GUNDABOINA RAVI GUNDABOINA, QA

GUNDABOINA RAVI GUNDABOINA

QA

ITP

Location
Qatar
Education
Higher diploma, civil
Experience
30 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :30 years, 9 Months

QA at ITP
  • Qatar
  • My current job since February 2012

Earth work levels, coordinates survey reports inspection, Steel reinforcement, Shuttering, Structural works and Pipelines including A/G and B/G inspection including HDPE/GRE/GRP/CS lines. Electrical sub stations, new control room building architecture works including all finishing works inspection.
Provides Leadership to the quality control team and ensures noncompliance to quality norms On construction sites with respect to civil, mechanical, instrumentation, electrical disciplines. Also supports quality control at vendors/suppliers during procurement activities.
Overall Responsibilities:
Supervision, monitoring and inspection of total construction activities carried out by contractor, on site on behalf of employer in accordance with project specification &

CONCRETE QUALITY CONTROL COORDINATOR at JGC CORPORATION
  • Qatar
  • February 2012 to July 2015

CONCRETE AND CEMENTITIOUS EPOXY GROUT QUALITY CONTROL CO ORDINATOR

GRE PIPING INSPECTOR at Approved by PDO – Special Technical Services (STS) LLC
  • United Arab Emirates
  • June 2011 to January 2012

HERE I WORKED AS A GRE PIPING INSPECTOR WITH VELOSI

Senior Quality Control Inspector at VELOSI: Oil and Gas / Energy industry
  • United Arab Emirates
  • April 2011 to December 2011

Reason for leaving: Project completed.

Company Profile: The Velosi Group, founded in 1982, provides quality assurance and quality control services to a number of leading national and multinational oil and gas companies, including BP, Shell, ExxonMobil and Chevron. The Velosi Group operates globally through four principal offices in the USA, the UK, Malaysia and the UAE and has operational or representative offices in a further 27 countries worldwide.

Main activities and responsibilities;
Sahil and Shah full fields Development Project - Shah (ADCO -client)
Quality inspection for CDS/RDS1/RDS2 civil works, control building works and elevated concrete structures and foundations for equipment and pipe racks and steel structures works and Gas compressor, Air compressor shelter, pre casting foundations rigid bays new Substation infrastructure works, storage and fire water tank foundations, retaining wall/dike Wall, U/G and A/G pipe line works and GRE/GRP pipe line works like (PWL/Produced Drain /AOC) lines.
Sound civil inspection and soil FDT test, concrete placement and curing Methods review of Ready mix concrete design and batch certificates, witness concrete pouring as per ADCO Specifications, Provide the recommendations for changes and /or improvements in Written Procedures and work documents related to his engineering function and promote degree of Quality work efficiency, review/comment QC record and its index submitted by the Contractor. Able to lead /or train project teams, performs difficult technical support Assignments, requiring the application of advanced techniques, in accordance with Established standards and procedures, familiar to BS/ACI/ASTM standards.

Senior Quality Control Inspector at Punjlloyd Ltd
  • United Arab Emirates
  • October 2009 to March 2011

Due to Libya Crises Left this Job) 1 year 6 months.

Company Profile; A leader in the field of composites in Libya and Europe including BP, Shell, ExxonMobil and Chevron. The OPS Group operates globally through four principal Offices in the USA, the UK, Germany and the Libya and has operational or representative Offices in a further 30 countries worldwide.

Project Details; Libyan Housing Board Infrastructure Project 10600 units Apartments construction, U/G and A/G drainage GRE pipeline works high raised Buildings construction, total concrete strcture building construction including all Finished works, Ready mix batch plant concrete designing and laboratory tests Conducting as for client approved quality plan, Asphalt roads construction and Sewage treatment plant construction and GRE/HDPE pipelines for drinking water And sewage water and installing the manholes and construction of utility and office Building works.

Responsibilities; Inspection of tools/equipment calibration records shall be maintained and available examination, make sure that all activities are carried out as per engineering standard specification approved QCP / ITP, ensure quality program
Procedures and documentation in all item of civil works, review all detailed drawing applicable or materials specifications, procedures and hydro testing requirements, specification and inspection prior to execution and final acceptance. Carry out inspection of all facilities within the area of responsibilities and rectify deficiencies.
Monitor activities consist of surveillance, witness, data* review, or hold point as specified inspection test plan. Verify worksheet closure in the field and update the tracking, test pack closing and hard over to certification department.

CIVIL LABORATORY MANAGER at OPS international Ltd Company
  • Libya - Tripoli
  • September 2009 to November 2010

READY MIX PLANT LABORATORY MANAGER

Senior Quality Control Inspector at Velosi Certifications Services LLC
  • to January 2010
Construction Engineer at Head office
  • Egypt
  • September 2008 to September 2009

The Punjlloyd Group is Indian based company now this company is working in middle east and Africa and Russia and Asia total 20 countries Punjlloyd work is going on now this company is the leader in storage tanks and flow line jobs.

