Starting from Jan. 1995 till March 1998 i worked as an Engineer in the Steel Structure factory under direct supervision to a German Expert, i was reported to him, i was responsible for shop drawings, fabrication and installation of the STEEL factory.
From April 1998 till Dec. 2000: i worked as a site Engineer and construction manager to implement several projects like:
-Swimming Pool including its covering steel structure farme for PYRAMISA HOTEL at Sharm EL-Sheikh.
-Media production city at sixth of October city (civil and steel Work),
-Steel and wooden works for ORASCOM Company in the new building of AUC-New Cairo.
-PRODUCTION AND STORAGE HALLS for SANTAMORA FACTORY IN TENTH OF RAMADAN CITY (6000m2).
From Jan. 2001 till March 2010: i worked as a Project Manager to deliver the following projects:
Responsible for implementing:
-Space truss project for AIRKRAFT MUSEUM IN ALMAZA with area 8144 m2 including all civil works for the foundations and Columns.
-INTERTRADE factory in Tenth of Ramadan city, consists of (SPACE TRUSS WITH SPAN 60M, Area=3600m2, waffled slab 3600m2 with load capacity(1.0ton/m2 ) including finishing and Electromechanical works.
-Space truss for Travco Company in Sharm El Sheikh, including all civil works.
-Renovation the German Embassy in Cairo, including finishing, electromechanical modifications, wooden works, civil works, steel works and insulations.
-Swiss institute at Zamalek, New Building as an Extension of the existing one, including piles and raft foundation, all civil activities, finishing and electromechanical works, also renovation of the Existing Building.
-Complete demolish and Renovation of GIZ Head Offices at Zamalek.
-Renovation/modifications of the German Embassy and the Residence of German Ambassador in Algeria, for The German Foreign Ministry- (Civil, architectural, electromechanical works), including supervision of the German Sub-contractors for special activities. Consultant: KRV Buero in Germany, Client: Germany Foreign Ministry (Das deutsche Auswärtige Amt)
-TRAVCO Co. New storage building in Abu-Rawash, consists of 4 stories each 4150m2 including underground tanks.
-Nour El-Salam Palace House-in Aswan for Aghakhan Foundation-Area2000m2 Turnkey project
i would put only one project from the a.m projects under spot, this one is Implementation of the German Embassy and Residence of German Ambassador in ALGERIA, which need a real Self-motivated P.M and where the client was The German Foreign Ministry, and the General consultant was one of the biggest offices in Germany.
This project was Turn Key one, and we worked under stress because of the sensitive location and client of the project, as usual we were committed for time frame and Quality. i was responsible for coordinating between all Egyptian, German and Algerian subcontractors, also to order the required material (Purchasing Order Request) in the due time, where a lot of material has to be imported from Germany, which take an up normal time to be delivered to site.
For my company side, my first interest is to implement according to the budget plan, and to submit the claims in time to keep my company rights. This Project was one of most successful projects for all parties from all sides, therefore i am proud of implementing and delivering this special one.
- Company industry:
- Civil Engineering
- Job role:
-
Civil Engineering