Project:
• Senoro Gas Development Project-Upstream Project for developing, constructing, producing, operating and transporting into
CPP Plant Integrated production facilities include Well Sites Facilities, Flow Line and Trunk Line, Central Gas Processing
Plant, Loading Material Facility, Condensate and Sulfuric Acid Liquid Storage Tank and Loading Facility, Top Side Facilities, Gas
Pipelines, Gas Receiving and Metering Station and other Offsite Facilities.
2 (two) type Jetty marine work for MOF Jetty and Condensate & Sulfuric Acid Loading Jetty with 2 (two) loading arm packages are to deliver the
Condensate Gas and Sulfuric Acid Gas from Storage tank to offloading facility. It is comprising:
a.154-meter-long jetty and condensate ship berth, 285-meter jetty head MD, BD, catwalk, fender, quick release hook, bollard, steel structure platform, safety equipment, control room building, etc. Infrastructure facilities
comprising a terminal operation administration building, workshop, warehouse, mess recreational, sub-station and other ancillary buildings.
b.Top side jetty and offloading material handling system including all piping & pipeline, mechanical, instrument, electrical works.
c.210, 000 bbl full containment condensate tank (2 storage tank)
d.110, 000 bbl full containment sulfuric acid tank (2 storage tank) + 110, 000 bbl full containment for emergency sulfuric acid storage tank
e. lnfrastructure facilities comprising a terminal operation and administration building, workshop, warehouse, mess recreational, sub-station
and other ancillary buildings.
Job Description:
a. Managing of main and sub-contractor of construction specialists who perform the actual field construction and development works in
accordance with requirements contained in the approved Construction plan, Drawings, Standard, Codes and Specification.
b. Reviews Site Construction Plan and Contract Agreement with main contractor, to become familiar with the details of the project, to-date
progress of the project, significant milestones and various project procedures.
c. Review, check and approve contractors' regular monitoring progress report, claims for payment and the verification of main contractor invoices for
construction execution to the project and keep the project meet with time schedule, quality, budget and safety.
d. Support construction and engineering at site in preparation of daily, weekly and monthly reports, gathering, data, obtaining drawings/deliverables
from vendors and home office engineering and other disciplines.
e. Preparing work of order contracts for the execution of civil maintenance, design, calculation, technical query and execution plan.
f. Review and check engineering drawings, understand project design basis, specifications, code, standard, contractual requirements and others.
g. Provide construction supervision support to ensure construction activities are well planned adequate resources are mobilized by contractor.
h. Attends a regularly scheduled meeting with main contractor to formally review the status of construction, the present challenges of the work
and the planned works and planned work's in the coming.
i. Operationand maintenance of pavement road, upgradingbridges, open drainage, water line and close drain, warehouse and workshop building,
marine work facilities and storage tank area, various civil works activities.
j.Manage, monitor and supervise all construction works discipline construction activities required to complete construction on schedule, budget
and meet with quality standard and safety requirement at site.
k. Review and check eng. drawings, standard, specification, other design document, understand project design basis and contractual requirements.
l. Monitor and ensure that current/latest revisions of construction drawings are being used to ensure the avoidance of construction errors being
made arising from incorrect information in the site