Santosh Shukla, Asst Chief Engineer

Santosh Shukla

Asst Chief Engineer

Hilton

Location
India - Ahmedabad
Education
Bachelor's degree, Electrical Engineering
Experience
18 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 3 Months

Asst Chief Engineer at Hilton
  • Qatar - Doha
  • October 2019 to June 2020

● Did the inspections of the installed MEP systems and slide structures at Water Park and created requirements to comply international standards for installation, operations and maintenance.
● Review T&C Procedures and handover documents for the equipment to comply with best international standards and engineering practice.
● As client representative witness third party Inspections and handovers of the property from main contractor water park and Hotel. Property having equipment including but not limited to Trane make chillers 400 Tons Air cooled, Carrier make 2000 Tons Chillers water cooled, Trane make heat pumps, Edwards Fire Alarm system, kitchen equipment, White water slides, Murphy wave generation units, surfing and water treatment systems with chemical dosing systems.
● Responsible and accountable for taking handover the equipment and further operation & maintenance.
● Accomplished recruitment plan of the maintenance team and Standard training plans for the team.
● Created all the required SOPs, PPM, risk assessments and maintenance policies & procedures.
● Pre-opening procurement for the complete resorts, hotel, Adventure Park and Water Park.

  • November 2018 to May 2019

Shankus Water World and Resorts
As HOD Maintenance and Engineering
•Review and modify the project design to comply with International Safety standards for swimming pool, water slides and Facilities.
•Establish project execution schedule and do the measurement & report of the project progress.
•Compare the actual work done against planned work to determine the effect on the completion with corrective action plan.
•Update the project schedule with all change management.
•Technical and commercial Negotiations with water park equipment suppliers.
•Done Erection & Commissioning of the water park systems.
•Done the trainings for the operations of the water park systems.
•Prepare PPM schedule for the Water Park and facilities equipment as per supplier O&M.
•Prepare maintenance procedure and risk assessment for all the maintenance activity.
•Responsible for all the pre-opening procurement for the maintenance operation.
•Responsible for the recruitment of the maintenance department

Electrical Maintenance Manager at LEGOLAND Dubai
  • United Arab Emirates - Dubai
  • January 2016 to October 2018

● Review design drawings and raise design discrepancies through the project control software (PMweb) and make sure all modification has been implemented before opening.
● Assist LEGOLAND project delivery managers to resolve all the technical issues related water sides, rides, MEP& Aquatics.
● Coordinate with the suppliers and TUV team to make sure that all the slide, rides and attractions are complying with international and local safety standards.
● Done the commissioning of the water park, theme park and Facilities system commissioning including but not limited to Zierer make lift coaster, Zamperla mini coaster, Mace make technic twister/tea cup, dark ride with Legotronics animations and sea water submerge coaster, S&S make beetal bounce, merry-go-round caterpillar ride, white water slides, Simplex fire alarm system, Kitchen equipment, firefighting system, Life support system for sea water aquarium and all the MEPs.
● Plan and executed water park and theme park pre-opening activities.
● Created the entire preventive maintenance checklist as per manufacture recommendation for the equipment, ride, attractions, slides and facilities.
● Done the risk assessment for the all the preventive maintenance check lists.
● Created SOPs for all the preventive maintenance and other activities in the maintenance department.
● Involved for all pre-opening purchase planning for LEGOLAND Dubai.

Systems Engineer at Farah Experiences LLC
  • India
  • July 2013 to July 2015

Responsible and accountable for the electrical control systems and automation systems of the ride, slide, attractions and Water quality systems.
•Maintaining the ride and attractions safety systems as per supplier and international safety standards.
•Oversee the preventive maintenance of MV and LV switchgears.
•Involved in spare parts planning & inventory control.
•Providing predictive and proactive maintenance to optimize availability & reliability of the ride and attractions.
•Oversee the preventive maintenance to ensure the efficient operations & availability of the ride and attractions.
•Responsible to reduce the downtime and maintenance cost on the ride and attractions.
•Responsible for entire project close out activity pertaining to the electrical system and BMS systems.
•Identifying the possible software and operational weakness of the ride and attractions safety system and do the modification to optimize the ride safety.
•Lead the root cause analysis process and reduce the down time.
•Provide the technical base trainings to front line colleagues.
•Provide the technical support to maintenance managers

