Projects Engineer then Deputy Projects Manager
Secutronic
Total years of experience :9 years, 5 Months
Project Manager Security Systems Projects SABIC Projects
Lead the team on the site and distribute the tasks to the engineers and technicians
Manage the meeting with the stakeholders or clients
Determine the necessary requirements for the project
Determine the risks and identify the risks, analyze and how to fix it
Prepare the plans and schedules CM and PM with the client then implement the plans
Prepare the reports for our management and Clients
Administrative work
RFQand RFP and evaluate the suppliers
Connect with the suppliers and provide the best service to the customer
Ensuring that the site with healthy satution
Issuing permits
Negotiations with the clients if needed
Solve any problems among the team and customers if it is occur
Technically assisting team
Security systems maintenance ACS, CCTV, X-Ray, metal detector Road Blockers and. Physical equipment.. Etc..
Periodic meetings to solve any problems with the team
Managing Aramco AMT contract 10 Sites around +38 employees .
lead the meetings with our clients and our team
Evaluate the supplier or sub-contractors , performance and quality .
Security Access Control Systems Engineer working on the LENEL software On-Guard and hardware, panels and modules LNL1100, LNL1200, LNL1320 & LNL3300 etc. troubleshooting, teamwork, team leader, Hafele hardware dealing with other companies to end problems as Site Engineer, Training of students from King Abdulaziz University, CCTV software, Tetra software and FAS software
The responsible Engineer on the Data Center 2 at King Abdul-Aziz International Airport for related everything about SACS, MOB and Zone A
Working on the drawings and modification and Coordination with other companies-
Coordinate with Johnson Control Co. For installation some devices on the site.
HID Readers, Biometric Reader-
Preparing for the Mock-up with consultant-
Manage and follow up the technicians -
Working on the First Fix (Conduits, Junction Box- etc.) Second Fix(Cables Pulling/10core, 12core, 2core, 4core, 8core, RS485 cable) and Third Fix (Devices installation).
Secure Admin Lite software for Biometric Reader-
-Team Leader (Security Access Control Department)& TOCC Manager (Technical Operations Center).
- The responsible Engineer the Data Center 2 & MOB buildings for everything related to Security -Access Control (Administration, Alarm Monitoring, Map Designer)
Administrative work & Reporting -
Security Access Control System, from the top of a sophisticated architecture all the way to the bottom of it. That includes design, installations, coordination, integration, testing and
commissioning
LeneL
HID
BOSCH
HAFELE
TOCC Manager. Operation and Maintenance at the king Abdulaziz International Airport.
-Give the training and information about Access Control Systems to Civil Aviation Authority employees.
Support Engineer at the Al-Salam Palace (Royal Palaces)
Vedio analytic (CCTV software) DAVANTIS Co.
Sony Ipela SNC-VM 600 -Cameras.
Axis Communication (AXIS IP Utility -Cameras).
Genetec CCTV software .
LeneL Alarm monitoring & Map-Designer
الدعم الفني بشكل عام ومسؤول عن قسم تقنيه المعلومات
اصلاح اجهزة الحاسب لاوتنصيب البرامج للمستخدمين واصلاح الطابعات
ومتابعة ذلك بشكل مستمر
متابعه الشبكه
مهندس كهرباء مساعد ك مهندس موقع
in computer
Look at my work and achievements (university rate is not always a measure)..
URL removed due to policy violation. Please contact support for further information.