Mohamed Fazl Abdul Azeez, Senior Planner

Mohamed Fazl Abdul Azeez

Senior Planner

Focus Design Partner

البلد
قطر - الدوحة
التعليم
ماجستير, Project Manageemnt
الخبرات
16 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 3 أشهر

Senior Planner في Focus Design Partner
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ مارس 2023

Focus Design Partner, Qatar
Project - Lusail Circuit- Construction of Infrastructure, Racetrack and Building Client - Public Works Authority (PWA)

* Review and maintain planning control structures are developed and maintained in alignment with approved project Work Breakdown Structure (WBS).
* Monitor and control planning activities through all phases of project lifecycle by different Activity Codes and WBS.
* Provides direction to the contractor with respect to implementation of Projects Planning and Schedule, Progress Measurement Plans, KPIs and Procedures.
* Supervises and responsible for Long Range and strategic Planning activities for Projects including Major commodity demand forecasting and Manpower requirements.
* Analyze and issue copies of project progress and performance status reports in accordance with project reporting requirements.
* Assists the Planning Manager & Project Control Manager in providing independent evaluation and recommendations of contractor project performance.
* Participates and monitors the project Risk Analysis workshops and serves as primary reviewer of the contractor’s Risk Analysis Report.
Review the contractor monthly and weekly progress reports.
* Continuously review the master plans deliverables like procurement, engineering and
construction tracking plans to ensure the project are on tracking
* Assess and communicate schedule impact of change notifications.
* Monitor overall project progress status, achievement of major milestones, and evaluate
project performance in relation to planned performance.
* Attend internal project progress and performance status meetings as required.
*Send delay notification to the contractor accordance with the contractual requirements

SENIOR PLANNING ENGINEER في Hassanesco Trading and Contracting
  • قطر - الدوحة
  • نوفمبر 2017 إلى مارس 2023

www.hassanesco.com
* Contact the brainstorming workshop for collaborative planning to develop the construction
sequence and process, and define the Zone, WBS & WP (Work Package) for the project
planning and schedule.
* Analyze the required resources according to the company norms and standard rate, and
prepare the Cost and Resources loaded Baseline Program.
* Implement the project control Key Performance Index (KPI) to evaluate, forecast and
analyses the project performance and prepare an effective dashboard to analyses the KPIs.
* Generate the Progress Measurement System for Engineering Deliverables, and Procurement
Control Registry and ensure that the deliverables are in line with the Baseline Schedule and
report to the Project Team.
* Direct and assess the subcontractor baseline program and supervise the performance of the
works.
* Consolidate the detailed plan for testing & commissioning, authority approval process, and
closeout documentation with a responsibility matrix to follow up to complete the schedule on
time.
* Monitor and control the subcontractor procurement, engineering deliverables, and resources
ahead of the time frame.
* Identify the critical path activities and provide the recovery program to guide and assist to
mitigate the delay and complete the project on time.
* Send the delay notification and letter to the relevant stakeholders and update and monitor the
issue/delay log.
* Identify the required methodology to prepare the time impact analysis and submit the
Extension of time Claim (EOT) and revise the schedule as approved.
* Issue Notice of Delay to subcontractor and Evaluate the subcontractor’s Claims and
performance report.
* Prepare and submit a monthly progress report (MPR), and weekly progress reports (WPR)
and presenting during the progress meeting with Client.

SENIOR PLANNING ENGINEER في Hassanesco Trading and Contracting
  • قطر - الدوحة
  • نوفمبر 2017 إلى مارس 2023

• Contact the brainstorming workshop for collaborative planning to develop the construction sequence and process, and define the Zone, WBS & WP (Work Package) for the project planning and schedule.
• Analyze the required resources according to the company norms and standard rate, and prepare the Cost and Resources loaded Baseline Program.
• Implement the project control Key Performance Index (KPI) to evaluate, forecast and analyses the project performance and prepare an effective dashboard to analyses the KPIs.
• Generate the Progress Measurement System for Engineering Deliverables, and Procurement Control Registry and ensure that the deliverables are in line with the Baseline Schedule and report to the Project Team.
• Direct and assess the subcontractor baseline program and supervise the performance of the works.
• Consolidate the detailed plan for testing & commissioning, authority approval process, and closeout documentation with a responsibility matrix to follow up to complete the schedule on time.
• Monitor and control the subcontractor procurement, engineering deliverables, and resources ahead of the time frame.
• Identify the critical path activities and provide the recovery program to guide and assist to mitigate the delay and complete the project on time.
• Send the delay notification and letter to the relevant stakeholders and update and monitor the issue/delay log.
• Identify the required methodology to prepare the time impact analysis and submit the Extension of time Claim (EOT) and revise the schedule as approved.
• Issue Notice of Delay to subcontractor and Evaluate the subcontractor’s Claims and performance report.
• Prepare and submit a monthly progress report (MPR), and weekly progress reports (WPR) and presenting during the progress meeting with Client.