Lead Technician at Sohar Aluminum LLC
  • October 2008 to June 2013

CARBON PLANT)
Job Profile:
•Execute the preventive maintenance and provide suggestions for optimize the OEE for Carbon Plant Equipment.
•Prioritize, Plan & schedule the work activities during the shift duty in Carbon plant.
•Complete the documentation for the entire jobs on daily basis in the CMMS (SAP).
•Perform the calibrations on the field instruments and update the related records.
•Troubleshoot in the control systems of the carbon plant equipment like NKM & ECL Make EOT cranes, Kempe make Material Handling Equipment, Innovatherm make heating and cooling ramps, Solis Make Paste Plant equipment, Power & Free Conveyors, Outokumpu make Rodding Shop Equipment, Solis Make FTC equipment, Allen Bradley control logix 5000 PLCs, VFDs, Hydraulic Equipment.
•Initiate the root cause analysis and reduce the break down technically.
•Do the modifications in control systems and equipments to reduce breakdowns and increase Safety integrity level.
•Make sure critical spare parts are available in warehouse.
•Follow all the safety procedure and report all the near miss

Electrical Commissioning Engineer
  • April 2008 to October 2008

CRUDE PLANT)
Job Profile:
•Client facing commissioning electrical engineer involved to provide technical expertise in field of construction and assure the project are always in line with client specifications and standard.
•Prepare method of statements for the testing & commissioning of the electrical equipment.
•Execute the testing and commissioning and complete related documentations.
•Coordinate with the client for engineering issues and material approvals.
•Identifying and resolve the technical discrepancies in the original design proposals during commissioning.
•Ensure the safety procedures are adhered during the job executions by sub- contractor workers and supervisors.
•Weekly update the project status in terms of achieved planned deliverables and upcoming challenges

Technician Engineer at Birla Copper (Hindalco Industries)
  • India - Bharuch
  • August 2003 to April 2008

•Execute the Preventive maintenance of electrical equipment for 75 MW captive power plants and 220KV switch yard.
•Execute the Preventive maintenance of the switchgears for the 11 KV sub-station.
•Execute the preventive maintenance of H.V. & L.V motors, UPS, Capacitor banks, Earthing system and General Lighting.
•Follow the safety rules and regulations during the execution of the job.
•Involved in the new water treatment project as a

at Ahmedabad Electricity Company (Torrent Power)
  • January 2001 to January 2002

Apprenticeship
Job Profile:
•On Job training (High voltage Substation, Circuit breaker, transformer and various power equipment )

site Supervisor at Balmaya Engineers
  • India - Ahmedabad
  • January 2000 to December 2000

Responsible for Diesel Generators set (2MVA) operation and maintenance.

Education

Bachelor's degree, Electrical Engineering
  • at IIMTS
  • June 2021
Master's degree, Maintenance Management
  • at INDIAN INSTITUTE OF BUSINESS AND MANAGEMENT STUDIES
  • June 2012
Diploma, Electrical Engineering
  • at Gujarat Technological University
  • October 2000

Frequency Counter

Specialties & Skills

Conveyors
SAP ERP
Maintenance Management
Plant Commissioning
Project close out
Chillers and Heat pumps
CUSTOMER RELATIONS
RECRUITING
RISK ASSESSMENT
SWITCHES
AUTOMATION
DELIVERY
DOCUMENTATION
INVENTORY MANAGEMENT
LIGHTING
Facilities Management
Budget Management

Social Profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.

Languages

English
Expert
Arabic
Beginner

Training and Certifications

CPO (Certificate)
Date Attended:
December 2016

Hobbies

  • Playing Football and Cricket