Ricky Veniegas, QC MECHANICAL ROTATING INSPECTOR

Ricky Veniegas

QC MECHANICAL ROTATING INSPECTOR

TECNICAS REUNIDAS-TR

Location
Qatar - Doha
Education
Bachelor's degree, Engineering
Experience
14 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 9 Months

QC MECHANICAL ROTATING INSPECTOR at TECNICAS REUNIDAS-TR
  • Saudi Arabia - Jizan
  • April 2017 to August 2017

 Check mechanical equipment, materials in accordance with the drawing & specification. Conduct inspection for all mechanical rotating equipments such as equipment installation, material receiving, preliminary and final inspection alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Review and counter sign RFI and all related field inspection checklist by Sub-contractors before submitting to the client. Conduct final box-up inspections on mechanical equipments. Preparation of inspection & test plan (ITP) & checklist for site inspection. Monitor quality controls for each definable area / section of work as per PQP, Method of Statement, ITP & specification. Secure foundation release of the equipments. Check for correct leveling of soleplates & base plate prior to erect the equipment on the foundation. Check for correct orientation & centering of pumps & motor and anchor bolt projection prior to pocket grout. Check of leveling of pumps & motor and elevation of plunges center and initial tight of anchor bolt prior to preliminary alignment. Conduct final inspection of generator & turbine shaft alignment with the client. Conduct final inspection of the turning device shaft alignment with the client. Conduct final inspection of mechanical equipments prior to grouting works. Check for applicable torque values on mechanical structures. Check for pipe stress prior to final alignment on centrifugal pump. Check/inspect the alignment, elevation levelness of the installed stationary & rotating equipment & ensure the deficiencies are within acceptable limit and preparation and monitoring on site.

QA/QC MECHANICAL ROTATING & STATIC INSPECTOR at DAELIM COMPANY LTD.
  • Saudi Arabia - Yanbu
  • August 2016 to November 2016

 Review of all documents for material receiving inspection. Check mechanical equipment & materials in accordance with the drawing & specification. Conduct inspection for all mechanical rotating equipments such as equipment installation of rotating & static equipment. Conduct Inspection of base plates prior to installed or erection of equipment. Conduct centering & coordinates inspection prior to Proceed pocket grout. Hand over to civil for pocket grout. Leveling of pumps and motor or elevation of plunges inspection before to Proceed another activities base in our ITP. Sump pits inspection on pumps, etc. as per project plan and ITP procedures. Review and counter sign RFI and all related field inspection checklists by sub-contractors before submitting to the client. Conduct final box-up inspections on mechanical equipments. Preparation of inspection & test plan (ITP) & checklist for site inspection. Monitor quality controls for each definable area / section of work as per PQP, Method of Statement, ITP & specification. Secure foundation release of the equipments. Check for anchor bolt elevation and location. Check for correct orientation & leveling of the equipments. Check embedded hardware elevation & location. Conduct free alignment of generator & turbine shaft alignment. Conduct final inspection of generator & turbine shaft alignment with the client. Conduct final inspection of the turning device shaft alignment with the client. Check for applicable torque values on mechanical structures. Check for pipe stress prior to final alignment on centrifugal pump. Check/inspect the alignment, elevation levelness of the installed stationary & rotating equipment & ensure the deficiencies are within acceptable limit.

QA/QC MECHANICAL ROTATING & STATIC INSPECTOR at TECNICAS REUNIDAS-TR
  • Saudi Arabia - Yanbu
  • July 2015 to June 2016

 Prepared documents for all mechanical rotating equipments such as equipment installation, material receiving, preliminary alignment and final alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Report to mechanical manager & coordinate with the construction management. Review work schedule, accomplishment, manpower loading & materials procurement, plans, directs. Supervises different types of mechanical work and also rigging, erection, and installation of mechanical equipments pumps & as per in API 686, 650, ASME VIII DIV1&2 standards.
 Coordinate with mechanical / site manager and also handle punch listing. Implement site inspection surveillance plan. Lead and monitor effort in planning and executing lifting activities. To ensure proper applications of a compliance with construction policies, procedures, method and technical requirements of the contract. Ensure all activities comply with OHS standard. Prepare P&ID and equipments drawing priority for inspection. Conduct Site Monitoring Reviewed the DOW / Aramco Engineering Standard. Documents, Procedures, and Typical Inspection Plan. Prepared documents for all mechanical rotating equipments such as equipment installation, material receiving, pre and final alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Preparation of all standard for the installation of monorail hoists and also DIN 536 & 15030 and also FEM 9.511 manual procedure.

