حازم عبد الرازق محمد الغريب الغريب, Construction Project Director

حازم عبد الرازق محمد الغريب الغريب

Construction Project Director

Hill International

Location
Egypt
Education
Bachelor's degree, Civil Engineering
Experience
34 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :34 years, 9 Months

Construction Project Director at Hill International
  • Saudi Arabia - Medina
  • My current job since July 2021

Rua Al Madinah Infrastructure Adv - Pkg, Riyadh, KSA | Project Manager
The project site is comprised of a single land plot with an area of 1.4 km2. RAM project represents the first phase of Madinah Central Area (MCA) development. The project responds to updates related to the Prophet’s Mosque Expansion project and market studies that have been previously conducted for the Madinah Central Area.
Responsibilities/Tasks
• Developed and updated a master program incorporating consultants' design schedules and Contractors’ baseline programs
• Established and implemented appropriate project control systems related to the project's cost, time, and desired specifications
• Monitored Consultants’ and Contractors’ performance concerning mobilization, design and construction progress, methodology and systems, resource allocation, productivity, construction plant, and equipment
• Conducted reviews and made recommendations to the client on progress payment certificates and change order payments including interim and final applications
• Prepared periodical and executive project reports to the client identifying major cost and quality and progress issues

Senior Construction Project Manager at WSP
  • Saudi Arabia - Riyadh
  • November 2020 to July 2021

Al Diriyah Gate Development, Riyadh, KSA | Senior Construction Project Manager

Involved in Al Diriyah Gate, Development work has commenced on the first phase of Diriyah Gate Development Authority’s (DGDA’s)
Managing the Construction for the Major Project Al Diriyah Gate, Development work has Built Assets Lead Wadi Safar PMC, Diriyah Gate Development Authority Directly responsible for the delivery of the main project-built assets for Wadi Safar in relation to all infrastructure buildings, focused on the consultant, contractor and operator procurement and project management across all design stages. The projects include the Royal Diriyah Golf Clubhouse, Royal Diriyah equestrian and polo club, retail, mosques, clinic, civil defence, facility management buildings and animal sanctuary destinations with a total development cost of circa 3 billion SAR to be completed in 2023. Working in close collaboration with DGDA Delivery, Development and Design, I have led the generation of procurement documentation, evaluation and appointment of associated design consultants and asset operators as required. Development of required PM process and procedures for all built assets. Project Management team lead for all built assets managing the internal PMC delivery team.
Responsibilities/Tasks:
• Involved in overseeing and directing construction projects from conception to completion
• Reviewed the project in-depth to schedule deliverables and estimate costs
• Oversaw all onsite and offsite constructions to monitor compliance with building and safety regulations

Chief Operating Officer at Al Wakeel Trading & Contracting Co.
  • Qatar - Doha
  • March 2020 to October 2020

Job Responsibilities:

• Drive preparation of strategic meetings including reporting and presentation preparation (Board, Executive, Internal and External communications)
•Actively influence COO strategic priorities and execution approach
• Act as the primary day to day interface between COO Office and other Executive Office teams,
ensuring key information is shared and disseminated
• COO Function performance “scorecard” design and reporting
•Trouble shooting issues as identified by CEO
• Responsible for developing and coordinating COO Leadership team engagement and strategy days
•COO Function communications strategy, execution and monitoring
• Ensure compliance to Group policies, maintaining an available auditable trail as needed

Senior Project Manager at KBR
  • Qatar - Doha
  • November 2010 to March 2020

Managing the Sabah Al Hamad Corridor
Approximately 8 km of new dual carriageway on Abu Hamour Road/Al Muntazah Street from East Industrial Road Interchange to Al Woqod Interchange and 2 km of dual carriageway on F-Ring Road from Woqod Interchange to Al Jazeera Interchange will be constructed. The Al Muntazah mainline will comprise of eight lanes (four lanes in either direction, separated by a median) with parallel running service roads and auxiliary lanes. F-Ring Road Mainline will consist of six lanes (three lanes either direction, separated by a median) located on a 1.8km long viaduct structure above local service roads. The project will link the Industrial Area into the city, > Connect F-Ring Road to Wholesale Market Street and Mesaimeer Road, > Provide essential access for Barwa City and the Commercial Strip (8 km of retail development).There are four grade-separated interchanges included along the mainline of Al Muntazah Street and one grade-separated interchange along F-Ring Road (where it intersects with Wholesale Market Street). A directional tunnel providing access (east to south) to the proposed new Barwa Development located to the south of Al Muntazah Street will also be constructed. The project will include an extensive network of pedestrian footpaths and cycle ways to enhance safety and access for all.

