BIM Lead
Zuhair Fayez Partnership Consultants
Total years of experience :13 years, 0 Months
• Creating and managing BIM execution plans for projects
• Developing BIM implementation strategies aligned with the Owner (SODIC) overall goals
• Ensuring compliance with industry standards and regulations related to BIM
• Leading and managing the BIM consultant, owner and contractor teams, providing guidance and support
• Collaborating with other project stakeholders to integrate BIM process into overall project workflow
• Establishing and enforce BIM standards and protocols
• Ensuring consistent application of BIM processes across projects
• Updating standards based on industry developments and project requirements
• Overseeing the quality and accuracy of BIM models and data
• Conducting regular reviews to ensure compliance with project requirements
• Facilitating interdisciplinary collaboration among different project teams
• Fostering communication and information exchange among stakeholders
• Collaborating with design and construction teams to resolve issues and discrepancies
• Participating in coordination meetings and update the BIM model based on project changes
• Working closely with project managers, architects, engineers, and other stakeholders to ensure BIM processes align with project goals
• Generating sheets, view schedules, and reports
• Studying and preparing requests for information (RFI) for all missing, unclear, conflicting or other technical matters that may arise during construction
• Reviewing RFC's "Request for Change" from consultant to submit project changes and variations
• Coordinating with other trades to solve any conflict between (arch, civil, mech, elect, plum)
• Upgrading REVIT Design Model to the required level of detail
• Collaborating and coordinating with other disciplines design changes
• Preparing Bill of Quantities "BOQ" for every item in the whole project
• Attending coordination meetings with contractor, consultant and project management
• Reviewing subcontractors’ shop drawings as well as outsourced shop drawings and coordinate their approval process with the project consultant
• Participating in solving/reporting any unexpected technical difficulties, and other problems that may arise during construction to the Technical Office Manager for discussion and proper solve
• Preparing material submittal in conjunction with material to be and approved by the Consultant
• Preparing as-built drawings at the end of the project and hand over to the project consultant
• Assisting team members through the use of 3D software and processes
• Participating in Design Review and Clash Resolution meetings
• Reporting directly to the PM and able to represent the PM at high profile meetings
• Determined all discrepancies and problems that arose in rapidly changing digital coordination environment by performing clash detection studies and generating reports for project team
• Developed concepts and sketches into accurate models and drawings, through direct communications
• Exported 2D and 3D geometry from architectural and structural design models
• Reviewed and confirmed that subcontractors’ construction models are clean, accurate and complete
• Reviewed all incoming and outgoing models and drawing information
• Worked to ensure overall designs fit together and satisfy each disciplines' individual requirements
• Collaborated with others (engineers, technicians and external parties) while leading BIM production
• Assisted Seniors, Team Leaders and Project Manager with cost control and estimated bidding processes
• Engaged in office development or client BIM procedures and facilitated their implementation into projects
• Creating architectural drawings and designs including plans, elevations and sections for residential structures
• Producing detailed three dimensions (3D) Visualizations and presentations using Revit/CAD and SketchUp
• Controlling projects from initial to final level in a short time by following up with all disciplines
• Participating in various administrative buildings, different police stations and security sectors and completed the first project with BIM method by using Revit in the company
• Attended progress and technical meetings, suggestion and discussion of technical proposals
• Developed several types of projects from conceptual stages to final design stage
• Lead various and diverse types of designs including architectural, interior designs, and landscape
• Participated in various projects of the Egyptian Armed Forces at the Military Works Weaponry
• Engaged in early days as volunteer urban designer in many social development projects
• Participated in conceptual studies of urban development of some random locations as Manshiet Nasser
• Worked on Egypt 712 National Vision of Republic of Egypt
• Trained as site engineer in Under Construction Project
• Learned how to create and maintain construction work in civil structure field