ELV PROJECT ENGINEER
VISION TECHNICAL SOLUTIONS AND SECURITY SYSTEMS
Total years of experience :4 years, 0 Months
• Design & Engineering of IP and Analogue CCTV System, Biometric systems, ACS systems, Burglar Alarm systems based on the drawings & technical specifications.
• Explaining the features and properties of the products to the end customers.
• Attending Technical meeting with Client and consultant.
• Preparation of Tender Document, BOQ & Estimation for proposed site.
• Co-ordination with Client & Consultant to meet the system requirement with value additional thoughts with the low cost Effects.
• Hands on experience in Configuration of DVR, NVR, BIOMETRIC, ACS SYSTEMS, BURGLAR ALARM SYSTEM (HIKVISION, DAHUA, ELOCK etc.)
• Responsible for design deliverable for the project based on PMO & Client requirement.
• Preparation of CCTV drawings, Schematic and Control design as per latest Qatar MOI-SSD regulations.
• Selection of Cameras, storage devices (with storage calculation) and network devices as per latest Qatar MOI-SSD regulations.
• Handling Return Merchandise Authorization Dept.
• Basic Knowledge of Parking Barrier systems, PA systems, PABX systems.
Organization: Idea Cellular Ltd (1\06\2013 - 23\09\2014 on contract basis)
Designation: Engineer Supporting Staff ( BSS O&M and Project)
ROLES AND RESPONSIBILITIES: • Traffic Shifting of the E1 for maximum utility of the Microwave links.
• Coordinating the microwave link dismantling and transportation activities.
• Implementation and commissioning of Node B and MR BTS.
• Implementation and commissioning of Microwave links NEC pasolink V4, neo i/e, ipaso 100, 200, 400, 1000.
• BSS operation & maintenance activities.
• Capacity addition for BTS sites based on radio utilization & E1 feasibility.
• Troubleshooting and fault analysis of BTS sites.
• Abis loop/break analysis and VSWR measurement for fault detection.
• DCN down analysis and rectification activities of the Node B.
• NMS visibility activities of the microwave links.
• Support for Effective run of the entire Network to ensure the minimum down time.
• Frequent maintenance of the faulty equipment to overcome the present down time.
• Churning out the actual cause for the failure (Root cause analysis)
• NSN Equipments:-
Node B (DBS), Siemens BTS, NSN MR BTS (DBS and Classic)
• Microwave Equipment: -
NEC Pasolink V4, NEC Neo, Ipaso (100, 200, 400, 1000)