Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Romnick Gaspar, QA QC Engineer

Romnick Gaspar

QA QC Engineer·Royal Devlopment for Gas Works and Contracting

United Arab Emirates

Bachelor's degree, Mechanical Engineering

Work experience

Total years of experience: 13 years, 0 months

QA QC Engineer

January 2023 - Present

Royal Devlopment for Gas Works and Contracting

Abu Dhabi, United Arab Emirates

January 2023 - Present

• Arrange materials, tools, equipment, and instrument necessary for the O&M project from request for quotation up to delivery
• Material Receiving Inspection for new material/s, equipment, and instruments, and for recalibrated equipment and instruments
• Cathodic Protected (CP) System quarterly monitoring/survey, inspection, testing, and reporting for steel pipelines and NGV stations as per PM schedule
• Maintaining Equipment, Tools and Instruments Calibration Register and Certificates, ensuring all are with valid calibration, send instruments and equipment for recalibration as necessary
• Maintaining Third Party EVC Verification Register and Certificates, ensuring all EVCs are verified as per planned annual PM schedule
• Witness, inspection and approval for tie-in connections as per tie-in checklist, MS, DDR, and requirement from ADNOC
• Witness and Approval of Pressure Testing / Leak Testing, and ensure implementation according to Approved Procedure
• Maintain Tie-in Log Summary, review and consolidation of TPI Tie-in reports
• Ensure tools/equipment/ instruments with valid calibration, materials to be used having MTCs available, welder/fusion technician are qualified, and implementation according to Procedure/s for welding/fusion activities
• Generate and submit weekly Report to ADNOC City Gas
• Generate Monthly Calendar for Quality and Integrity-related activities, and ensure implementation
• Prepare and submit HSECES Tracking Register, along with supporting documents/reports, on monthly basis showing actual progress for Leak Survey, CP Monitoring, Odorant Monitoring, Network Pressure Monitoring, PRV calibration of RPRS, Stream Shifting of RPRS, Pressure Regulator Inspection, Filter Cleaning/Replacement, Calibration of Detection Systems Portable Gas Monitoring/Testing Equipment
• Attend/Participate in Weekly Meeting between ADNOC City Gas and Royal Gas O&M Team
• Maintaining Quality and Asset Integrity-related Procedures and Forms, and generating new ones and reviewing/updating existing ones, as necessary
• Carry out Internal Audit to various departments such as O&M, Purchasing/Procurement, HR, Control Room
• Act as focal person auditee for ADNOC City Gas Quality Performance Audit and responsible for the close-out of Quality-related NCs, Observations and OFIs.
• Arrange for and ensure recalibration of pressure gauges for RPRS as per annual PM schedule
• Arrange for and ensure recalibration of Pressure Relief valves for RPRS as per annual PM schedule

Company industry:
Oil & Gas
Job role:
Oil and Gas

QC Supervisor

August 2020 - June 2021

Lootah BC Gas

Dubai, United Arab Emirates

August 2020 - June 2021

• Carry out Asset Integrity Inspection of the entire LPG/SNG Gas Storage Plants
• Daily supervision of multidiscipline QC engineers/inspectors and their activities
• Monitoring of daily inspection activities, reviewing reports & coordinate any clarifications that may arise
• Generating Inspection and Test Plans (ITPs) and Project Quality Plans (PQP) for each project
• Generating Inspection Checklist for Piping Installation, Pressure Test, Pre-Commissioning and Commissioning of Gas System in accordance with ASME, DCD Code, NFPA 54 and NFPA 58 and other applicable industry standards
• Reviewing, Commenting and Providing Inputs to Construction Method Statements and Material Submittals, Operations & Maintenance (O&M) Non-Routine Operating Procedures (NROPs) prior Top Management’s approval and external submission to Third Party/Consultant/Client
• Establishing, maintaining, and monitoring the daily / weekly QC reports.
• Ensure all findings are documented & followed-up where applicable.
• Reviewing of below ground & above ground handover packages, prior submission to Consultant/Client for approval
• Conduct Quality and Process Overview Training of LBCG system
• Assist in the Preparation of PQR and WPS of SMAW and GTAW Welding Process for Piping and Structural Fabrication
• Ensure that the Corrective Action Requests (CARs) and Corrective/Preventive Action Requests (CPARs) issued are followed up and closed
• Ensure that all non-conformities (NCRs) identified are effectively addressed, monitored and closed

