Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

selvakumar mohanadoss

Senior construction engineer

Worely parsons

Location:
Qatar - Doha
Education:
Bachelor's degree, mechanical engineering
Experience:
20 years, 3 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  20 Years, 3 Months   

April 2017 To Present

Senior construction engineer

at Worely parsons
Location : Qatar - Doha
PROJECTS UNDERTAKEN
Client
(North oil company) Project details
NOC BD-16 CONVERSION TO A PRODUCER ON BD PLATFORM
NOC NEW INFILL WELLS AND FIVE NEW INFILL PRODUCER WELLS ON DA PLATFORM
NOC EA-11 LIKE FOR LIKE FLOWLINE REPLACEMENT
NOC CONVERSION TO TEMPORARY CONVERSION TO TEMPORARY
PRODUCER AND WATER INJECTOR
NOC FA-31 AND FA-10 NEW INFILL WELLS
NOC CA‐12 CONVERSION TO WATER injector
NOC INLET AIR FILTER SYSTEM REPLACEMENT FOR LP/HP GAS TURBINES
NOC BD INFILL WELLS - NEW SCHLUMBERGER DHG UNIT
NOC HOOK UP SURVEY
NOC FA & CD DRILLING RIG TIE‐INS
NOC ED FIRE WATER CAISSONS V-0311 & V-0321 - SUBSEA CLAMP INSTALLATION
NOC DELUGE VALVE DELUGE VALVE REPLACEMENT AND DELUGE OVERBOARD DUMP LINE
NOC ED FIRE WATER CAISSONS V-0311 & V-0321 PERMANENT DEAD WEIGHT SUPPORTS

• Oversee all aspects of construction within the offshore gas pipeline projects.
• Ensure all relevant resources are applied to meet project needs within the core groups.
• Provide constructability input into all project design work.
• Support and promote cost reduction and other project construction deliverables.
• Prepared Survey reports checklist , constructability review report and constructability check list
• Coordinate and supervise the application of the communications procedure and other project procedures.
• Supports the Project Manager during the handover of the project to the O&M contractor.
November 2013 To February 2016

New construction surveyor

at American Bureau of shipping
Location : China
Key Result Areas:
 Survey this type of new building according to ABS rules and statutory requirement as SOLAS, Load line, and MARPOL etc.
 Review, witness and approve the WPS and repair procedure (including mechanical tests, NDT) which was applied on this construction according with TOTAL specification, AWS D1.1., ASME IX, ASME B 31.1 and ABS rules.
 review the construction DWG, NDT plans, tank test plans, visual inspection for welding, block assembly, pre-erection and erection inspection according with construction drawings
 Witness and issue the certificate for welder’s qualification (visual inspection, mechanical test and NDT review). Control the WPS applied in production, conform the all welders use in production are qualified, material traceability, identification of welding consumable used according with WPS, review the NDT report, witness to NDT (UT, MPI, PT).
 Survey the topside module for structure and piping installation, inspection for PFP, hydro-test and installation of piping
 Prepared Survey reports and closely working with AC Generator Diesel Engine, Main Engine and Auxiliary System
 Assessed work measurement which was the amount of the work required for a project
 Compiled daily activity report and monthly progress report
 Coordinate with Piping Supervisors / sub-contractors / workers for the equipment and materials.
 Issue materials according to requirements and Company’s procedures.
 Keep proper records of inventory list at all times.
 REQUIREMENTS
 Hands on experience in FPSO Topside module and process piping installation work.
 Piping field weld and shop weld
 Piping isometric, piping installation sequence, hydro test/flushing method, piping reinstatement process, piping preservation, piping welding WPS, PQR, etc.
 Piping manpower loading, piping KPI monitoring process
 working knowledge of Insulation hot and cold works
 Reviewed engineering drawings, layouts, diagrams, technical specifications and cost estimates of the organization
Significant Accomplishments:
 Played a major role in taking quality management measures to conclude projects on time Resolved major drawing and issues
 Successfully executed key projects such as Petro Bras, Ensco and overcame quality challenges
 Received several appreciations from clients for COSCO and Cscc shipyard
April 2004 To July 2012

construction engineer

at Trags
Location : Other
Responsibility and nature of work: Piping fabrication & installation
❖ General surveillance on carbon and stainless steel pipe fabrications, installation, dimensional and orientation checks, transfer verification of heat numbers on pipe sections before cutting. Logged heat numbers of fittings and piping on shop fabrication drawing for shop or on board before welding. Inspections of welds and signing off QA and owner representative.

