Planning and Scheduling Engineer
Sadara Chemical Company
Total years of experience :11 years, 6 Months
Supply Chain Department:
• Monitor, manage, maintain, issue and update production schedules and plans to balance
product supply and demand within the defined parameters for sourcing, production
sequencing and inventory levels.
• Set-up production schedules for polyethylene plants in OMP- Site Integrated Planning & Scheduling "SIPS" for both manufacturing and packaging center.
• Align with manufacturing the current plan and follow up in a daily basis to make sure the
plan is being executed in the right direction.
• Align with packaging center the execution plan and make sure they follow the plan.
• Align with road transportation team the lifting plan in a weekly basis to make sure produced products
are being lifted from packaging center safely with no issues.
• Minimize gaps between other teams by communicating more effectively and building
bridges between them.
• Follow up with every single sale order till it is being lifted.
• Monitor System cleanup for PEs to make sure the accuracy of MRP data.
• Update SIPS, SAP in a daily basis to make sure the accuracy of MRP data.
• Monitor and update sale orders status and make sure everything is being lifted as
planned.
• Communicate any changes in the plan to other teams to optimize the lifting.
• Train new team members and make sure they are ready to lead.
Planning Engineer, Project Control Dept. SADARA Project, Jubail
• Work under the direction of Project Control Manager to establish, maintain, and report on project progress and schedule.
• Communicate and review the contractor’s schedule and suggest changes/ improvements.
• Work with subcontractors and construction team to develop a realistic schedule.
• Conduct Two-Weeks look ahead meeting with subcontractors and construction team to review progress and achievements.
• Advise & update schedule status based on the actual progress.
• Collect the actual activity progress from the construction team and update in the tracking sheet.
• Advise & analyze the productivity of manpower.
• Direct evaluation of major construction activities.
• Submit daily progress and manpower reports to client.
• Prepare weekly and monthly progress reports of all quantity curves and progress curves include S-curve/Bar-chart, tracking sheet.
• Present project developments and achievements to management.
• Manage communication and provide efficient feedback between subcontractors and the construction team.
- Worked as a Field Engineer in the department of Drilling and Measurements as MWD-Field Engineer. Responsible for delivering high quality reports, programs our Measurements While Drilling tools & Logging While Drilling tools. Monitoring the drilling operations till reaching the planned target or the reservoir.
Field Engineer, Measurement While Drilling Dept. Dhahran
• Communicate tools preparation and client requirements to site.
• Arrange and inspect tools before sending to site.
• Preform calibrations and reprograming to all MWD tools.
• Communicate with the logistic team to deliver tools to site.
• Set up surface system includes unit, cables and sensors.
• Develop a plan from the beginning to the end of the job.
• Supervise and guide Rig crows to follow standards while assembling tools.
• Set up different computer programs to monitor all drilling activates.
• Communicate drilling processes with management and client.
• Deliver real time data to the client.
• Deliver daily reports that include surveys, current depth and remaining time to achieve the total depth.
• Deliver end of well report.
• Gain knowledge about transportation & mentored by skilled employee.
• Review and mentor final destinations to all trucks.
• Attend several meeting regarding shipment clarification .
GPA 3.06/4.00 Awards: Dean's List of Spring 2010 Dean's List of Summer 2011