Work Experience

Total years of experience :22 years, 7 Months

Principal Water Engineer (Group Leader) at AAW CONSULTING ENGINEERS
  • Egypt - Cairo
  • My current job since October 2013

As principal water design engineer at AAW CONSULTING ENGINEERS dealing with different projects located on Egypt, Sultanate of Oman, Qatar and Kingdom of Saudi Arabia, I am responsible for the followings:-
 Planning and design of water supply system, water distribution system, landscape irrigation system, sewerage collection and conveyance system, pumping stations, reservoirs and other facilities.
 Manage and review the production of analysis, designs and tender documents, including drawings, technical Specifications, bill of quantities and design reports relating to projects.
 Manage a team of junior engineers and draftsmen and follow up the work progress.
 Provide technical advice to project team members with regards to hydraulic design, design software and all other aspects related to the project.
 Co-ordinate with other design disciplines to ensure the integrity of the overall design.
 Liaise with the project manager during weekly projects progress meeting to keep him informed of all developments associated with the project.
 Liaise with the client to discuss all the comments received during project phases and to solve all the projects technical queries.

The following are the list of Projects:-
PROJECT: CENTRAL REGION HOUSING PROJECT
LOCATION: CENTRAL REGION - KINGDOM OF SAUDI ARABIA
CLIENT: MINISTRY OF HOUSING
The scope of work is to design landscape irrigation system, potable water system and sanitary sewer system. The total project area is 10 million square meters consists of 23 sites at different location.

PROJECT: LIWA HOUSING PROJECT
LOCATION: WILAYAT LIWA- SULTANATE OF OMAN
CLIENT: MINISTRY OF HOUSING
The scope of work is to design landscape irrigation system, potable water system and sanitary sewer system. The total project area is 8.7 million square meters. The design include hydraulic analysis, water hammer analysis for transmission pipeline, prepare for BOQ, specifications

PROJECT: DAHIAT SUMOU PROJECT
LOCATION: MAKKA - KINGDOM OF SAUDI ARABIA
CLIENT: MOHAMMED MANSOUR AL-BASSIMI GROUP
The scope of work is to design landscape irrigation system, potable water system. The total project area is 1.6 million square meters.

Senior Water & Wastewater Design Engineer at SAUDI CONSULTING SERVICES (SAUDCONSULT)
  • Saudi Arabia - Riyadh
  • August 2007 to August 2013

Throughout my work in SAUDI CONSULTING SERVICES (SAUDCONSULT), I worked as a senior design engineer for site development projects related to Potable Water Systems, Sewerage Systems and Landscape Irrigation Water Systems for the Royal commission for Jubail and Yanbu. Also, I am responsible for coordinating with all other utilities on the assigned projects.
The following are some of projects which I worked on:-
PROJECT: KING ABDULLAH ECONOMIC CITY (INDUSTRIAL VALLEY), PHASE-1B
LOCATION: JIDDAH
CLIENT: EMMAR
The scope of work is to design landscape irrigation system and sanitary sewer system to facilitate the ongoing development within King Abdullah Economic City (Industrial Valley), Phase-1B (KAEC).
PROJECT: EARLY INFRASTRUCTURE WORKS PROJECT
LOCATION: RAS AL KHAIR MINERALS INDUSTRIAL CITY
CLIENT: ROYAL COMMISSION FOR JUBAIL AND YANBU (RC)
The scope of work is to design transmission lines for Potable water system and sanitary sewer system to facilitate the ongoing development within Ras Al Khair Minerals Industrial City (RAKMIC) The total length of potable water lines are 19 km and the total length of sanitary force mains are 12 km with three sanitary wastewater lift stations.

PROJECT: DESIGN CONSULTANCY WORK SIPCHEM HOME OWNERSHIP PROJECT
LOCATION: JUBAIL INDUSTRIAL CITY
CLIENT: SAUDI INTERNATIONAL PETROCHEMICAL COMPANY (SIPCHEM)
The scope of work is to design secondary and tertiary potable water system and sanitary sewer system for sector A4-8 and connect it the existing interface points. Total length of potable water network is 7.44 km and pipes diameter varies from 50 mm to 200 mm. Total length of sanitary sewer network is 4.76 km and pipes varies from 160 mm to 315 mm.

PROJECT: DESIGN OF INFRASTRUCTURE FOR DIFFERENT SECTORS IN HAII JALMUDAH
LOCATION: JUBAIL INDUSTRIAL CITY
CLIENT: SAUDI BASIC INDUSTRIES CORPORATION (SABIC)
Design secondary and tertiary potable water system for the following sectors A3-1, A3-3, A4-1, A4-3, A4-5, A4-6 and A4-11 using Watercad software. Total length of the network is 31 km and pipes diameter varies from 63 mm to 200 mm.
PROJECT: SITE DEVELOPMENT OF LABOUR CAMP
LOCATION: JUBAIL INDUSTRIAL CITY
CLIENT: ROYAL COMMISSION FOR JUBAIL AND YANBU (RC)
Design primary and secondary networks for sanitary and potable water systems. Design one tertiary lift station (Capacity of 185 l/sec). The design includes preparing systems layouts, profiles, standard details, sizing the wet well and force main for the tertiary pump station, and design calculation sheets. Project area is 1.2 Km2. Total Length of sanitary sewer is 6 km and pipes diameter varies from 160 mm to 600 mm. Total length of potable water network is 7.7 km and pipes diameter varies from 250 mm to 450 mm.

