Total Years of Experience: 13 Years, 5 Months
April 2016
To Present
Planning Enginner
at Commodore Contracting Company
Location :
United Arab Emirates - Abu Dhabi
• Preparing construction Baseline for execution accordance with consultant and contractor mutual understanding.
• Update of Baseline & Recovery program and related reports e.g. Dashboard, Cost Control, KPI & Management etc.
• Monthly and weekly Progress Reports for submittal to consultants/clients.
• Weekly & Monthly Update of Work program and related Engineering Master logs.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates.
• Look ahead work schedule with real time activities.
• Preparing Resource Histograms, expected Cash Flows and S-Curve.
• Communicating with the Project Manager and project all through the process and monitoring/reporting activities of Interior and Infrastructure.
• Coordinating with MEP Subcontractor for their Engineering logs.
• Preparing labor & non-labor Resource breakdown reflecting on activities under the light of BOQ for building other than Main Hospital Building. Preparing Resource Histograms, expected Cash Flows and S-Curve for building other than Main Hospital Building.
• Update of Baseline & Recovery program and related reports e.g. Dashboard, Cost Control, KPI & Management etc.
• Monthly and weekly Progress Reports for submittal to consultants/clients.
• Weekly & Monthly Update of Work program and related Engineering Master logs.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates.
• Look ahead work schedule with real time activities.
• Preparing Resource Histograms, expected Cash Flows and S-Curve.
• Communicating with the Project Manager and project all through the process and monitoring/reporting activities of Interior and Infrastructure.
• Coordinating with MEP Subcontractor for their Engineering logs.
• Preparing labor & non-labor Resource breakdown reflecting on activities under the light of BOQ for building other than Main Hospital Building. Preparing Resource Histograms, expected Cash Flows and S-Curve for building other than Main Hospital Building.
September 2014
To March 2016
Planning Engineer
at Daary General Contracting (Rays International)
Location :
United Arab Emirates - Abu Dhabi
• Preparing Baseline Program in accordance with the contract documents, specs, Drawings & BOM/BOQ by using PRIMAVERA.
• Coordination with client and consultant for work progress and attend the meetings Project weekly/ monthly progress.
• Update of work program and progress related reports.
• Preparing Extension of Time (EOT) claims.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates.
• Look ahead work schedule with real time activities.
• Preparing Resource Histograms, expected Cash Flows and S-Curve.
• Communicating with the Project Manager and project all through the process and monitoring/reporting activities of Interior and Infrastructure.
• Maintaining and documenting the Extension of Time (including variations) for each project and pre-warning the Operations Team and management for requirement of extension of time.
• Preparing Monthly and weekly Progress Reports for submittal to consultants/clients.
• Preparing Recovery Programs for approval by clients and consultants, With prior approval by the management.
• Coordination with client and consultant for work progress and attend the meetings Project weekly/ monthly progress.
• Update of work program and progress related reports.
• Preparing Extension of Time (EOT) claims.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates.
• Look ahead work schedule with real time activities.
• Preparing Resource Histograms, expected Cash Flows and S-Curve.
• Communicating with the Project Manager and project all through the process and monitoring/reporting activities of Interior and Infrastructure.
• Maintaining and documenting the Extension of Time (including variations) for each project and pre-warning the Operations Team and management for requirement of extension of time.
• Preparing Monthly and weekly Progress Reports for submittal to consultants/clients.
• Preparing Recovery Programs for approval by clients and consultants, With prior approval by the management.
November 2013
To August 2014
Planning Engineer
at Phoenix Timber Factory LLC
Location :
United Arab Emirates - Abu Dhabi
★ Developed the Baseline work Schedule for projects related to Joinery & Civil Works
★ Responsible for Progress Reporting, monitoring, and had highlighted any deviation from baseline program
★ Weekly Factory and Site visit for the collection of progress data
★ Prepared cost estimate evaluation for Bill of Quantities related to Joinery & Civil Works
★ Essential study of Drawings, contract and based on tender identified the desired product requirement
★ Follow up with raw material suppliers for rate and cost estimate till end product
★ Responsible for Progress Reporting, monitoring, and had highlighted any deviation from baseline program
★ Weekly Factory and Site visit for the collection of progress data
★ Prepared cost estimate evaluation for Bill of Quantities related to Joinery & Civil Works
★ Essential study of Drawings, contract and based on tender identified the desired product requirement
★ Follow up with raw material suppliers for rate and cost estimate till end product
December 2012
To October 2013
Planning Engineer
at Areenouf Group
Location :
United Arab Emirates - Abu Dhabi
• Planning & scheduling the project in accordance with the contract documents, specs, Drawings & BOM/BOQ’s by using PRIMAVERA.
