Pothu Raju Khanta, Traffic Engineer/Modeler

Pothu Raju Khanta

Traffic Engineer/Modeler

PARSONS INTERNATIONAL LTD

البلد
قطر
التعليم
الثانوية العامة أو ما يعادلها, Traffic Engineering
الخبرات
17 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 8 أشهر

Traffic Engineer/Modeler في PARSONS INTERNATIONAL LTD
  • قطر
  • أشغل هذه الوظيفة منذ أبريل 2013

Strategic Modeling using VISUM, worked on TMPQ model in Qatar for GEC projects
• Evaluation of transportation components of new and existing developments
• Carrying out traffic modeling and operational analysis works using traffic engineering software and tools.
•Evaluation of mitigation schemes/concept design using micro simulation platforms like VISSIM and operational software’s like SYNCHRO and SIDRA.
• Writing technical reports and other required project correspondences

Projects Worked:

Worked on GEC Projects DS 131, 133 132 & 11
Expressway Projects Group-9 (A-B Ring loop) & Group-2 (Al Khafji and Al Markhiya Rds), P-13 (Salwa Rd /Ramada Jucntion)
Bus Rapid Transit project on Salwa Rd.
Assessing the Temporary Traffic management scenarios using VISSIM.

DY Manager في KMC Constructions Ltd
  • الهند
  • مايو 2010 إلى مارس 2013

Preparation of Pre-feasibility studies (Traffic & Revenue Report) for BOT projects & Financial Modeling Template.
•Review / design of intersections and interchanges toll plaza layout, toll collection method and user facilities
•Preparation of BOT Status presentations, current ongoing BOT projects traffic 7 revenue trends analysis.

Projects Worked:

NH-5 (Nellore to Chilakaluripet);
NH-2 (Aurangabad -Barwa Adda
NH-111 (Bilaspur to Korba)

في Wilbur Smith Associates
  • الولايات المتحدة
  • أكتوبر 2008 إلى أكتوبر 2009

Estimating, calibrating and implementing travel demand models (highways, transit and/monorail) including TP+/Cube/Voyager, TransCAD and VISUM.
•Reviewed existing and future developments plans, socioeconomic studies and previous traffic and revenue trend reports of toll roads across the USA.
•Database management, Data Collection, compiling Highway traffic data, Qualitative, Quantitative and Statistical analysis.
•Design maps, charts, models, sketches and other graphic and visual presentations to illustrate study findings in presentation and writing.

Projects Worked:
Toll corridor analysis of Alico extension, Fort meyers, FL.
Traffic Demand and revenue forecast for Hempstead Tollway, Hempstead, TX
Toll Sensitivity analysis for GA-400, Atlanta, GA.
Traffic Impact analysis for (General Purpose lanes vs High Occupancy Toll Lanes)I-405, Seattle, WA.

Graduate Assistant Research في University of Massachusetts
  • الولايات المتحدة
  • أغسطس 2007 إلى أغسطس 2008

Conducting traffic analysis for traffic management plans including analyzing detours, workzones, establishing and analyzing available software’s summarizing benefits and costs.
•Providing quality control of traffic analysis, including demand, simulation and operations analysis for emergency evacuation plan for Amherst, MA, USA.

Assistant Transportation Planner في Span Consultants
  • الهند
  • مارس 2006 إلى يوليو 2007

Organizing Traffic Surveys (Classified Volume Count, Origin-Destination, Turning movement, Axle Load etc.)
•Assisting the Sr. Traffic Engineer in Preparing the Traffic Report.














Page 1 of 3

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Traffic Engineering
  • في University of Massachusetts
  • يناير 2008

in

الثانوية العامة أو ما يعادلها, Civil Engineering JNTU - HYD
  • يناير 2006

EDUCATION

Specialties & Skills

BENEFITS ADMINISTRATION
CONCEPT DEVELOPMENT
ENGINEERING
FEASIBILITY STUDIES
FINANCIAL MODELING
LAYOUT DESIGN
MICROSOFT WORKS
OPERATIONS ANALYSIS
SIMULATION

الهوايات

  • Tennis , Golf , Chess and Horticulture