Helper
Qatargas Operating Company Limited
Total years of experience :9 years, 9 Months
-IBD(Inlet Blow Down)
To remove excessive Silica Phosphate and corrosive material inside of the boilers.
-Chemical Top Up:
• Oxygen Scavenger(NALCO 1800)-Condensate Treatment
• Fresh Cooling Water(NALCO TRAC109)-Water Treatment
• Phosphate(NALCO 72215)- Boiler Water Treatment
-Assisting Rover Operators for some Isolation and De- isolation Process.
• Mechanical
• Electrical
-Collecting Water Samples:
• CBD Boiler Waters
• Desal Water
• Suspect Condensate Carbon filter
• Potable Water
• Boiler Feed Waters
• Caustic Chemical
• Fresh Cooling Water
-Shutdown and Start Up Operation:
• Boiler Waters
• Gas Turbine Generator
• Steam Turbine Generator
• Fresh Cooling Water System
-To monitor and secure the whole building. Maximize the security and safety of the person inside and out of the building.
-To protect the property and the people.
-To monitor and secure the whole building. Maximize the security and safety of the person inside and out of the building.
-Monitor False alarm in the Building
-Maximize Fire Prevention