Project Coordinator
Quality Egypt
Total years of experience :6 years, 0 Months
Project Coordinator for low current systems including Multimedia, Parking, Lighting and Lighting Control.
Commissioning, trouble shooting and maintenance of machinery vibration monitoring and protection system, Bently Nevada, which included:
• Transducer System
• Monitoring System
• Analysis and Optimization Server
• Leading and planning the instrument maintenance activities during major turnarounds in industrial plants.
• Leading the instrument team during commissioning and maintenance activities in major industrial plants.
• Verification of site installations with engineering documents. Modification of engineering documents and/or site installation as per the best practices and customer recommendations.
• Performing site acceptance test and preparation of completion certificates.
• Conducting site surveys to plan new installations, maintenance activities and upgrade projects.
• Support the sales team during budgetary proposals.
• Managing the logistics and calibration activities for all tools under Qatar and Kuwait service team.
• Preparation of site acceptance test documents
Site Engineer for Electrical Installations of Package Treatment Plant
infrastructure project:
• Study Layouts and document equipment specification
• Quantity surveying of electrical installations
• Prepare approved supplier/vendor list
• Prepare and send request for quotation
• Receive and evaluate supplier proposal
• Prepare and raise purchasing order/ contract
• Quality control of equipment material upon arrival
• Prepare Shop Drawings
• Coordinate Electricians Activity
• Supervise installation and commissioning
• Handing over completed work to supervision consultant
• Prepare completion certificate and payment request to client
• Preparation of Monthly Report
• Preparation of Technical Prequalification Documents
• Project Planning and Scheduling using Primavera
➢ Prepare Project WBS
➢ Defining Activities
➢ Establish Activities Relationships
➢ Estimate Activity Durations based on productivity norms
➢ Scheduling using CPM
➢ Resource Loading & Histograms
➢ Cash Flow
➢ Progress S-Curve
➢ Progress Monitoring and Reporting
Mica Qatar
• Implemented Primavera Enterprise System for Maersk Oil Qatar
• Implemented Primavera Project Management System
• Data migration of existing standalone, single users, to enterprise environment
• Standardization of various attributes in the enterprise environment
• Research Assistant - “Condition Monitoring of Outdoor Insulation”
• Teacher Assistant, Electromagnetics
• Lab Assistant: Electric Circuits I Lab, Electric Circuits II Lab, and Electric Machines/Power Systems Lab
• Studied Basis of design and Engineering drawings of a school
• Used lighting design software (DIALux) to design/calculate lighting levels for various projects.
• Studied fire alarm system design and created layouts for particular projects