsible for the preparing shop drawings, material submittal and method
statement.
• Preparing material orders.
• Identification of critical materials essential for the project construction.
• Ensuring that the project is going in accordance with its time and cost.
• Directing tasks to a multidisciplinary team of staff.
• Attending various types of meetings with the client, consultant, sub-contractors and
suppliers.

Company industry:
Civil Engineering
Job role:
Engineering

Project Engineer

November 1995 - March 2001

Al Murabah Contracting Company

Baghdad, Iraq

November 1995 - March 2001

Project
1) Sewerage Treatment Plant -Baghdad.
2) Construction of Khark Hospital-Baghdad.
3) Construction Irrigation Open concrete lining Chanel-Samara.
Construction of Khark Hospital in Baghdad, the hospital has 250 beds, with 10
operation theaters, staff rooms, call centers, central kitchen and external clinic with
emergency department.
• Involved in a project that included the construction, maintenance and repair work on
buildings.
• Involving in buildings construction works.
• Involved in infrastructure construction work.
• Responsible for the preparing shop drawings, material submittals and method
statement.
• Preparing material orders.
• Identification of critical materials essential for the project construction.
• Ensuring that the project is going in accordance with its time and cost.
• Directing tasks to a multi-disciplined team of staff.
• Attending various types of meetings with the client, consultant, sub-contractors and
suppliers.

Company industry:
Construction & Building
Job role:
Engineering

Education

Civil Engineering Baghdad University

January 1995

January 1995

Bachelor's degree, Civil Engineering

Iraq

GPA (percentage): 62.4%

GPA (percentage): 62.4%

Bachelor's Degree in Civil Engineering

Languages

Arabic

Beginner

English

Beginner

Memberships

Project Management Institute

Member

January 2008

Society of Engineers, U.A.E

Member

January 2006

Iraqi engineering union/Iraq

Member

January 1995

Hobbies and interests

Reading

Finished many project on time ,budget and quality . Built strong work team in projects.