Senior Quality Control Inspector at PUNJLLOYD LTD
  • Qatar - Doha
  • June 2008 to May 2009

NEW DOHA INTERNATIONAL AIRPORT WORKS

AS A QUALITY CONTROL INSPECTOR BUILDING WORKS ROADS AND SEWAGE PIPING GRE PIPING WORKS

Civil Engineer at Special Technical Services LLC (STS)
  • October 2006 to August 2008

it is a big EMC and ESC contract company in Sultanate of Oman and Petroleum Development of Oman (PDO) areas. And
Now it is entered in Abudhabhi and Qatar and Bahrain, this company is specialists in pipeline projects and storage tanks construction and shutdown jobs.
Project Details;
Engineering and Maintenance Contract (EMC) -C31/0605 * Engineering and Procurement Contract (EPC) -Gas Compressor Unit projects in-Oil and Gas area in Petroleum Development of Oman -Lekhwair area -Oman Gas Compressor Unit (150 million project) inside the lekhwair production stn. Air Compressor Unit project and GRE firefighting pipe line works inside the stations. 300 mm Carbon Steel pipe line works U/G Lekhwair area to Dhulia station -45km Water injection projects including earth works and foundations casting and place Inside stations all repair works and shutdown based jobs maintenance contract on- shore works in lekhwair area.
GRE pipe line works 300mm dia inside the Lekhwair Production Station(LPS) - Fire water line Adhesive and Lamination and Flange jointing works. Works involved Trench excavation as per IFC drawing and FDT test and pre padding/post padding with dume sand and hydro testing and commissioning works.
Responsibilities:
Co-coordinating and supervising civil works including new stations and control room -Building works Rig drilling purpose rig locations preparation earth works and sign-boards erection in sub roads and main roads as per the PDO specifications. Attending the client daily / weekly meetings and discussing about progress. Co-coordinating with project leader and subcontractors about progress and quality issues and making the new work estimations and getting job orders from clients Construction Rig locations and cellar constructions and Rig camp sites const- ructions including soak pits and drainage works and manholes including all maintenance works in off plot area, and supervisor and quality checking as per drawings.
GRE pipeline works trench inspection and Cement and Lamination joints inspection and records maintaining, pre / post padding and trench acceptance reports making and hydro test / jointing time witness, test packs preparation and submitting to the client and Tie in points, commission works.
Statistically techniques to ensure PDO specifications and procedures. new primary and temporary roads constructions in Oil and Gas areas Lekhwair area production station area station-01/ station-02 two Remote - manifold stations construction including manifold stations.
Statistically techniques to ensure PDO specifications and procedures. new primary and temporary roads constructions in Oil and Gas areas Lekhwair area production station area station-01/ station-02 two Remote - manifold stations construction including mini manifold water injection erections

Quality Assurance at RAO & RAO Constructions Ltd
  • India
  • March 2004 to September 2006

Galfar Engineering and Contracting company is well knowned company in Oman it is a major construction company in Oman now a days this company is enter in Qatar and Abudhabhi and Bahrain middle east totally covered, this company is specialist for Asphalt roads and building constructions and Oil and Gas area EPC and EMC contracting Company
Project Brief;
Off Plot Delivery Petroleum Development Contract, C31/0603, - Fahud area * Engineering Service Contract, C2K / 8002, Fahud /Lekhwair O&G area * Client : Petroleum Development of Oman -PDO. In side stations maintenance works and new Carbon Steel flow lines construction. Construction of Rig locations and Cellars constructions -installing the Stove and Kelley and mouse hole pipes for rig drilling purpose. Inside lekhwair production Station water injection manifold works includes sunshade structural works and 48" CS pipe line works including trench excavation and foundations casting and erection and sand padding -35 km, 12" pipe line works in side Dhulia production station. Dyke wall Construction works around the store- ge tanks, new fencing works around the station. And Station extension works. New valve pits construction and new roads construction in side the station.
Inside the station GRE pipeline shut down works and maitainence works, and old spools Replacement and Remote Manifold Station inside fire water GRE lines installation 300mm Dia cement and lamination joints
Main activities and responsibilities:
Co coordinating and Supervising Civil Works including Production station works and New control room building works constructions, U/G electrical cable lines laying work On shore related works and inside the stations Surfer ox plant/Glycol plants civil work Inside the production station fire water system up grading: Fuel storage tank found- action works. Including earth work excavation and Reinforcement bar bending schedule-le preparation works. Inside the stations GRE pipe new crude oil lines lying. Dhulia production station area 12@ CS gas new pipe line laying works. Rig location/ earth works excavation and leveling, grading works. Rig cellar earth works and concrete/ reinforcement works as per the Rig design. New Remote Manifold Station civil works foundations pre casting and laying works. As per the PDO approved drawings pre casting foundations casting in yard. Inside stations maintenance works as per the instructions PDO supervisor Structural works including sunshades and pipe supports, cross over’s fabrication- and erection at site and after mechanical alignment grouting works. Oil and Gas area Off plot related works construction and maintenance works.

