Site Engineer
data Link
مجموع سنوات الخبرة :3 years, 11 أشهر
Operation management for all IT infrastructure components \{Power, Cooling, RMU, MV Switch gears, Transformer, LVCB, Genset, Sync Panel, ATS, MDB, UPS, busways, PDU, all sensing and environment system\}, periodic testing with commissioning of all infrastructure based on the Tire lll Data Center Procedures.
Monthly, Quarterly & yearly Preventive Maintenance Planning depending on the Coordinated Schedules, Technical studies & Reports.
• theengineeringdrawingforreghting(AutoCAD)
• Quantitysurveyforplumbingandreghtsystem.
• Preparationofworkstatusformechanicalsystem.
• purchaserequest(PR), purchaseoer(PO).
Automatic moving cleaner system: The project is a device that is placed on a track and moves vertically by an electric screw and guide rods, placed between the roads on the sidewalk, and on each side there is a vacuum cleaner so that the waste is drawn onto the road. Bottled water production line: It produces a complete lling of plastic bottle with water, and the rst step begins with inserting the bottle while it is empty and ll it water and nally closing the bottle cover automatically. Fatigue test machine: program the device on the Arduino and add a sensor so that when the sample is broken, the device is automatically turned o and also an LCD screen is added to show Rpm for the motor.