Quality Assurance E & I
Zealcon Engineering
Total years of experience :6 years, 3 Months
Overall execution of E&I works including excavation, cable laying, JB connections, instruments installation.
\Installation and testing of instruments like LV, ESR, TT, PT, SOV etc.
Responsible to assure UEP standards and SOPs of safety.
Planning daily progress and milestones of project, meetings with clients and sharing of weekly progress reports
Overall execution of E&I works including excavation, cable laying, JB connections, instruments installation.
\Installation and testing of instruments like LV, ESR, TT, PT, SOV etc.
Responsible to assure UEP standards and SOPs of safety.
Planning daily progress and milestones of project, meetings with clients and sharing of weekly progress reports
Hyundai Nishat Motors Limited
-Design of Fire Alarm System (BOSCH)
-Site Surveys, costing and finalizing of BOQ
-Supervision of Installation of Fire Alarm Equipment,
Conduit and Cable Laying
-Design & Implementation of Access Control System
(SALTO) at Combined Military Hospital
-Supervision of Laying and design of Networking Cable and
Switches
-Supervision of ELV System Installation and b
Implementation at Ecolean Packaging Plant
-Supervision of Site Installation (Cabling & Conduiting)
-Weekly Inspection Reports and Site Surveys
-Installation of Access Control & CCTV System
-Preparation of Shop Drawings
Power Transformer Design
-Implemented the design provided by customer in power
transformer workshop
-Analyzed the end product according to the given
specifications
-Power Transformer Tests
-Preparation of Reports on site surveys and PT and CT test
ELV System at Emporium Mall
-Handle drawings and documentation work
-Inspect the site with senior engineers. Experience how
can we minimize the risk by using analytical techniques
-Preparation of reports on site surveys