Total Years of Experience: 28 Years, 6 Months
December 2008
To Present
Power Plant Professional
at Qatalum / 1360MW Combined Cycle Power Plant
Location :
Qatar
A joint venture company between Qatar Petroleum and Norsk Hydro of Norway. The Qatalum Combined Cycle power plant is composed of two power blocks, both block consists of two (4) Gas turbines GE 9FA and two (2) GE C7 steam turbines. It has a dedicated PMS power management system installed to interface with the Aluminum smelter operations and the electrical grid for safe, reliable and efficient operation of the plant. Created company Power Plant Emergency Response Plan during the initial phase of plant start up and commissioning. Actively engaged in improvement modifications of the power plant operations and maintenance process. Take action to support management functions in achieving KPI objectives and key stakeholders expectations.
April 2008
To June 2008
Electrical Engineer
at Granite Services Inc
Location :
Philippines
Technical support to major plant outage activities for various power plants within the Southeast Asia pacific region.
August 2004
To October 2007
Operations Shift Engineer
at Jubail Energy Company 250MW Combined Cycle Cogen Plant
Location :
Saudi Arabia - Jubail
• Assisted start-up and commissioning phase conducted by Siemens PG for the 250 MW Jubail cogeneration power plant project in Jubail, Saudi Arabia
• Witnessed Electrical testing and commissioning of plant electrical systems and updated electrical punchlist items accordingly.
• Communicated plant inefficiencies, load limitations and pertinent information to Operations & Maintenance Manager
• Supervised and evaluated job performance of operations personnel
• Scheduled shift routine maintenance and inspections for operating personnel
• Safely started up and shut down the cogeneration plant using Teleperm XP control system
• Maintained continuous radio contact with other utility operators to coordinate operations that may affect the operation or production of any unit within the petrochemical complex
• Authorized and/or initiated manual activation of emergency push button when emergency condition arises (e.g. life & safety of the operating personnel at risk, to prevent damage to equipment due to events beyond the installed automatic shutdown protection, massive fire/steam leak, etc.)
• Diagnosed equipment problems, reported abnormal conditions to station management and prepared detailed work requests for plant defects
• Read, interpreted and implemented technical information found in manufacturers & OEM technical manuals, electrical & mechanical P & IDs and operating & maintenance procedures
• Completed vendors training to maintain and enhance the skills required to perform all unit operator and equipment operator duties and assisted in the training of others
• Performed routine chemical analysis of plant water to determine the chemical constituents and took corrective action to maintain plant quality within prescribed limits
• Witnessed Electrical testing and commissioning of plant electrical systems and updated electrical punchlist items accordingly.
• Communicated plant inefficiencies, load limitations and pertinent information to Operations & Maintenance Manager
• Supervised and evaluated job performance of operations personnel
• Scheduled shift routine maintenance and inspections for operating personnel
• Safely started up and shut down the cogeneration plant using Teleperm XP control system
• Maintained continuous radio contact with other utility operators to coordinate operations that may affect the operation or production of any unit within the petrochemical complex
• Authorized and/or initiated manual activation of emergency push button when emergency condition arises (e.g. life & safety of the operating personnel at risk, to prevent damage to equipment due to events beyond the installed automatic shutdown protection, massive fire/steam leak, etc.)
• Diagnosed equipment problems, reported abnormal conditions to station management and prepared detailed work requests for plant defects
• Read, interpreted and implemented technical information found in manufacturers & OEM technical manuals, electrical & mechanical P & IDs and operating & maintenance procedures
• Completed vendors training to maintain and enhance the skills required to perform all unit operator and equipment operator duties and assisted in the training of others
• Performed routine chemical analysis of plant water to determine the chemical constituents and took corrective action to maintain plant quality within prescribed limits
October 2000
To August 2004
Plant Engineer
at 1200MW KEPCO ILIJAN COMBINED CYCLE POWER PLANT
Location :
Philippines
• Handled start-up operations and all other start-up activities such as flushing, chemical cleaning, steam blowing and initial equipment & system operation
• Assisted Electrical commissioning team during testing and commissioning of the plant electrical system.
• Assisted start-up and commissioning phase conducted by the contractors and vendor site representatives (Washington Group, Raytheon Ebasco Overseas Limited, Mitsubishi Heavy Industries, Babcock Hitachi, ABB, Cuttler Hammer and Aquatech)
• Supervised and inspected major systems & equipments like gas turbine, steam turbine, HRSG, compressors, water treatment plant, lube oil system, pumps & motors, BOP and auxiliaries
• Ensure safe handling, tank level measurement or tank gauging and unloading of fuel oil from ship tankers via dedicated jetty unloading facility
• Prepared equipment logs, operating logs and other reports as required
• Operated and monitored gas turbine/steam turbine & generator auxiliary system/equipment such as lube oil system, control oil system, jacking oil system, H2O/CO2 purge system, sweep air compressor and fuel oil & fuel gas system line-up and operated all steam valves on heat recovery steam generator (HRSG) for GT preparation
• Handled the balance of plant system/equipment such as condensate system, circulating water system, feed water system, closed cooling system, service/instrument air system, fire protection system and industrial waste water system
• Assured continuous and reliable power supply to plant essential and auxiliary loads
• Assisted Electrical commissioning team during testing and commissioning of the plant electrical system.
• Assisted start-up and commissioning phase conducted by the contractors and vendor site representatives (Washington Group, Raytheon Ebasco Overseas Limited, Mitsubishi Heavy Industries, Babcock Hitachi, ABB, Cuttler Hammer and Aquatech)
• Supervised and inspected major systems & equipments like gas turbine, steam turbine, HRSG, compressors, water treatment plant, lube oil system, pumps & motors, BOP and auxiliaries
• Ensure safe handling, tank level measurement or tank gauging and unloading of fuel oil from ship tankers via dedicated jetty unloading facility
• Prepared equipment logs, operating logs and other reports as required
• Operated and monitored gas turbine/steam turbine & generator auxiliary system/equipment such as lube oil system, control oil system, jacking oil system, H2O/CO2 purge system, sweep air compressor and fuel oil & fuel gas system line-up and operated all steam valves on heat recovery steam generator (HRSG) for GT preparation
• Handled the balance of plant system/equipment such as condensate system, circulating water system, feed water system, closed cooling system, service/instrument air system, fire protection system and industrial waste water system
• Assured continuous and reliable power supply to plant essential and auxiliary loads
November 1997
To September 2000
Electrical Project Engineer
at Herrera Engineering Corporation
Location :
Philippines
• Assists Electrical Project Manager with respect to preparation of project progress reports and site monitoring activities.
• Expedite withdrawal of line hardware’s needed for the execution of project such as erection, installation of 230KV Power substations & high voltage power transmission lines
• Liaised with the Project Site Manager regarding status of the project and ensured project is on track and not behind the schedule
• Collaborate with engineering design group during course of the project
• Supervised transmission line projects, erection & installation of high voltage transmission lines and ROW (right of way issue) during the erection stage
• Expedite withdrawal of line hardware’s needed for the execution of project such as erection, installation of 230KV Power substations & high voltage power transmission lines
• Liaised with the Project Site Manager regarding status of the project and ensured project is on track and not behind the schedule
• Collaborate with engineering design group during course of the project
• Supervised transmission line projects, erection & installation of high voltage transmission lines and ROW (right of way issue) during the erection stage
Share on Facebook