Company industry:
Oil & Gas
Job role:
Quality Control

QC Engineer

July 2018 - August 2020

Lootah BC Gas

Dubai, United Arab Emirates

July 2018 - August 2020

• Carry out inspection / monitor and ensure compliance with project-specific QA/QC requirements such as SOW, Project Specifications, Method Statements, Inspection Procedures, checklists, ITPs
• Conduct Receiving Material Inspection, approve/reject materials against approved Material Submittals, and ensure availability of test certificates prior to release at site
• Responsible for inspection requirements of piping and equipment (static, rotating, packaged equipment) during material receipt, preservation, installation and testing at site
• Participate / perform stage wise and final inspections of installed equipment (LPG storage tanks, vaporizers, pump, compressor and pressure reducing & metering station)
• Ensure that any non-conformities (NCRs) identified are effectively addressed, monitored and closed
• Plan and conduct quality audits/ surveillance audits on Project and Operations & Maintenance Team to ensure that the QA requirements are properly identified and implemented during project execution phase
• Ensure that the CARs and CPARs issued are followed up and closed
• Conduct Walkdown Inspection for LPG or SNG Plant and Below Ground Distribution Network, generate snags list, followed up and closed
• Witness and approve Hydrostatic or Pneumatic testing of Above ground (carbon steel) and Below ground (HDPE) piping
• Witness and approve Tightness/Leak Testing of piping and Functionality Testing of gas system components
• Prepare Handover Package of LPG Plant and Below Ground Distribution Network for submission to Consultant and/or Client for their approval
• Review / comment Inspection & Test Plans, Method Statements and Pre-Commissioning Procedure submitted by Project Team and monitor their implementation at site
• Review / comment Commissioning Procedure submitted by Operations & Maintenance Team and monitor their implementation at site

Company industry:
Oil & Gas
Job role:
Quality Control

Project Engineer cum QC Engineer

June 2016 - December 2017

Manila Water Philippine Ventures – Clark Water

Philippines

June 2016 - December 2017

Core Accomplishments:
• Led the project execution, testing and commissioning of two-2000 cubic meters per day DMI-65 Water Treatment Plant (WTP) and 9000 cubic meters per day Granulated Activated Carbon (GAC) WTP Projects
• Awarded as Team of the Quarter on Apr 2017, under the category of OPERATIONAL EXCELLENCE, for being part of and leading the team who handled the successful commissioning and start-up of a booster pumping facility with 2.4 km pipeline and 5.3 cubic meter elevated steel tank
• Assisted the Construction Manager in the successful project completion, testing and commissioning of two-2500 cubic meter Steel-Bolted Storage Tanks with booster pumping facility
• Acted as Officer-in-Charge (OIC) Construction Manager from Oct-Dec 2017 upon the transfer and promotion of Construction Manager to new branch
Duties and Responsibilities:
• Handled the overall execution and management responsibilities related to the engineering, design, budget, schedule, QA/QC, project execution and commissioning of Water and Wastewater Facilities’ Projects to ensure on-time, within scope & budget, and within standard quality of works
• Acted as the key liaison person between the company and contractors in all project activities to resolve all design, engineering, safety and construction issues
• Witnessed and approved QA/QC testing, such as concrete compressive strength test, holiday test, and hydrostatic or pneumatic test of pipes & pressure vessels
• Ensured that all materials and project works comply with approved technical specifications, industry standards and as per approved Construction Drawings through regular site inspections
• Ensured complete physical documentation of all projects (design drawings, correspondences, daily progress reports, Project schedule, QA/QC testing results, As-built Drawings, etc.)

