sayed Khedr, Technical Support executive - machines operation & maintenance techniques & Professional Trainer

sayed Khedr

Technical Support executive - machines operation & maintenance techniques & Professional Trainer

Building Material Technology Centers

Location
Egypt - Cairo
Education
Bachelor's degree, Mechanical power
Experience
19 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 8 Months

Technical Support executive - machines operation & maintenance techniques & Professional Trainer at Building Material Technology Centers
  • Egypt - Cairo
  • My current job since January 2006

(1) Is responsible for achieving the key Performance Indicators KPI‘S of the centers every month,
(2) Conducting vocational & field in-house training by the industry to upgrade the skills of engineers & technicians working in marble & granite processing facilities,
(3) Conducting in-house establishing machines Preventive Maintenance Program,
(4) Conducting in-house Technical support and a problem solving methodology for the production and machines problems in terms of :
• Guide to optimum selection of in-coming material from raw material and spare parts in view of durability requirements, material specifications, machine characteristics, production rate & quality
• Quality tools Troubleshooting & Problem solving

Factory manager at Sarhan Co. for marble & granite - Cairo - Egypt
  • Egypt - Cairo
  • March 2012 to September 2012

Part time job
• Principle Accountabilities
- Establish maintenace system
- Establish production system
• The activities in the following areas:
- Where the factory was poor data so activated Iso documents to able to collect data and measure efficiency of machines and production,
- monitored and inspected work in progress to identify optimum productivity for each process,
- monitored and inspected maintenance departement activities to define the actual needs,
- Analyzed monthly data in meetings with production and maintenance team,
- Prepare and maintain production and maintenance reports and personnel records,
- Support the Business Teams by meeting (as required) to clear the situation of machines and production efficiency.
• Impact:
- Established organization structure,
- Seted up plan for production per order,
- Reduced production rejects by 60% by changed supplier of raw material,
- Developed new system for processes to increase accuracy of calculation of waste,
- Identifyed and determined causes of deviations from planned productivity and actual productivity,
- provided root cause analysis for machinery and production problems and solutions for improvements,
- Provided guidance and direction in lubrecation map for machines
- maintenance history file for each machine including cataluge, history pf problems, spare parts, monthly report
- Prepared the monthly preventive maintenance plan by coordination with production planning department,
- Prepared plan and list for the required spare parts ( foreign and local ) for all machines and execute the plan according to the approved budget.

• Maintenance manager at International Co. for marble & granite - Cairo - Egypt
  • Egypt
  • May 2009 to December 2010

Part time job
The roles are responsible for ensuring maintenance works are the most efficient and ensure production meets planned objectives.
• The activities in the following areas:
- Scanning the factory and analyzing the collected data to define the actual needs,
- Set up maintenance action plan for machines and ensure work is carried out to set plan,
- Collecting data to calculate the efficiency of machines and the economical impact and to develop the action plan,
- Following up the progress monthly and holding meetings to solve any problems,
- Establish priorities for repairing depends on criticality of machine.
• Impact:
- Established a data base for every plant to help them view and calculate all the engineering data,
- Supported the factory with training of the stuff to utilize problem solving techniques,
- Assisted the maintenance stuff to realize the importance, the economical impact of proactive maintenance, resource management and time management.
- Increased the life time of the spare parts so decreased the value of the spare parts stock.
- Reduced the sudden breakdowns of 6 hrs per day for 8 machine to 1 hr per day means a lot of saving.

Maintenance Engineer at SEVEN Engineers Co.- Cairo - Egypt
  • Egypt - Cairo
  • September 2004 to December 2005

maintenance manager who has supervised and participated in maintenance projects at all stages and phases.

Education

Bachelor's degree, Mechanical power
  • at Cairo University
  • May 2003

Specialties & Skills

Production Management
Technical Support
Technical Trainer
technical skills

Languages

English
Expert
Arabic
Expert

Memberships

Egyptian Syndicate of engineers
  • mechanical
  • May 2003

Training and Certifications

Total Project Management (Training)
Training Institute:
AUC American University in Cairo
Date Attended:
April 2007
saving energy techniques in ceramic (Training)
Training Institute:
Keramic institute- Germany
Date Attended:
June 2010
5S Housekeeping Technique (Training)
Training Institute:
Engizer Malaysia .BHD.sdn
Date Attended:
June 2008
problem solving techniques and maintenance management (Training)
Training Institute:
Autokeen Malaysia Car manufacturing
Date Attended:
July 2008
System Development for Small Medium Enterprises (SME) (Training)
Training Institute:
Malaysia Productivity Cooperation
Date Attended:
May 2008
Water utility & Waste water pump (Training)
Training Institute:
Grundfos Egypt
Date Attended:
December 2011
Planning For Engineers (Training)
Training Institute:
AUC American University in Cairo
Date Attended:
June 2007