OFFSHORE STRUCTURAL DESIGNER
ATKINS
Total years of experience :10 years, 0 Months
FEED Services of Umm Shaif Long Term Development Plan - Phase 1 (US LTDP-1)
Client: ADNOC Offshore
Prime responsibilities
3D Modeling in PDMS and Drawing preparations in PDMS Draft
Attending Model Review meeting with Clients
Preparation of Structural drawings
Preparation of Bridge & Bridge Support Structure drawings
Structural Material Take-Off (MTO)
3D Modeling of various offshore structures in PDMS (RP1- Riser Platform, WHT-HP1 &
HP3 Well Head Towers, US19B -Satellite Platform)
Existing platform Modification Drawings and PDMS Modeling (CSP1, WIP2, WIP5)
Umm Al Dalkh Early Production Combined Concept and FEED Project (UAD)
Client: ADNOC Offshore
Prime responsibilities
Preparation of Structural Standard drawings
Preparation of Structural drawings for Existing platform New extensions (WHP-15, WHP-
16, CSP-1)
Structural Material Take-Off (MTO)
Provision of RTUs on 10 Nos. of Wellhead Towers in Zakum Field (CAE - Control &
Applications Emirates)
Client: ADNOC Offshore
Prime responsibilities
Preparation of GA Layout for New Solar Panel deck Extension
Preparation of Structural drawings for New Solar Panel deck Extension
Preparation of Plating / Grating and Handrail Drawings for New Solar Panel deck Extension
Equipment mounting details, Lifting GA & Padeye Deatils
Structural Material Take-Off (MTO)
Integrity Management of and Structural assessment of Barge type Structures in Zakum &
Umm Shaif Field (8 Platforms)
Client: ADNOC Offshore
Prime responsibilities
Attending Meeting with Clients modeling related issues.
Preparation of GA Layout for Mitigation support structure
Preparation of Structural Demolition drawings
3D Modeling of Mitigation support Structures in PDMS (8 Platforms)
Structural Material Take-Off (MTO)
Provision of Design drafting services for the update of USGIF, WHT US-215 & ZKGPF
Engineering Deliverables (AS-Built Project)
Client: ADNOC Offshore
Prime responsibilities
Validation of As-Built Drawings with Current E3D Model (Company Model) and Site
Laser scanned 3D Model (LFM)(Cloud Data Model)
Drawing Validation of Flare Tower - 4, 5 & 6 (FT4, FT5 & FT6) USGIF Area
Model Updation of Flare Tower - 4, 5 & 6 in E3D (FT4, FT5 & FT6) USGIF Area
Bridge support tower structures Drawing Validation (S55 & S56)
Designation: Modeler and Structural Designer
KNPC 93-B-01 - OPERATING FACILITY BUILDING MODULE
Owner: KNPC/KIPIC
Prime responsibilities
• Full Building Module 3D Modeling in BOCAD Version 3.1
• All Connection Details, Structural Primary Drawings, Secondary Drawings, Joint Details, Outfitting Drawings in Bocad.
• Equipment Mounting Detailed Drawing and MTO for various Modules.
• Module’s Padeye Details and Lifting Configuration drawings.
Designation: Modeler and Structural Designer
SFNY HEADER # 9 AND ASSOCIATED FACILITIES - BI-10-00799
Project consists of work scope associated with five fields in Saudi Arabia, namely, SAFANIYA, BERRI, MARJAN, ZULUF & HASBAH.
Owner: SAUDI ARAMCO
Prime responsibilities
• 3D Modeling in PDMS (S222, S18, S23 (Jacket and Topsides))
• All Connection Details, Structural Primary Drawings, Secondary Drawings, Joint Details, Outfitting Drawings in Microstation.
• Equipment Mounting Detailed Drawing and MTO for various Modules
• Module’s Padeye Details and Lifting Configuration drawings
Designation: Modeler and Structural Designer
HASBAH SAUDI ARAMCO
Owner: SAUDI ARAMCO
Prime responsibilities
• 3D Modeling in TEKLA (Jacket and Topsides)
• All Connection Details, Structural Primary Drawings, Secondary Drawings, Joint Details, Outfitting Drawings in Microstation.
• Equipment Mounting Detailed Drawing and MTO for various Modules
• Module’s Padeye Details and Lifting Configuration drawings
T E N FPSO
Client: MODEC
Prime responsibilities
• 3D Modeling in PDMS (FPSO Topsides)
• Module 3D Modeling in PDMS with all Connection Details, Extracting Structural Primary Drawings, Secondary Drawings, Joint Details, Outfitting Drawings and MTO.
• Equipment Mounting Detailed Drawing and MTO for various Modules
• Module’s Padeye Details and Lifting Configuration drawings
YETAGUN PHASE V DEVELOPMENT PROJECT
Owner: PETRONAS CARIGALI MALAYSIA LTD.
Prime responsibilities
• 3D Modeling in BOCAD (Jacket and Topsides)
• Jacket and jacket 3D Modeling in BOCAD with all Connection Details, Extracting Structural Primary Drawings, Secondary Drawings, Joint Details, Outfitting Drawings and MTO.
VASAI EAST DEVELOPMENT PROJECT
Owner: ONGC INDIA.
Prime responsibilities
• 3D Modeling in BOCAD (Jacket and Topsides)
• Jacket and jacket topside 3D Modeling in BOCAD with all Connection Details, Extracting Structural Primary Drawings, Secondary Drawings, Joint Details, Outfitting Drawings and MTO.