Company industry:
Utilities
Job role:
Engineering

Reliability Engineer cum Inspection Engineer

December 2014 - February 2016

Petron Corporation – Bataan Refinery

Philippines

December 2014 - February 2016

Core Accomplishments:
•Led and completed the development of Asset Policy for DCU critical equipment (2.6MW Cutting Pump, 5000-lbs rated Electric Winches, Cutting Tools, Rotary Joints, 3600 psig Decoking Control Valve, 36” & 60” Unheading Valves, 4-way Ball Valves, Steam Purged Valves, 820KW Heater Charge Pumps).
•Established and implemented Preventive Maintenance (PM) Programs for the new facilities (such as Hydraulic Decoking System, Coke Handling Bucket Cranes, Unheading Valves, and Steam Purged Valves, etc.) in coordination with Original Equipment Manufacturer (OEM) and based on vendor’s Installation, Operation and Maintenance (IOM) Manuals.
•Provided analysis and recommendations on equipment failures through Plant Reliability Reports that ensured non-recurrence of the same integrity issues using Root Cause Failure Analysis.
•Lead Inspector of DCU during a 11-day planned Oct 2015 Shutdown (SD) and had provided inspection findings and recommendations in a Plant Reliability Group SD Report.
•Established and implemented on-service and out-of-service Inspection Programs, such as regular UT gauging of Thickness Monitoring Locations, and monthly thermographic survey of coker heaters).

Duties and Responsibilities:
•Responsible for advising and assisting the Chief Reliability Engineer and Area Managers on matters pertaining to the day to day and long-term plant reliability programs to prevent costly and unplanned shutdowns and to extend the productive life of refinery mechanical equipment, both static and rotating.
•Tasked to do high level analytical activities, in-depth technical studies, Risk-Based Inspection with Inspection Report that recommends preventive or corrective maintenance of faulty DCU’s mechanical equipment, auxiliaries, piping or related components (e.g., pumps, compressor, manual and control valves, pipes, tanks, strainer, fired heater, or pressure vessels in the form of towers, shell & tube heat exchangers, air fin coolers, drums) in accordance with engineering codes and standards such as ASME, API and ExxonMobil Global Practice (GP).
•Investigated and coordinated with OEM the corrective measures and possible upgrades to resolve failures of critical equipment (such as rotary joints, decoking control valve, cutting tools, coker cranes, electric hoists) to optimize their service life, consistent with safe and efficient operations.
•Actively participated in turnaround and/or planned shutdown reviews.
•Planned and conducted Non-destructive Testing (NDT), such as Positive Material Identification (PMI), Radiographic Testing (RT), Penetrant Testing (PT), Magnetic Particle Testing (PT), Ultrasonic Testing (UT) Gauging, Brinell Hardness (BHN) Testing, and Borescope Inspection.
•Witnessed and approved Popping Test of Pressure Safety Valves (PSVs), Hydrostatic Test of heat exchangers/ valves/ piping and Seat Leakage Test of valves.