Assigned as Sr. Project Manager and the Engineer for E - Ring Road
This project is located in the south of Doha and involves the upgrade of E-Ring Road, from its junction with Al Muntazah Street to its junction with Al Matar Street. Approximately 12 km of new dual carriageway will be constructed, and the existing dual carriageway will be upgraded. Three/four running lanes and a hard shoulder will be provided either side of a central median. In addition, collector/feeder/service/access roads will be designed where necessary.

Senior Project Manager at Al Fanar Construction Company
  • Saudi Arabia - Jeddah
  • August 2009 to November 2010

Project : Rehabilitation of Pipe Intake & Buildings works-Jeddah RO Phase III Project
Client : Saline Water Conversion Corporation.
Value : US$ 324, 115, 780.

Position : Senior Project Manager.

Description of works:
Rehabilitation of pipe intake & New construction of 27 Buildings (10 Concrete structures and 17 Metallic Structures) and construction of main cable route.

RESPONSIBILITIES:

The main duties of me as Senior Project Manager. include, but are not limited to:
- Coordinates work activities with Construction Manager, Infrastructure.
- Represents the company in a professional manner to the Client, Consultants, Subcontractors and the general public.
- Ensures that project remain within the established scope, budget and schedule.
- Develops, recommends and implement engineering solutions to problems met.
- Ensure Company Management System, Quality and safety system requirements are implemented.
- Provides regular reports on the physical progress and financial status of the works.
- Oversees general activities of Subcontractors to assure that compliance with engineering plans, standards, regulations, practices and procedures are being met.
- Manages the contractual aspects of project to maximize the profitability and minimize the risk for the company.
- Develops a cost-effective plan and schedule for completion of project following maximum utilization of resources.

Senior Infrastructure Project Manager at Sama-Ech LLC
  • Bahrain
  • November 2007 to August 2009

09/11/07 to Date Senior Infrastructure Project Manager In Sama-Ech (Sama-ECH is a joint venture between Sama Dubai and EC Harris)- Salam Resort & Spa-Kingdom of Bahrain.

Project : Salam Resort & Spa -Bahrain.
Client : Sama Dubai.
Value : 2.0 Billion AED.
Position : Senior Infrastructure Project Manager.
Description: The Salam Resort Bahrain shall be developed is in two phases. Phase 1 includes a 5-star deluxe resort (modeled on Dubai’s Madinat Jumeirah - Mina Al Salam), a conference center (proposed to host the GCC summit at end of 2010) and 6 Royal villas (developed on reclaimed land, which will house the heads of state of the GCC during the summit). Phase II will be residential, with 200 Premium villas located on the existing land area, and 153 Signature villas on reclaimed land.
The Salam Resort Bahrain-Phase II will continue to serve as a landmark development and one of the first manifestations of Sama Dubai’s resort brand. The Phase II will benefit from the diplomatic importance as the venue for the 2010 GCC Summit to be hosted by the Kingdom of Bahrain. The summit will be the resort’s inaugural event and will thereafter anchor the future hospitality and leisure resort communities in southwest Bahrain. Total site Area is of approx. 711, 500 sqm.

Senior Resident Engineer at Parsons Services ltd-Doha-Qatar
  • Bahrain - Manama
  • June 2005 to November 2007

Project : Bahrain City Center Interchange-Manama
Client : Minstery of Work.
Value : 4, 926, 292.90 BD.
Position : Senior Resident Engineer(Bridge/Roads) for Bahrain City Centre Interchange: A US $13, 000, 000 project where the scope of works includes the construction of a flyover and new roads in the Seef district. The flyover is curved, 5-span continuous, 195m total length x 12.1m width on a post-tensioned cast-in-place double cell box-girder with non-integral piers and abutments

Site Agent - Roads and Infrastructure at In Consolidated Contractors Company –Oman (C.C.C) – Project Department.
  • Oman - Muscat
  • May 2003 to May 2005

Project : Design and Construction of Internal Roads at Sharhia & Dakhilia Regions
Client : Ministry of Municipalities-Sultane of Oman.
Value : 15, 000, 000.00 O.R
Position : Project Manager.
Description: 405 KM of Single Carraige way with 3 Roundabout.
Duration : 18 Months from 13/04/2003 to 12/10/2004.
Duties : Managing the Design stage uptill approval from the Client and managing the construction Stage plus the Varation orders including the preparing of Shop Drawings and the quantity Survey, the time sechdules, the Claims and the applying the Standard Specifications with high quality following AASHTO.



