Corrosion Engineer
PEMCO
Total years of experience :11 years, 4 Months
• Freelance: Cathodic protection systems design
• Freelance: Pressure vessels design calculations
• Freelance: Documents translation
•Check and approval of pressure vessels technical files
•Inspection and control of pressure vessels: Visual Inspection, guide waives, Hardness testing...
•Pipelines inspection
•Wetness of leak tests of pressure vessels and tanks
•Fitness for service (FFS) defect assessment
•Calculation of equipment’s remaining life
•Elaboration of Corrosion coupons handling procedure
•Corrosion coupons retry using Cosasco retrieval tool
•Elaboration of external corrosion direct assessment procedures: DCVG, CIPS, Pearson survey, AC Attenuation survey and cathodic protection components survey
•Elaboration of report templates
•Involved in STEG Gabes LPG station Major shut-down October - November 2015 as a position QC Engineer
•Engineering management of all Hasdrubal Asset’s CP systems (3 pipelines, underground piping system, aboveground storage tanks and underground bullets).
•Responsible engineer of integrity and corrosion projects: ECDA, Corrosion coupons and probes, corrosion investigations, coating repair…
•Preparation of project cards and cost estimation
•Preparation of computer application (Excel and VB) to estimate the wet H2S stress corrosion cracking risk
•Daily inspection work coordination
•Implantation of Risk Based Inspection System (RBI) for Hasdrubal asset
•Miskar-Asset Shut-down preparation: Report’s templates, Excel recording sheet, Inspection plan
•Involved in Miskar-Asset Major shut-down Mai 2016 as a position Data Coordinator
•Management of defects register and inspection plan.
•Check and approval of Written Scheme of Examination
Check and approval of pressure vessels technical files
•Inspection and control of pressure vessels: Visual Inspection, guide waives, Hardness testing...
•Pipelines inspection
•Wetness of leak tests of pressure vessels and tanks
•Fitness for service (FFS) defect assessment
•Calculation of equipment’s remaining life
•Elaboration of Corrosion coupons handling procedure
•Corrosion coupons retry using Cosasco retrieval tool
•Elaboration of external corrosion direct assessment procedures: DCVG, CIPS, Pearson survey, AC Attenuation survey and cathodic protection components survey
•Elaboration of report templates
•Involved in STEG Gabes LPG station Major shut
•Management, design and installation of sacrificial anodes cathodic protection systems (5 CP systems):
• Project tender preparation
• Specifications check
• Soil analysis
• Interference assessment
• Design of CP system
• Drawings preparation
• Negotiation with vendors
• Planning and management of execution tasks.
•Design of coating system with PU for the protection of ductile cast iron pipelines transporting potable water.
Elaboration of cathodic protection manual (Computer application) and design of ICCP system to protect pipeline (71km) carrying oil.
After succeed in the preparatory phase, I joined the national college of engineers Sfax where I was graduated as a materials engineer. Material engineering include metals, plastics, composites and ceramics material. we learned the elaboration and manufacturing of each kind of this materials. My final project was the elaboration of a manual of cathodic protection system and deign of ICCP system to protect 71 km pipeline.