• Coordination with client and contractor for work schedule and attend the meetings with related authorities for Project weekly/ monthly progress.
• Update of Baseline Program & KPI.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates. Look ahead work schedule with real time activities.
• Identifying alerts regarding work schedule.
• Preparing resource histograms and Cash Flow.
• Communicating with the Project Manager and the supervisors all through the process and monitoring/reporting activities of Interior/ Infrastructure for execution to handing over.
• Maintaining and documenting the Extension of Time. Maintaining the delay analysis & to ensure every issue is being recorded & addressed in Issue log.
• Alarming management and execution team about anticipated delays on any critical component of the project. Preparing Monthly Progress Reports for submittal to consultants or clients.
• Preparing Recovery Programs for approval by clients and consultants. Responsible for monitor the progress in the fit out / construction process and continuous checking with project schedule.
• Coordination with client and contractor for work schedule and attend the meetings with related authorities for Project weekly/ monthly progress.
• Update of Baseline Program & KPI.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates. Look ahead work schedule with real time activities.
• Identifying alerts regarding work schedule.
• Preparing resource histograms and Cash Flow.
• Communicating with the Project Manager and the supervisors all through the process and monitoring/reporting activities of Interior/ Infrastructure for execution to handing over.
• Maintaining and documenting the Extension of Time. Maintaining the delay analysis & to ensure every issue is being recorded & addressed in Issue log.
• Alarming management and execution team about anticipated delays on any critical component of the project. Preparing Monthly Progress Reports for submittal to consultants or clients.
• Preparing Recovery Programs for approval by clients and consultants. Responsible for monitor the progress in the fit out / construction process and continuous checking with project schedule.
July 2011
To November 2012
Planning Engineer
at Al-Prince Engineers Ltd
Location :
Pakistan - Lahore
• Preparing Baseline Program in accordance with the contract documents, specs, Drawings & BOM/BOQ by using PRIMAVERA & MS Project.
• Coordination with client and consultant for work progress and attend the meetings Project weekly/ monthly progress.
• Update of Baseline Program, KPI and Preparing resource histograms.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates.
• Look ahead work schedule with real time activities.
• Identifying alerts regarding work schedule.
• Coordination with client and consultant for timely completion of the activities and attend the meetings with related authorities for approvals.
• To monitor the progresses in the construction process and continuous checking this with the project schedule.
• Analyze the construction sites as well as the local environments to arrange proper logistics solutions and resources in order to execute the program.
• Coordinating filed activities regarding design changes and internal scheduling with consultants and project manager.
• Responsible for the daily progress report of the Civil, Mechanical & Electrical works and informed the Site Incharge, construction manager, consultants and clients.
• Supervision, checking of subcontractor’s bill and coordinating their on-field work.
• Coordination with client and consultant for work progress and attend the meetings Project weekly/ monthly progress.
• Update of Baseline Program, KPI and Preparing resource histograms.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates.
• Look ahead work schedule with real time activities.
• Identifying alerts regarding work schedule.
• Coordination with client and consultant for timely completion of the activities and attend the meetings with related authorities for approvals.
• To monitor the progresses in the construction process and continuous checking this with the project schedule.
• Analyze the construction sites as well as the local environments to arrange proper logistics solutions and resources in order to execute the program.
• Coordinating filed activities regarding design changes and internal scheduling with consultants and project manager.
• Responsible for the daily progress report of the Civil, Mechanical & Electrical works and informed the Site Incharge, construction manager, consultants and clients.
• Supervision, checking of subcontractor’s bill and coordinating their on-field work.
December 2010
To June 2011
Site Engineer
at Ghulam Habib Co. Ltd
Location :
Pakistan - Peshawar
• Ensure Quality of work at site.
• Prepare the bar bending schedule.
• Preparation of concrete pouring slips.
• Complete Layout for Domestic Building Works.
• Responsible for all on-site buildings construction activities.
• Supervision and Execution of all kinds of Domestic Building Works.
• Prepare the bar bending schedule.
• Preparation of concrete pouring slips.
• Complete Layout for Domestic Building Works.
• Responsible for all on-site buildings construction activities.
• Supervision and Execution of all kinds of Domestic Building Works.
July 2009
To August 2009
Intern
at Metecno Pakistan (Pvt) Ltd
Location :
Pakistan - Lahore
• Checking of Bill of Quantities.
• P.E.B (Pre-Engineered Building).
• Worked in L.G.S (Light Gauge Structures) under the light of BS Code and ACI.
• Estimation of Quantities, Tensile and Chemical Properties of Nut Bolt Assembly.
• P.E.B (Pre-Engineered Building).
• Worked in L.G.S (Light Gauge Structures) under the light of BS Code and ACI.
• Estimation of Quantities, Tensile and Chemical Properties of Nut Bolt Assembly.