Project Construction of Al Gazza - Sinaw Road
Client : Ministry of Transportation- Directorate General of Roads -Sultane of Oman.
Value : 3, 650, 000.00 O.R
Position : Project Manager.
Description: 75 KM of Single Carraige way with 2 interchanges.
Duration : 15 Months from 01/06/2004 to 12/09/2005.
Duties : Managing construction Stage including the preparing of Shop Drawings and the quantity Survey, the time sechdules, the Claims and applying the Standard Specifications with high quality following AASHTO.

Project Construction of Draiange Structure for Blad Al-Shoum -IBRI Region.
Client : Ministry of Transportation- Directorate General of Roads -Sultane of Oman.
Value : 26, 135, 000.00 O.R
Position : Construction Manager.
Description: 15 Irish crossing of lengths vary from 500 - 4000 m for big wadis and 6 Irish bridges of 24 cells (2*1.5).
Duration : 6 Months from 26/09/2005 to 29/03/2006.
Duties : Responsible of 6 Irish Crossings and 2 Irish Bridges, reporting to the Project Mnagers, Managing construction Stage including the preparing of Shop Drawings and the quantity Survey, the time sechdules, the Claims and applying the Standard Specifications with high quality following AASHTO.

Deputy Project manager at Abdulrahman Al-Naim Cons. (Consulting Office – Kingdom of Saudi Arabian)
  • Saudi Arabia
  • May 2002 to May 2003

Project Supervision of Taj El Fadaly Highway -Eatern Region.
Client : Ministry of Transportation- Kingdom of Saudi Arabia.
Value : 70, 320, 150 S.R
Position : Resident Engineer.
Description: Dual carriageway of 70 Km with one Flight over.
Duration : 12 Months from 12/04/2002 to 02/04/2003.
Duties : Supervision of the Construction by applying the standard specfication to satsify the required Quality and preparing the monthly reports indicating the lookahead progress, the monthly progress status, the monthly invoices, the approval of submittals, applying the quality control and required tests and reply for the correspondaces besides studing the submitted Claims .

Site manager of road & infrastructure at EGYDAN (Egyptian-Danish project management company).
  • Egypt
  • August 1999 to April 2002

Project Supervision of the roads & Infrastructure utilities at Dreamland city-6th., October city.
Client : Bahgat Group- Dreamland city-Egypt.
Value : 89, 320, 150 L.E
Position : Site Manger at Egydan (the project management of Dreamland).
Description: Internal roads and Infrastructure networks at Dreamland city.
Duration : 30 Months from 25/08/1999 to 01/04/2002.
Duties : Checking of the levels and co-ordinates of the roads for the Villa apartment project at Dreamland City, Inspection of Sewage - Water - Irrigation - Natural Gas & Electrical networks, Reviewing the construction drawings for the roads & Infrastructure utilities, Approving the submitted time schedule for the Project activities from the contractors.Preparing weekly & Monthly Project monitoring reports.

Site manager of road department at Arabian company for projects and urban developing in El Rehab Project .
  • Egypt
  • April 1998 to August 1999

Project Supervision of the roads & Infrastructure utilities at El Rehab city-New Cairo.
Client : Arabian company for projects and urban developing Realestate-New Cairo-Egypt.
Value : 125, 897, 260 L.E
Position : Site Manger (the Cilent's Representative).
Description: Internal roads and Infrastructure networks at El Rehab city.
Duration : 30 Months from 30/04/1998 to 01/08/1999.
Duties : Checking of the levels and co-ordinates of the roads for the Second phase at El Rehab City, the construction drawings for the roads, Approving the submitted time schedule for the Project activities from the contractors, Preparing weekly & Monthly Project monitoring reports and approval of submitted Invoices.

