MEP BIM Lead Coordinator Engineer
Porr Qatar
Total years of experience :17 years, 10 Months
Project Name: Design & Construction of Al Wakrah FIFA World Cup Stadium 2022
- Manage and supervise the work performed by shop drawings sub-contractor.
- Review MEP IFC drawings and ensure of approval from design consultant.
- Review MEP shop drawings ensure of approval from supervision consultant.
- Ensure all builders works drawings are comprehensive and discussed with the various engineers for the best implementation and installation of services in coordination with other parties.
- Review any impact on MEP services caused by architectural changes.
- Review the invoices of designer and shop drawings sub-contractors.
- Coordinating between all MEP trade subcontractors and project team.
- Leading and Managing a team of MEP CAD/Revit Technician
- Coordinate multidisciplinary models.
- projects have working in
- New college of law (NCL) project.
- Standalone health care project.
- Underground car park al Bidda UCP5&6 - UCP 7a&7b project
- Tarek bin Ziyad school project
- Proposed the development of Barzan camp 1 & 2
- Construction of 4 new schools at al Wajda
Village gardens Kattamya is a residential community sitting on 285, 000 square meters in new Cairo, modern standalone villas, townhouses, and apartments.
- prepare shop drawing, calculation, material takeoff and material submittal for the following: -
- building service
- infrastructure (storm, water, irrigation & sewerage network)
- lift stations
- Checking specification and bill of quantities.
- Preparing shop drawing (HVAC, firefighting& plumbing)
-Following up the consultant for drawings approval. .
-Preparing the coordination drawing between mechanical, plumbing, electrical, structure and architectural works.
- Preparing as-built drawings
• Heat load estimation.
• Equipment selection.
• Duct design & sizing (ASHRAE, SMACNA, DW 144/142/141, etc).
• Chilled water pipe design & sizing (BS, ASHRAE).
• ESP calculation.
• Pump head calculation,
• selection of air handling unit with heat recovery wheel, fan coil units
1- Checking specification and bill of quantities.
2- fully studying tender drawings
3- Preparing the shop drawings for firefighting, plumbing &
HVAC system.
4- Following up the consultant for drawings approval.
5- Preparing the coordination drawing between
mechanical, plumbing, electrical, structure and
architectural works.
6- Preparing as-built drawings.
cooling and heating load calculations for all types of building, equipment selection, psychometric analysis, building pressurization calculations, refrigerant and plumbing pipes, head loss calculation, pump selection, static pressure loss calculation, firefighting system pipe sizing, swimming pool fountain display calculation, preparation of bill quantities, preparation of design and shop drawing preparation
BSc project - Title: refrigeration & air conditioning (Cold storage and freezing plant) - Object: how to calculate the cooling load for the cold storage and freezing plant, - Grade: excellent