Mechanical Equipment Design Technician (Engineer) at TECNICAS REUNIDAS-TR
  • Saudi Arabia - Jubail
  • June 2014 to May 2015

 Responsible for the execution of gas Turbine Erection & Installation Preparation works for PBR/EPDM Saudi Elastomers Project. Duties include control and monitoring, Installation and alignment of Rotating Equipment such as Turbine, Centrifugal, compressors, Reciprocating compressors, Centrifugal pumps, Blowers, and drivers. Inspect, evaluate and arrange field installation and recommend design modification to eliminate machine or system malfunctions. Knowledge and experience in the inspection, performance testing and engineering, pre-commissioning and start-up of Rotating equipments. Knowledge of International Standards such as ASME, API, ASTM, ANSI, API-RP 686 standards associated with rotating equipment, installation, alignment methods, tolerances and basic engineering practices. Check / review vendor documents, P & ID’s, PEFS, ISO drawing, technical specification, engineering drawings and method statements preparation to ensure project execution in accordance with Project requirements. Responsible for the dismantling and re-assembly of Centrifugal pumps, Vertical in line pumps, Reciprocating Compressor, Turbo-Expander compressor, and other Rotating equipment for the replacement of seals, impellers and parts, check internal / Mechanical center section, Bores cope inspection, and equipment preservation. Coordinate with the client PMT), vendors, engineering / other disciplines, suppliers and subcontractors in the control of quality, labor, equipment, and materials to meet schedules and ensure a safe and incident-free planning and project execution. Computer skills: MS Office applications, MS Project and other Software such as, Microsoft word 2007 & Microsoft excel 2007 Integrated Document Management System, Equipment Installation Monitoring System (EQMS), Windows Project Completion and Certification System.

QC Mechanical Supervisor (Commissioning Rotating & Static Equipment) at MITSUI ENGINEERING SHIPBUILDING COMPANY LTD. (MES)
  • Iran
  • January 2013 to December 2013

 Report to the mechanical commissioning manager & coordinate with the construction manager department. review of work schedule and preparation of all site jobs procedure in commissioning job or method of statement in every equipment prior to start execution and accomplishment, man power loading & materials procurement; organize, plans, direct and supervising different trades such as; oil flushing, final cleaning of piping lines, checking the alignment of all rotating equipment prior such as; centrifugal pumps, turbines, compressors. Motor Running Test (MRT) prior to installed the coupling spacer, preparation for start-up and prior to start load running we need to coordinate the mechanical site manager & electrical, instrument department and specially the qc department representative for inspection. Leads monitor in planning & executing commissioning activities and to insure the proper installation for the compliance with construction policies, procedures, methods and technical department of the contract; ensure that all activities comply with ohs standards. Prepared documents for all mechanical rotating equipments such as equipment installation, material receiving, pre and final alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Check the installation of air fan coolers such as; fixing of plenum, tightening, angle of fan blades, motor installation, shafting, shaft sleeve, bearings, flywheel, bracing, top cover, pulley and belt installation. Alignment of rotary equipments such as; compressor and pumps, motor, by using conventional alignment. Final box up checking, filling of chemicals, Manages the start-up activities such as; compressors, turbines, pumps & Perform commissioning activities.

QC Piping Inspector/Line Checker at CHIYODA TECHNIP JOINT VENTURE- CTJV.
  • Qatar - Doha
  • October 2009 to March 2010

 Inspection of Piping and fitting materials (of various grades) such as flanges, elbows, tees, weld-olet etc.(CS, SS, INCONEL, CLADED PIPE & GRE)
 Verification of Structural steel materials of various grades.
 Witness Repairing of Pressure vessel, Heat exchanger etc.
 Inspection of Pipeline valves (as per API 6D), Station piping valves (as per API 598) and the Hydro- testing/Pneumatic testing.
 Verified Welded/Fabricated Structural items.
 Familiar in using International Codes, Standards and Specifications i.e. ASME, ASTM and API etc.
 Line walk and Punch List preparation before Hydro Test
 Review of Hydro test packages
 Witnessing of Hydro testing, Pneumatic testing as per client approved procedures.
 Verification of Reinstatement of Piping systems after completion of all hydro testing activities
 Verification Mechanical completion Package.
 Issue of Non- conformance reports & verification of Corrective/Preventive action
 Liaison with client inspectors for inspections of Hold and Witness Point.