Road Engineer propmted to Site Manager at BinLadin International-EGYPT
  • Egypt
  • May 1996 to April 1998

Project: Dualization of the Coastal Safaga-Hurgada Highway -New Cairo.
Client : Egyptian highway & Bridges Authority -Ministery of Transportation -Egypt.
Value : 36, 897, 260 L.E
Position : Site Engineer prompted to Site Manger (the Contractor's Representative).
Description: Dulaziation of the Coastal Safagaa- Hargada road of 250 KM.
Duration : 30 Months from 25/05/1996 to 17/04/1998.
Duties :Responsible for the construction activities besides providing technical support to the technical office in the preparing of Shop Drawings and the quantity Survey.

Technical office Engineer at Adham Consulting Office- Kingdom of Saudi Arabian
  • Saudi Arabia - Jeddah
  • May 1995 to May 1996

Project: Jeddah-Hadn - Tarrabah Highway - Western Region-Kingdom of Saudi Arabian.
Client : Ministery of Transportation - Kingdom of Saudi Arabian.
Value : 15, 146, 000 S.R
Position : Technical Office Engineer (the Design consultant).
Description: Urban Single carriageway Highway of 125 KM.
Duration : 12 Months from 26/05/1995 to 10/05/1996.
Duties : Design of Road Jeddah - Hadn -Tarrabah, Prepare the B.O.Q & Specifications for the Project, Reviewing the design drawings for the Project with the Ministry, Prepare the Soil Reports & Surveying works documents for the Project

Road Design engineer at industrial and Mining complexes- Ministry of Industry.
  • Egypt - Cairo
  • July 1992 to May 1995

Project: Industrial Zones and complexes, Safaga & El Dekhila ports - Egypt.
Client : Ministery of Industry - Egypt.
Value : 6, 500, 000 L.E (Design Fees).
Position : Design Engineer (the client 's repesantative).
Description: Design of safaga- El kosiur Highway - one of the Egyptian Road Network, Design of the Road Network for Industrial Zone at 6th October city, Design of roads for 12 industrial complexes, roads for Safaga & El Dekhila ports.
Duration : 12 Months from 26/05/1995 to 10/05/1996.
Duties : Design of the above mentioned projects beside preparing the B.O.Q, Tenders and the Contract documents.

Road Site Engineer at General Nile Company for Paving & construction
  • Egypt - Cairo
  • August 1989 to July 1992

Project: Dulazation of 70 km of Rural Cairo-Alex. Highway-Egypt.
Client : Egyptian highway & Bridges Authority -Ministery of Transportation -Egypt.
Value : 76, 326, 450 L.E.
Position : Site Engineer (The Contractor's repesantative).
Description : Paving of 70 Km. of rural Cairo -Alex. Highway- one of the Egyptian Road Network. .
Duration : 6 Months from 26/08/1989 to 10/02/1990.
Duties : Site Engineer for paving the above mentioned road.

Project: Internal roads at El Orman & 6 th October Panorama gardens -Egypt.
Client : Ministery of Agriculture -Egypt.
Value : 265, 450 L.E.
Position : Site Engineer (The Contractor's repesantative).
Description : Paving of Internal roads for El Orman & 6 th October Panorama gardens.
Duration : 8 Months from 01/03/1990 to 10/01/1991.
Duties : Site Engineer for paving the above mentioned road.

Project: El Dekhila Railway embankment -Egypt.
Client : : Egyptian Railway Authority- Ministery of Transportation -Egypt.
Value : 24, 350, 100 L.E.
Position : Site Engineer (The Contractor's repesantative).
Description : Constructing the Dekhila Railway embankment of 45 KM.
Duration : 9 Months from 12/10/1991 to 01/07/1992.
Duties : Site Engineer for the above mentioned road.

Education

Bachelor's degree, Civil Engineering
  • at Cairo University
  • May 1989

Education & Qualification : - • B.Sc. in civil Engineering Cairo University with grade ‘ Good’ 1989, and Project “ Highway & Airport Eng.” with rate V.Good “ • Design of Highway course at highway & Bridges Authority with rate “Excellent” • Higher study Diploma in “ Soil Mechanics & Design of foundation “Cairo Uni. with rate “ Good” – May 1994 . • Computer Courses ( Autocad R 12 – Advanced Autocad R 12) at Cairo University with rate “ Excellent .

Specialties & Skills

Transportation
Mechanics
Primavera
• Good capability of Microsoft Office 2000 – AutoCAD R14- Primavera P3 - Softdesk.
MS Office

Languages

English
Expert
Arabic
Expert

Hobbies

  • Swimming
    I have got Bronze midal in Eggpt cup competition 1987