Lead Planning Engineer في Peninsular Petrotech Engineering W.L.L
  • قطر - الدوحة
  • أبريل 2012 إلى أكتوبر 2017

www.ppe.com.qa
* Well-built resources and cost-loaded Master Program for individual Projects using
Primavera with coordination of project team.
* Authored planning procedure, invoicing procedure, cost control procedure, risk
management procedure & change management procedure as per project scope and
standardized the processing system.
* Originated and implemented the Progress Measurement System (PMS), Cost Control
Registry (CCR), Change Control Log, and Earned Value Management System (EVMS)
template for project controlling to analyze and manage the project performances.
* Recognized the project risk, executed the risk management plan, and updated the registry
monthly basis.
* Prepared and liaised a 3-month revenue look-ahead for project-wise for the company and
followed up with the project manager to achieve the target value to maintain the company
cash flow & business goal.
* Assed the delayed event, issued the notice of delay to the concerned stakeholders and
analyzed the delay impacted with appropriate delay analysis techniques from the submitted
Claim for Extension of time (EOT), and revise the schedule as approved.
* Generated company project consolidated monthly revenue report, and WIP (Work in
Progress) report to reconsolidate with the finance department.
* Circulated WIP reports expediting pending invoices to Project Managers to control the
Company Cash Flow.
* Accountability to monitor the system reliability and manage the projects in the ERP-Project
and supply chain Modules.
* Closed the project as per close-out transmittals to avoid over-cost booking on the
completed project.

PLANNING ENGINEER في Linder-Depa Interiors L.L.C
  • قطر - الدوحة
  • يناير 2012 إلى مارس 2012

Created the project WBS, project cost codes, and the project baseline Budget in the
Primavera.
* Developed a detailed program for each work package to complete Master Program
according to the project requirement and coordinate with the project team
* Planned and allocated resources and provide recommendations to maintain required
progress.
* Coordinated with Subcontractor to improve the detailed activities plan as per the scope of
work under each work package.
* Identified the critical activities and distribute the preventive look ahead plan to the project
team to avoid the delay.

PROJECT PLANNING ENGINEER في Enermes Engineering Qatar
  • قطر
  • يناير 2011 إلى ديسمبر 2011

● Developed and updated baseline Schedule and resources histogram.
● Prepared weekly and monthly progress reports to the main contractor.
● Attended progress meetings with the main contractor and engineers.
● Assessed the contractor's delay and issued a recovery plan to recover the delay.
● Issued 2-weeks look ahead internal target programs to the project team to comply with the
baseline program without any delay.
● Registered the concern and issue, reported to the planning manager, and maintained the
logs.

Project Engineer في Samaco International Engineering & Construction
  • قطر
  • ديسمبر 2009 إلى ديسمبر 2010

● Planned the project, allocate resources and manage the project load.
● Planned and Scheduled the baseline program and run the schedule with actual data weekly
basis
● Coordinated with the main contractor to avoid miss-communication
● Provided technical ideas to our technical team
● Implemented safety procedures & environmental plans.
● Prearranged the site works day by day according to the site condition & laboratory and field
tests.

QUANTITY SURVEYOR في Natural Homes-Building Construction & Engineering (PVT) Ltd
  • سريلانكا - جافنا
  • يوليو 2007 إلى مارس 2009

● Planned, monitored, and controlled the Procurement control registry.
● Valuated progress and final payments of subcontractors
● Reviewed the subcontractor & supplier valuation of progress and final payments
● Co-ordinated with engineering and construction to assess the variations claims.
● Attended the progress meetings.
● Evaluated the quotation from suppliers/ subcontractors against the estimated budget.
● Reviewed job cost with Project Management team and highlighted any subcontractor/material
vendor

الخلفية التعليمية

ماجستير, Project Manageemnt
  • في University of Salford
  • أغسطس 2020

-

بكالوريوس, Quantity Surveyor
  • في Birmingham City University
  • مايو 2018

.) -

دبلوم عالي, Engineering Technology
  • في University Of Moratuwa
  • أغسطس 2006

.) -

Specialties & Skills

Primavera P6
Lean Construction
MS Project
MS Office tools
CUSTOMER RELATIONS
MICROSOFT WORKS
PROCUREMENT
PROGRESS
BUDGETING
CASH FLOW
CHANGE MANAGEMENT
COST CONTROL
planning
maintenance engineering
materials
primavera p6
operation

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.

العضويات

Chartered Institute of Building Management (CIOB£
  • Chartered Construction Manager
  • July 2023

التدريب و الشهادات

Advanced Planning & Scheduling-PSP Training (تدريب)
معهد التدريب:
Madras Management Training Institute-Qatar

الهوايات

  • Reading Books