PROJECT: SITE DEVELOPMENT OF AL-MUTRAFIAH DISTRICT
LOCATION: JUBAIL INDUSTRIAL CITY
CLIENT: ROYAL COMMISSION FOR JUBAIL AND YANBU (RC)
Prepare the master plan of potable water and sanitary networks for Al-Mutrafiah district (Sectors F1, F2, F3 and F4). Design Main potable water network for the district using Watercad software. The Length of potable water network is 21 Km and pipes diameter varies from 300 mm to 800 mm. Design primary; secondary and tertiary water supply and sanitary networks for sector F2 at Al-Mutraifah district. The design includes preparing systems layouts, profiles, standard details, and design calculation sheets. The project area is 2.55 Km2. Total length of potable water network for sector F2 is 47.60 km and pipes diameter varies from 75 mm to 250 mm. Total length of sanitary sewers is 25.70 km and pipes diameter varies from 160 mm to 600 mm. Design two sanitary lift stations one to take load of sector F2 with flow of 172 l/sec and the second one to take load of Al- Mutrafiah district with flow of 654 l/sec.
PROJECT: KING ABDULLAH ECONOMIC CITY
CLIENT: EMMAR
Design of Transmission Irrigation Line for King Abdullah Economic City (26Km) using watercad.

Junior Water & Wastewater Design Engineer at KHALIFA CONSULTING ENGINEERS
  • Egypt - Cairo
  • August 2001 to August 2007

Design engineer for water networks using Watercad software since 7 years with KHALIFA CONSULTING ENGINEERS (KCE), in Egypt. Design sanitary sewage networks for some projects in Egypt. Assist in the hydraulic and environmental design of water and wastewater treatment plants in Egypt.

I worked for the following List of Projects:-
KOM HAMADA DRINKING WATER NETWORK
CLIENT: EGYPTIAN NATIONAL AUTHORITY FOR DRINKING WATER AND SEWERAGE SYSTEM
Design primary and secondary drinking water systems. The project aims to provide drinking water for 21 villages. The design includes providing layouts, profiles, intersection details and standard details. The total length of drinking water network is 65 km (38 km for primary system and 27 km for secondary system).

MONOFIA DRINKING WATER NETWORK
CLIENT: EGYPTIAN NATIONAL AUTHORITY FOR DRINKING WATER AND SEWERAGE SYSTEM
Design primary and secondary drinking water systems. The project aims to provide drinking water for 10 villages. The design includes providing layouts, profiles, intersection details and standard details.

ATFEAH CITY
CLIENT: EGYPTIAN NATIONAL AUTHORITY FOR DRINKING WATER AND SEWERAGE SYSTEM
The project aims to provide ATFEAH city and nearby villages and cities with pure drinking water. Participate in the design of water purification plant with capacity of 1400 liter /sec in two phases. The design includes design of intake pipes, raw water pumps, raw water sump, distribution shaft, flash mixing tanks, Clariflocculators, filters, ground tank, filtered water pumps, filtered water sump and chlorination tanks. Design primary drinking water system for 23 city and village nearby ATFEAH city. The design includes providing layouts, profiles, intersection details and standard details. The total length of drinking water network is 54.8 km and pip sizes ranges from 160 mm to 1200 mm. Design of three elevated tanks each tank with capacity of 1000 m3.

SADAT CITY
CLIENT: EGYPTIAN NATIONAL AUTHORITY FOR DRINKING WATER AND SEWERAGE SYSTEM
Design drinking water system for some areas in SADAT CITY, Hydraulic design and sizing of two elevated tanks.

GREENBELT OF THE 88 FEDDAN

The project aims to provide irrigation water for 88 FEDDAN. Hydraulic design of irrigation networks using Watercad software.

GREENBELT OF THE 6th OCTOBER CITY

Hydraulic design of irrigation networks using Watercad software.

Education

Master's degree, Hydraulics
  • at Faculty of Engineering - Ain Shams University
  • December 2006
Bachelor's degree, Civil Engineering
  • at Faculty of Engineering - Tanta University
  • June 2000

Specialties & Skills

Wastewater Network Design
Water Hammer Analyss
Irrigation Design
Water Supply
Water Distribution
Sewercad Software
Bentely Hammer Software
Watercad Software
Flowmaster Software
Autocad Software
Raincad Software
Office Software

Languages

Arabic
Expert
English
Intermediate

Memberships

Member of Saudi Council of Engineers
  • Member
  • August 2011
Member of Egyptian Engineering Syndicate
  • Member
  • June 2000

Training and Certifications

Internal Quailty Auditing (Certificate)
Date Attended:
February 2008
Valid Until:
January 9999
English Language Level IV (Training)
Training Institute:
AMIDEAST, Egypt
Date Attended:
February 2005
Duration:
120 hours