Sr.QC Inspector (Welding / Piping) at MOHAMMAD MOJIL GROUP MMG.
  • Saudi Arabia - Dammam
  • January 2006 to May 2009

 Review/Approval of Inspection & Test Plan/s, Quality Control procedures, Method statements, Welding Procedures etc.
 Monitoring / Witnessing all the Welding, Fabrication & Erection related activities as per client approved Inspection & Test Plans/Quality Control procedures.
 Inspection of incoming materials and reviewing test certificate as per code
 Inspection of piping materials identification as per isometric drawings.
 Witnessing of activities like PQR, Welder’s qualification Tests, Mechanical testing and preparation of PQR records and WQT certificates.
 Stage wise inspection before, during and after fabrication.
 Monitoring of radiographic films, Witnessing of UT, MPI, DPI, Hardness, PWHT and review of test reports.
 Review of Daily Welding reports & Welding Pipe book.
 Witnessing of Weld repair activities as per client approved WPS.
 Line walk and Punch List preparation before Hydro Test
 Review of Hydro test packages
 Witnessing of Hydro testing, Pneumatic testing as per client approved procedures.
 Verification of Reinstatement of Piping systems after completion of all hydro testing activities
 Verification Mechanical completion Package.
 Issue of Non- conformance reports & verification of Corrective/Preventive action
 Liaison with client inspectors for inspections of Hold and Witness Point.
 Witnessing / Inspection of Tie-In and Hot Tap welding activities.
 Witnessed Refinery Maintenance/ shut down Inspection of vessel, column, Heat exchanger & Piping Hot tap
 Check calibrated equipment is displaying current certificate.

QC Enngineer II (QC In-Charge – Mechanical / Piping & Welding) at EEI CORPORATION
  • Philippines
  • August 2004 to September 2005

 Overall in-charge for Mechanical/Piping/Welding & Structural.
 Implementation of quality control hold point and initiate corrective action request of non-conformances report.
 Responsibilities include sanitary lines, fire protection lines, storm drainage PO material evaluation, material receiving inspection.
 Check welder’s qualification and monitor welder’s performance prior to clients review and evaluation.
 Perform visual inspection of all completed welds subject for scheduling of NDE as per ASME section V.
 In process inspection work include inspection of Structural Beams, Girder, Flat form and sump-pit.
 Witness Ultrasonic Testing (UT) Yield/Ultimate Stress Cold Bend and Tensile of Structural steel bars.
 Prepare all necessary quality control inspection reports/ documents for final review.

 Will be responsible for receiving and passing-on instruction from department head supervisors. Will supervise and motivate team of 3-5 groups of Millwright workers. Welders Structural and Pipe fitter will communicate progress and work with department supervisors. Will work with team to complete Millwright jobs in rotating equipment as a timely and efficient manner. Lead all Millwright workers to Align of rotary equipments such as; compressor and pumps, motor, by using conventional alignment & reverse alignment. Erection, centering & final tightening of anchor bolt. Skid centering & checking the plumpness using transit level. Checking the verticality of the equipment. Preparation of the foundation such as, chipping & installation of packer plates using the theodolite or auto level in checking the elevation from the bench mark. Erection of feed water pump preparing all procedure of millwright works such as grouting until final grouting. Alignment of feed water pumps from preliminary alignment & final alignment with parallism by applying face & rim or conventional alignment. Erection of blow down return pump & applying single alignment. Erection of auxiliary cooling water pump for single cycle pump applying single alignment. Erection of auxiliary cooling water pump for combine cycle pump & applying single alignment. preliminary and final alignment.

QC MATERIAL PIPING INSPECTOR at CHIYODA PETROSTAR LTD./ ARCC- CONSTRUCTION CO LTD.
  • Saudi Arabia - Jubail
  • June 2003 to June 2004

 Inspected tested and measured materials product and installation to specification.
 Measured pipe dimensions to ensure compliance with specification
 Marked pipes with grade and acceptance rejection status
 Documented, file and maintained proper inspection records and quality assurance documents.
 Verified that machine setups conformed to specification
 Verified Cutting out-fit and welded metal components, including plate, and pipe.
 Manage work with little supervision.
 Interpreted and classified production and quality data.
 Recommended corrective actions to minimize rate of product defects.(NCR)
 Cleaned, wrapped labeled outgoing orders.
 An accomplished and focused professional with demonstrated experience in equipment and devise processing for manufacturing product.
 Recognized for professionalism, positive mental attitude, commitment to excellence and demonstrated ability to communicate and working with senior management, associates and customers.
 Able to handle multiple projects and meet deadlines under pressure. Excellent interpersonal skills, able to communicate and collaborate effectively with co-workers at all levels.