Commissioning
.❖ Coordinate with the vendors on Installation & Inspection of Derrick Mounted vertical Pipe Handling equipment's during the Derrick assembly and targeting to complete before the complete installation of the Derrick.
❖ Coordinating with Vendors for on Time delivery of Drilling Equipment's.
❖ Liaise with Engineering Team on the design issues during the Installation of Pipe lines and equipment on the drill floor and other drilling systems.
❖ Ensure the piping and mechanical completion and commissioning of Mud Supercharging Pumps, Mud Pumps, Stand Pipe Manifold, C&K Manifold, Cement Manifold, Derrick Stand pipe & goose necks with tech drill
❖ Coordination & conduction of Mechanical completion activities of Draw works, Draw works Braking system such as Disk Brake system
❖ The time & cost parameters and effective resource utilization to maximize the output.
❖ Commissioning and running of various equipment's as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities & Oil Rigs
❖ Supervising of 2 lakhs dia inch spool fabrication and installation scope of work
❖ Prepare work schedules, plans, Monitor and report progress and delays and raised Technical Query to client engineering
❖ To coordinate with sub-contractor and other discipline supervisor (scaffolding, painting and insulation)
❖ To carry out line checks and punch listing.
February 2008 To July 2012

Senior officer piping

at Keppel fels
Location : Singapore
Trags Mechanical Engineer From mar 2012 To till date To jan 2012 Qatar Pmp Offshore
Keppel fels Senior officer piping From Feb 2008 To jan 2012 Singapore /Indonesia Bintan offshore
March 2006 To June 2007

Site supervisor

at Galadari engineering works ltd
Location : United Arab Emirates
Galadari engineering works ltd Site supervisor From MAR 2006 To JUNE 2007 Dubai
March 2006 To June 2007

site supervisor

at Galadari engineering works ltd
Location : United Arab Emirates
Previous employment 2: Worked as a site supervisor in Galadari engineering works ltd LLC PO BOX 138 Dubai, UAE. During March 2006 to June 2007
Galadari is main contractor for power plant. Installation heavy rotating equipment's like boiler, turbine, condenser, water treatment plant, fuel handling system, ash handling, fresh water line, and steam line piping installation
Project Involved: 2 No's
200 mw power plant in Saud bawan group, Oman
180 mw power plant in Abu Dhabi electrical board, Dubai
Responsibility and nature of work: ❖ MIR inspection on material and equipment's comes to the site as per owner's spec. and standards verification of material as per mill and test certificate.
❖ To do M.V.R on material to make sure the material tally with the mill certificate and also to check dimension as per approved drawing before cutting.
❖ Ensure equipment foundation as per equipment's base plate dimension
❖ To conduct W.Q.T as per code and standard (AWS D1.1) Fit-up inspection prior to welding leveling and dimensional inspection before and after welding.
❖ Supervising of welders/welding operators and fitters in pipe installation, equipment support installation and equipment foundations modifications
❖ To prepare request for non-destructive testing to mark out weldment repair location after receiving NDT report and Final documentations. Load out and tie down inspection
❖ Co-ordination with client, subcontractor for clearing punch lists of various phases.
❖ Co-ordination with the client, subcontractor and quality department for inspection activities as per the ITP.
❖ Co-ordination with client, subcontractor, safety and pre-commissioning departments for the commissioning activities and mechanical clearance.
❖ Co-ordination with client, subcontractor, safety and pre-commissioning departments for Tie-in works.
❖ Co-ordination with Field engineering for the field
June 2004 To February 2006

Site engineer

at E.I.D parry (India) ltd
Location : India
E.I.D parry (India) ltd Site engineer From June 2004 To Feb 2006 Pudukkottai


Current employment
Working as a mechanical engineer (piping)
Trags, Doha. Qatar
TRAGS has grown to become one of the largest specialized industrial services company in the State of Qatar. With trained, certified, experienced personnel, TRAGS has the capacity and expertise needed to meet the client's every service requirement on time and on budget.

