seraj anwar sanwar, Senior Electrical Engineer

seraj anwar sanwar

Senior Electrical Engineer

SSEM

Location
India - Delhi
Education
Bachelor's degree, Electrical
Experience
13 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 10 Months

Senior Electrical Engineer at SSEM
  • Saudi Arabia - Jeddah
  • My current job since October 2019

 Oversee the electrical work at construction site, resolving issues and ensuring that work is completed according to specification.
 Provide engineering and technical input to site team to proceed with the construction activities without any interruption.
 Manage the site team of contractor and sub-contractor.
 Resolve the issues related to electrical system or devices that arise during the course of construction.
 Changes to a site design or practical concerns may result in existing electrical plans and blue prints no longer being viable or specification may change requiring a different power configuration.
 Manage construction schedules related to electrical equipment installation at site.
 Attend construction meetings to resolving any execution and client issues.
 Organized weekly toolbox talk to subcontractor and minimize discrepancy to reduce the re-work.
 Project Highlights:
 Co-ordination with ABB team to install 380KV GIS & 380/110 KV GIS Substation.
 Installation and termination of different types of panels including LCC panel, control & protection panel, AC& DC panels, communication panel, SAS panels, OLP and ILP panels etc.
 Installation & testing of Battery Bank, Battery charger.
 Installation & Termination of 120 MVA Transformer & station transformer.
 Installation of substation Earthing systems.

Electrical Engineer at Consolidated Contractors Company(CCC) - Kuwait
  • Kuwait - Al Ahmadi
  • March 2018 to August 2019

 Responsible for all the Electrical activities in ARDS ( Atmospheric Residue Desulphurization ) unit, quality checks, verification of engineering drawing and documents, ensuring the site installation as per latest approved AFC and typical installation details.
 Responsible for HV, MV and LV cable pulling, Glanding and Termination, Hi pot Testing, IR testing and RFI activities.
 Fibre optic cable pulling, testing coordination, RFI activities and close out.
 MV motor testing, phase sequence test and cable termination activities.
 Installation of cable trays, lighting fixtures and supports, power junction box and sockets, lighting junction boxes, local control panel, safety switches, RCU etc.
 Responsible for preparation for complete circuit for enersization of lights in plant.
 Installation of earthing system in plant and testing of earthing Pit.
 Coordination with other departments in order to execute the work on priority basis to avoid rework.

Electrical Project Engineer at Afaq Al Musana llc (oman)
  • Oman - Sohar
  • February 2016 to July 2017

 Check and review the drawings and specification, prepare planning schedule associated with the project and monitor electrical contract works.
 Plan and schedule projects, estimate time and materials, supervise subordinates, maintain records and files.
 To prepare Daily and Monthly progress report, Forth Night report, minutes of meeting and keep the record.
 Regular follow-up with Consultant for Approval of Material Submittals, Method statements, Drawings & Layouts, etc.
 Interaction with Vendors & Suppliers for their quotations, Base design Drawings & scheduling delivery dates for suppliers.
 To ensure that construction and erection work is in accordance with the specification and approved drawing and follows good engineering practice, approved codes, quality and applicable standards.
 Coordinate with QA/QC personnel to address quality issues/progress and review inspection reports and records of quality control carried out on completed and running project activities.
 Check the technical data sheet for the materials which supplied by the supplier and prepare RFI for arrival of new materials.
 To supervise the site team to handling all the electrical works considering the safety and quality requirements.
 Responsible for Installation and pre commissioning test of all 33 &11 K.V Equipment’s such as 2x20 MVA & 2x6 MVA power transformers as well as auxiliary transformer, CT/PT, Capacitor Bank, control panels.
 Responsible for installation, glanding and termination of 33KV GIS, 33KV CRP and 11 KV switchgear panels.
 Responsible for Laying of fibre optics cable.
 Supervision Cable Laying, Dressing, Glanding and Termination of HV, MV and LV panel, Electrical lighting, Power outlets etc.
 Installation of MCC & PMMC Panels MV& LV Motors.
 Responsible for Installation of SCADA RTU system, prepare the cable schedule with SCADA engineer and termination of control and communication cable.
 Installation of capacitor bank and termination of control cable for panel.
 Installation of LVAC panel, Earthing and lighting protection system, lighting fixtures, cable and cable tray.
 Installation of battery bank, DC Battery charger and DC DB as per tender specification.
 Responsible for installation of internal and external plant lighting.

Electrical Engineer at GS Neotek Co.,Ltd.
  • Saudi Arabia - Jeddah
  • January 2012 to November 2015

 Regular follow-up with Consultant for Approval of Material Submittals, Method statements, Drawings & Layouts, etc.
 Interaction with Vendors & Suppliers for their quotations, Base design Drawings & scheduling delivery dates for suppliers.
 Responsible for installation of 110 KV/13.8KV Substation according to scheduled plan.
 Installation of all 110 KV and 13.8 K.V Equipment’s such as power transformers as well as auxiliary transformer and 110/13.8 KV switchgear, control panels.
 Responsible for installation of Lighting & Earthing System, Cable Laying, Power Distribution, Switchgear for 110/13.8KV substation.
 Installation of MV&LV Motors, Glanding and Termination of MCC panels, MOV panel heat tracing, cathodic protection system.
 Supervision of site activities such as cable laying, glanding, termination of HV, MV& LV Panels.
 Installation of distribution transformer and RMU in plant and Laying of associated electrical cable.
 High and Medium Voltage Cable laying of long distance distribution network.
 Responsible for Installation of Electrical Distribution Boards (ILDB, OLDB, SSDB, UPSDB), UPS along with Battery Bank, Earthing and Lightning Protection System, Lighting Fixtures, Cable & Cable tray, etc. at site.
 Responsible for Installation of LC Panels, Distribution Boards, Diesel Generator Sets, ATS as per the Project scope.
 Prepare work progress report of daily, weekly and monthly basis and reporting to client.
 Authorized Work Permit issuer for all works.

Electrical Engineer at VSR Electrical and Electronics Co.
  • India - Mumbai
  • June 2009 to August 2011

 Installation of 132/33 KV substation and associated electrical switchgear and panels.
 To Read S.L.D and installation of panels, wiring, earthing & Lighting system according to it.
 Installation of 11/.4kv distribution package substation.
 Attended activities (Testing and commissioning) for main Distribution system which Includes Power cables.
 Review and prepare Cable scheduling, routing, sizing and thereafter execution at site using Cable Trays, Conduiting, etc.
 Installation of medium and high mast plant lighting and associated cable work.
 Installation of motor and generator, LV Panel.
 Supervising of cable laying, cable pulling, glanding and termination of HV, MV and LV cable, lighting wiring, conduit wiring.
 Estimating the materials required for Installation or Execution of work and supervises Man power handling and distributing those works.

Education

Bachelor's degree, Electrical
  • at Aligarh Muslim University
  • June 2009

I did Bachelor of Engineering in Electrical from Aligarh Muslim University in 2009.

Specialties & Skills

High Voltage
Engineering
Construction & Property
Electrical
computer knowledge

Languages

English
Expert

Hobbies

  • net surfing , playing and watching cricket , coocking etc