• Equipment Mounting Detailed Drawing and MTO for various Modules
• Module’s Padeye Details and Lifting Configuration drawings
• Seafastening Modeling in BOCAD
MV 29 FPSO
Client: MODEC
Prime responsibilities
• 3D Modeling in PDMS (FPSO Topsides)
• Module 3D Modeling in PDMS with all Connection Details, Extracting Structural Primary Drawings, Secondary Drawings, Joint Details, Outfitting Drawings and MTO.
• Equipment Mounting Detailed Drawing and MTO for various Modules
• Module’s Padeye Details and Lifting Configuration drawings
Designation: BOCAD 3D Modeler and Structural Designer
ONGC CLUSTER 7 (C7 FPSO) PROJECT
Owner: ONGC INDIA, Contractor: Bumiarmada
Prime responsibilities
• M30 (Compressor module) 3D Modeling in BOCAD with all Connection Details, Extracting Structural Primary Drawings, Secondary Drawings, Joint Details, Outfitting Drawings and MTO.
REFURBISHMENT OF ABAN -III
Owner: ABAN Offshore
Prime responsibilities
• Shale shakers House Structural Drawings and Joint details
• Preparation of weight control report.
• Engine foundation Structural Drawings
ONGC D1 FIELD PROJECT D1 FPSO
Owner: ONGC INDIA, Contractor: Bumiarmada
Prime responsibilities
• Module 3D Modeling in BOCAD with all Connection Details, Extracting Structural Primary Drawings, Secondary Drawings, Joint Details, Outfitting Drawings and MTO.
• Equipment Mounting Detailed Drawing and MTO for various Modules
• Module’s Padeye Details and Lifting Configuration drawings
BALNAVES FIELD PROJECT, AUSTRALIA APACHE FPSO
Owner: Apache Australia, Contractor: Bumiarmada
Prime responsibilities
• SKIDS 3D Modeling in BOCAD with all Connection Details, Extracting Structural Primary Drawings, Secondary Drawings, Joint Details, Outfitting Drawings and MTO.
• Equipment Mounting Detailed Drawing and MTO for various Skids
• Skid’s Padeye Details and Lifting Configuration drawings
COBALT CAMEIA FPSO
Owner: Cobalt Energy Limited, USA; Contractor: Bumi Armada Berhad, Malaysia
Prime responsibilities
• FEED of FPSO for Cameia field in Angola, Africa.
• Flare Tower 3D modeling in BOCAD
• M70 Power Generation Module 3D modeling
• All module Weight estimation
Designation: Structural Designer
MOORING ARRANGEMENT FOR FLOATOVER ADMA AND ARAMCO
• Mooring General Arrangement Layout Drawings
GLOBAL PETROTECH CANTILEVER EXTENSION
• Rig General Arrangement Drawings, Cantilever Structural Drawings and MTO
FLATTOP BARGE CONVERSION TO SEMI-SUBMERSIBLE BARGE- NAVISPEC MARINE SERVICES
• Barge General Arrangement, Tank Capacity and Structural Drawings
• Barge Stabilizing Column Drawings and MTO
DRY DOCK WORLD SINGAPORE - STRUCTURAL CHECKS IN ACCOMMODATION MODULE LIFTING
• Lifting General Arrangement Drawings
TL OFFSHORE - INSTALLATIONS
• Jackets Structural, Jacket Pile Driving Drawings and MTO(MNP, MLQ, MNF1, MNF2)
AD20 HELIDECK DESIGN
• Helideck Structural, Stair Drawings & MTO
ORIENTAL RIG MOM PREPARATIONS
• Jackup Rig General Arrangement Drawings & Jackup Rig Structural Drawings
LAUNCH BARGE DESIGN FOR TL OFFSHORE
• Barge General Arrangement Drawings, Barge Structural Drawings & MTO
• Tank plan & Tank Capacity Calculation
• AFT Construction Drawings & FORWARD Construction Drawings
• Skid Beam Structural Drawings & MTO
• Rocker Arm Structural Drawing & MTO
LOADOUT & LOADOFF OF SPUDCANS WITH BARGE SASCHA
• Loadout & Loadoff Stages Drawings, Module Seafastening Drawing
• Structural framing plan, Tank plan etc...
FORESIGHT DRILLER VII MOM (MARINE OPERATION MANUAL)
• Jackup Rig General Arrangement Drawings & Jackup Rig Structural Drawings (list of Drawings)
• List of Figure in the MOM, Wind Area Calculations & Drawings
LAMPREL SEAFASTENING DESIGN FOR MODULE 12, 13, 31 ON BARGE ALE 250, BARGE MYCLIN 3516
• Framing plan, Module layout and Module with COG Drawing
• Module Seafastening & Stanchion Drawing, MTO & Fabrication Drawing
GLOBAL PETROTECH RIG GLOBAL PEARL SPUDTANK AND LEG DESIGN
• Spudcan Structural Drawing & MTO, Leg Structural Drawing & MTO
LIFT BOAT DESIGN (AQUA JACK III)
• Hull, Accommodation, Spudcan Structural Drawings & MTO
ACCOMMODATION STRUCTURAL (CONTAINER)
• Accommodation Structural Drawings & MTO, Lifting Schematic Drawing