Number of projects: 2
1. Qatar Gas 2 Pmp offshore tie in two wells
(Shut down, pre shut down and post shut down scope)
2. Qatar Gas 2 Replacement of De-oiled caisson U-T5400

Responsibility and nature of work: ❖ Carry out site survey to verify the existing conditions.
❖ Verify availability and adequacy of all required utilities and services.
❖ Retrieve and verify accuracy of all relevant existing drawings and documents to the work.
❖ Generate site survey report.
❖ Responsible for piping fabrication, installation and testing.
❖ Carry out the pre-fabrication of piping spools at workshop in order to minimize hot work at site as per the approved drawings.
❖ Provide tags with spools numbers for all the fabricated piping spools for easy identification while erection.
❖ Fabrication of all pipe spools shall conform to the requirements of Qatar gas standards & specifications.
❖ Responsible for proper identification of correct material during fabrication item no will be provided as per drawings.
❖ Mobilize the indirect and direct manpower and tools and tackles required.
❖ Ensure availability all the piping fittings, gaskets stud bolts & nuts.
❖ Carry out the torqueing for the entire tie in as per approved procedure.
❖ Operation of X-mas Tree Gate valves, Swab/crown, upper master, lower master, wing valves (operating & closing), surface safety valve, adjustable choke valve, and SSV/shut down valve SDV.
❖ Choke Manifold, upstream, by-pass positive choke valve, and Adjustable choke valve and down changing of chokes.
❖ Oil & Gas pipe manifold-port side or starboard side valves.
❖ Knowledge on flow lines, work of separator, conditions of test, production separator, 3 phase (Gas, oil & water) separator, Pressure Control Valve PCV, oil level controller, gas pressure controller, changing of orifice plates, taking separator reading, flowing well fluid through separator, bypassing opening and closing of manual low torque valves
June 2004 To February 2006

site engineer

at E.I.D parry (India) ltd
Location : India
Worked as a site engineer in E.I.D parry (India) ltd, pudukkottai, India. During June 2004 to Feb 2006
EID parry is leading sugar industry in India. Involved sugar process, co-generation and molasses process, sewage treatment.
Project involved: 2 no's 1.3000 TCD plant expansions 2.18 Mw power generations
Responsibility and nature of work: ❖ Job stepping, estimating and planning sequence of rotating equipment's, connection piping and commissioning
❖ Coordinating NDT, insulation, scaffolding and painting requirements with subcontract supervision.
❖ Ensuring "As Built" drawings, Weld Maps and engineering changes are documented / recorded.
❖ Attending weekly production meetings with the client and subcontractors.
❖ Employed as part of the core team to carry out furnace retubes, stat outages, services and emergent work.
❖ Removing / replacing pipe work and equipment to allow furnace tube elements to be renewed.

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
January 2004

Bachelor's degree, mechanical engineering

at shanmugha collage of engineering
Location : India - Chennai
Grade: 64.5 out of 100
❖ Bachelor of mechanical engineering first class 2004
January 2004

Bachelor's degree, mechanical engineering

at shanugha collage of engineering
Location : India - Chennai
Grade: 64.5 out of 100
❖ Diploma in mechanical engineering first class with honour's 2001
❖ H2S and Gas Test
❖ Sea Survival
❖ HUET

Specialties & Skills

FABRICATION

INSPECTION

NON-DESTRUCTIVE

OFFSHORE

PAINTING

Shipbuilding

Oil and Gas

Offshore

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

Hindi

Beginner

Malayalam

Beginner

English

Expert

Tamil

Expert

Chinese

Intermediate

Loading
Loading...
Loading...