at Rao &Rao construction
  • February 2002 to February 2004

is Indian based company, this company will do up to 5 million dollars works only, specialists for earth work excavations and mining works and rock blasting works and random rubble masonry and compound wall works and building constructions and maintainence works.
Project Profile;
Indian Business School (ISB) - Gachibowli - Hyderabad
Tata Consultancy Services Building - Hi-tech City Earth works / Rock excavation and 9 Km Random Rubble Masonry compound walls Wall construction in ISB and Inside the Indian Business Building all types of Maitainence civil works, plumbing, flooring, HVAC etc.
Responsibilities;
Inspection of all civil works as per the BS code standards and maintaining the record Conducting the quality/safety related meetings with sub-contractors. Inspection of ISB compound wall Random Rubble Masonry works and 15 km length. Inspection of repairing and maintenance works in side ISB building. Inspection of the materials and checking materials as per ASTM standards. Association with tendering, negotiating, budgeting and planning for the new projects Civil building and maintenance works and bituminous small road works construction. High raised building false ceiling works maintenance and repair works. Mosaic and granolithic, granite, plumbing repair and maintenance works inspection new volley ball and tennis court construction works.

Civil Engineer at Nagarjuna Construction Company (NCC) Ltd
  • June 1999 to January 2002

Employees 10000 to 14000
VELO; Civil Engineering Construction.
Company Profile; Nagarjuna Construction Company is India based company well knowned in India now this company os entered in middle east also specialists for Ashphalt Road construction and Bridge / High raised building construction company.

Quality control inspector at B.G Shirke Construction Technology Ltd
  • United Arab Emirates
  • August 1993 to May 1999

activities and responsibilities:
Supervising and inspection of all earth work excavations and lineout marking and Ground levels checking and preparing and setting the leveling points. 12 km R.R masonry compound wall works construction and preparing the sub-contractor bills and verifying the work related quality issues. Athletic stadium earth work excavation works line out marking and excavating the -structural foundations and
footing earth works as per the client approved drawings. Major athletic stadium concrete structure Bar bending schedules preparation and taking the clients approvals. Stadium office buildings and shops buildings construction works including flooring - works and plumbing works and walls ceramic and glazed tiles and block work - masonry and plastering works and granite flooring works and painting works etc Inside the stadium finishing works and horticultural works supervision. Car parking area earth works and excavation, kerb stones fixing and interlocking tiles -fixing works supervision and inspection working as a team.

CONSTRUCTION JUNIOR ENGINEER - CIVIL at shop and Broiler rooms constructions - Strides Archolab Limited -
  • India - Bengaluru
  • September 1993 to March 1999

COMPANY NAME BG SHIRKE CONSTRUCTION PRIVATE LIMITED - PUNE BASED COMPANY

quality Inspector at Future Pipe Industries
  • United Arab Emirates
  • January 2011 to

Field Jointing: Adhesive Bonded (TB/TS), Straight Field Lamination Flange joints, Diameter:25mm to 600mm-up to 67 bar GRE pipes and Fittings, according to Annex D of ISO 14692-4 and FPI Training Procedure FPI/SS/JQT/TRAD/001 Qualified by Bureau Verities - Project : Sahil and Shah FFD Project -Abudhabhi Date of Training -FPI - Abudhabhi Factory, Certificate valid up to Sep-2013

QC inspector at shah & sahil
  • United Arab Emirates
  • to
Construction Engineer at Galfar Engineering Construction Company (SAOG) PDO approved
  • United Arab Emirates
  • to
Quality control inspector at Rao and Rao Constructions
  • India
  • to
Civil Engineer at Nagarjuna Construction Company Ltd. (NCC)
  • United Arab Emirates
  • to
Quality control inspector at B G shirks Construction Technology Ltd
  • United Arab Emirates
  • to
Control Coordinator
  • Qatar
  • to

JGC Corporation - Barzan Gas (10.4billion dollars) Project: Raslaffan Industrial city - new LNG plant construction

Education

Higher diploma, civil
  • at State Board of TechnicalGovernment Polytechnic
  • July 1993

GOVERNMENT POLYTECHNIC MAHABOOBNAGAR 3 YEARS REGULAR DIPLOMA CIVIL ENGINEERING

Specialties & Skills

International Standards
Quality
QUALITY CONTROL
SUPERVISORY SKILLS

Languages

English
Expert

Training and Certifications

GRE PIPING QUALITY INSPECTOR (Training)
Training Institute:
Future Pipe Industries - FPI UAE
Date Attended:
September 2011
Duration:
56 hours

Hobbies

  • Swiming
    Games playing