Company industry:
Oil & Gas
Job role:
Engineering

Project Engineer cum QC Engineer

November 2012 - December 2014

Petron Corporation – Bataan Refinery

Philippines

November 2012 - December 2014

Core Accomplishments:
• Successful Mechanical Completion of first-ever Delayed Coker Unit (DCU) in the Philippines, a 14.5B Php worth of EPC project and one of the major units of Petron Refinery Master Plan 2 (RMP-2) Project
Duties and Responsibilities:
• Oversee the overall implementation of scope of works, Approved for Construction Drawings, Inspection & Test Plans Method Statements, Pre-commissioning and Commissioning Procedures
• Reviewed and approved equipment Data Sheets, Vendor Prints and Equipment Assembly drawings
• Conducted regular technical and quality inspection of newly installed mechanical equipment, pipelines and pressure vessels including its internals prior box-up, and issued field memoranda for non-compliance to approved construction drawings, FWUSA specifications, API, ASME, GP and applicable project specifications
• Conducted piping line to line checking at site that ensured pipelines and components were installed as per approved P&ID and isometric drawings
• Facilitated weekly Contractors Coordination meetings to resolve design, engineering, construction and safety issues.
• Ensured on-time and 100% rectification of punch items by facilitating weekly punch clearing meeting
• Witnessed and approved piping Pre-Commissioning activities such as line cleaning (steam blowing, air blowing, water flushing etc.) and reinstatement
• Witnessed and approved Hydrostatic or Pneumatic Testing

Company industry:
Oil & Gas
Job role:
Engineering

Tutor

April 2011 - October 2012

TutorLink Tutorial and Review Center

Philippines

April 2011 - October 2012

• Mentored grade school and high school students with subjects such as Physics, Chemistry, Algebra, Trigonometry, etc.

Company industry:
Primary, Prep, & Secondary School
Job role:
Teaching and Academics

Education

University of the Philippines (UP) Diliman

April 2012

April 2012

Bachelor's degree, Mechanical Engineering

Philippines

GPA (point): 1.711 out of 5

GPA (point): 1.711 out of 5

-Graduated cum laude -Consistent dean's lister - Top 5 of Batch 2012 UP Diliman BS ME Graduates -88 % rating on Sept 2012 ME Licensure Examination

Benigno S. Aquino National High School

April 2007

April 2007

High school or equivalent, None

Philippines

GPA (percentage): 92%

GPA (percentage): 92%

-Consistent honor student

Skills

Oil and Gas

Expert

Microsoft Office

Expert

Inspection

Expert

QA QC

Expert

Project Management

Expert

P&ID

Expert

Pre-Commissioning

Expert

Commissioning

Expert

Pressure Testing

Expert

AutoCAD

Intermediate

Project Handover and Close-out

Expert

Isometric Drawing

Expert

Operations & Maintenance

Intermediate

Snags/Punch Listing and Close-out

Expert

API, ASME, IGE, NFPA, DCD

Expert

Material Inspection

Expert

BUSINESS CASE

Expert

Oil & Gas

Expert

Mechanical Piping and Equipment

Expert

Driving

Intermediate

Oil and Gas

Expert

Microsoft Office

Expert

Inspection

Expert

QA QC

Expert

Project Management

Expert

Languages

English

Expert

Filipino

Native Speaker

Memberships

Philippine Society of Mechanical Engineers

Member

June 2009

Training and Certifications

Certifications
CQI | IRCA Approved ISO 9001:2015 QMS Lead Auditor
Oct 2022 - Oct 2027
Scaffolding Inspector for Safe Scaffold Erection and Dismantling
Dec 2019 - Dec 2021
Construction Occupational Safety and Health
Oct 2017

Training
ISO 9001:2015 Awareness Training
Applus Velosi
Nov 2019
Pre-Commissioning Training
Global Energy
Jan 2014
Confined Space Entry Training
Department of Labor and Employment, Philippines
Feb 2014
Coke Handling Bucket Crane Mechanical Training
Konecrane India
Jan 2015
Ultrasonic Testing Level I
APEX Engineering Services
Mar 2015
Radiographic Testing (Level II)
Philippine Nuclear Research Institute
Jul 2015
Project Management Seminar
University of Asia and the Pacific
Nov 2015
WaterLinks 2016 “Building Climate-Resilient Water Utilities in Urban Asia”
WaterLinks
Oct 2016

Hobbies and interests

Cooking

-Varieties of Filipino dishes

Traveling

-Philippine Tourist Spots (Boracay, Bolinao, Puerto Galera, Anawangin, Hundred Islands, etc) -Bangkok, Thailand -Dubai, United Arab Emirates -Abu Dhabi, United Arab Emirates