QC Engineer II (MEP-MECHANICAL ELECTRICAL and PLUMBING) at ECW/EEI JOINT VENTURE INCORPORATED
  • Philippines
  • October 2000 to March 2002

 Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives; setting out, leveling and surveying the site; checking plans, drawings and quantities for accuracy of calculations; ensuring all materials used and work performed are as per specifications; managing, monitoring and interpreting the contract design documents supplied by the client/architect; liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce involved in the project; liaising with the local authority to ensure compliance with local construction regulations and by-laws; liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress; day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors; planning the work and efficiently organizing the site facilities in order to meet agreed deadlines; overseeing quality control, health and safety matters on site; preparing reports as required; resolving any unexpected technical difficulties, and other problems that may arise Inspects all works during, pre and post construction process and strictly implement Method Statement, Standard Drawings and Work Specifications for the construction of project. Give full assistant for the Project Engineer/Manager in all activities required to be delivered in the site on timely manner and required Quality/Quantity. Oversee and execute site by following approved construction drawing and prescribed policies. Define the project materials, manpower’s and equipments needed to finish the work assigned. Study drawing to provide technical clearance to foreman in coordination with the Project Manager and Consultant. Initiate Fast Accident Report immediately when an accident/incident noticed, and forward to the Safety Officer and Project Manager. Attend coordination meeting with the Project Owner, Project Manager, and all Sub-Contractors to discuss Quality, Safety and Construction Progress. Prepare Materials Daily Report and Schedule of Works (Weekly)Provides Daily Activity Reports of day to day activities/operations. Implement Environmental Health and Safety Procedures.

QC ENGINEER MECHANICAL PIPING at ARCC- CONSTRUCTION LTD./ EEI-CORPORATION (Joint Venture Project)
  • Saudi Arabia - Hofof
  • January 1999 to March 2001

 Line walk and Punch List preparation before Hydro Test
 Review of Hydro test packages
 Witnessing of Hydro testing, Pneumatic testing as per client approved procedures.
 Verification of Reinstatement of Piping systems after completion of all hydro testing activities
 Verification Mechanical completion Package.
 Issue of Non- conformance reports & verification of Corrective/Preventive action
 Liaison with client inspectors for inspections of Hold and Witness Point.
 Witnessing / Inspection of Tie-In and Hot Tap welding activities.
 Witnessed Refinery Maintenance & shut down Inspection of vessel, column, Heat exchanger & Piping Hot tap

 Prepared documents for all mechanical rotating equipments such as equipment installation, material receiving, preliminary alignment and final alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Report to mechanical manager & coordinate with the construction management. Review work schedule, accomplishment, manpower loading & materials procurement, plans, directs. Supervises different types of mechanical work and also rigging, erection, and installation of mechanical equipments pumps & as per in API 686, 650, ASME VIII DIV1&2 standards.
 Coordinate with mechanical / site manager and also handle punch listing. Implement site inspection surveillance plan. Lead and monitor effort in planning and executing lifting activities. To ensure proper applications of a compliance with construction policies, procedures, method and technical requirements of the contract. Ensure all activities comply with OHS standard. Prepare P&ID and equipments drawing priority for inspection. Conduct Site Monitoring Reviewed the SAES Engineering Standard. Documents, Procedures, SATIP Typical Inspection Plan. Prepared documents for all mechanical rotating equipments such as equipment installation, material receiving, pre and final alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Preparation of all standard for the installation of monorail hoists and also DIN 536 & 15030 and also FEM 9.511 manual procedure.

JR. QC MECHANICAL ROTATING EQUIPMENT INSPECTOR at EEI CORPORATION/MHI CONSURTIUM PROJECT
  • Philippines
  • June 1997 to December 1998

 Check mechanical equipment, materials in accordance with the drawing & specification. Conduct inspection for all mechanical rotating equipment such as equipment installation, material receiving, preliminary and final alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Review and counter sign RFI and all related field inspection checklists by sub-contractors before submitting to the client. Conduct final box-up inspections on mechanical equipment. Preparation of inspection & test plan (ITP) & checklist for site inspection. Monitor quality controls for each definable area / section of work as per PQP, Method of Statement, ITP &specification. Secure foundation release of the equipment. Check for correct leveling of sole plate & base plate. Check for anchor bolt elevation and location. Check for correct orientation & leveling of the equipment. Check embedded hardware elevation & location. Conduct free alignment of generator & turbine shaft alignment. Conduct final inspection of generator & turbine shaft alignment with the client. Conduct final inspection of

Education

Bachelor's degree, Engineering
  • at Philippine State College of Aeronautics
  • March 1997

Graduated Bachelors of Science in Aircraft Maintenance Engineering

Specialties & Skills

Inspection
Site Supervision
API RP 686
INSPECTION TESTING QUALITY
MATERIAL INSPECTION VENDOR DATA SHEET
MATERIALS MANAGEMENT
MECHANICAL
MICROSOFT WORKS
QUALITY
QUALITY CONTROL

Languages

English
Expert
Tagalog
Expert

Training and Certifications

ARAMCO Approval (Certificate)
Date Attended:
April 2017
Valid Until:
August 2017
Non Destructed Testing ASNT TC-1A Level II (PT/MP) (Training)
Training Institute:
Institute of Material Testing Technology
Date Attended:
December 2011
Duration:
12 hours

Hobbies

  • Reading pocket books, News paper , and Playing Basket Ball and Taekwondo sometimes.