Shoy Konath Francis, QA/QC Manager

Shoy Konath Francis

QA/QC Manager

Parsons - Qatar

Location
Qatar - Doha
Education
Bachelor's degree, Civil Engineering
Experience
26 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :26 years, 0 Months

QA/QC Manager at Parsons - Qatar
  • Qatar - Doha
  • My current job since May 2017

ORYX INTERNATIONAL SCHOOL, QATAR AIRWAYS.

CLIENT • M/S QATAR AIRWAYS.
CONTRACT VALUE • USD 1.475 MILLION
PERIOD • MAY 2017 ONWARDS.

SCOPE • An school building of international standard, G+2+P with 40, 000 Sq.m. built up area, 15, 000 Sq.m. land scape and 11, 200 Sq.m. play area. Works include concrete structure, façade, dry wall, space frame, swimming pools, high end finishing and furnishing etc.

QA/QC Manager at Harinsa Qatar (Spanish ECISA group)
  • Qatar
  • March 2015 to March 2017

PEARL QATAR PA 02B, 16A - QATAR.

CLIENT • M/S UNITED DEVELOPMENT COMPANY (UDC).
CONTRACT VALUE • USD 2 MILLION
PERIOD • MAR 2015 MAR 2017.

SCOPE • Residential towers consists of 2 basements, GF, Mez and 21 floors each in Pearl Qatar carried out finishing works and balance civil works as the previous contractor left in between.

Site QA / QC Manager. at M/s Al Jaber Engineering W.L.L.
  • Qatar - Doha
  • November 2005 to December 2014

• Integrated Management System (IMS) establishing, implementing and verifying through audits.

• Preparing / Review Project Quality Plans, Inspection and Test Plan, Quality Control Procedures and Method Statements of works, submitting and obtaining approval from Engineers.

• Acting as company QA/QC representative and managing a team of QA/QC Engineers / Inspectors.

• Advise the Project Management on suitable QA/QC Objectives and Targets. Conduct management review meetings as per company management system.

• Issue Non-Conformance Reports and Corrective Action Request, perform root cause analysis and ensure follow-up with corrective and preventive action as necessary. Also analyze the improvements.

• Review and ensure follow-up of QA/QC complaint. Identify the GAPs in the system and its corrective action plan.

• Identify QSE training needs, prepare, review and authorize the training program for all levels of staff on site.

• Participate in QA/QC Meeting with client and consultant. Organize meeting with subcontractor’s QC team.

• Deploying QC Engineers for Inspection off all works as per approved Drawings, Specifications, and Standards \{BS, ASTM and Company Standards like Armco, Q.P., ADNOC, etc.\} and obtain approval from Clients, Engineers/ Third party inspectors for preceding the works.

• Checking and approving all test reports for materials, concrete, asphalt, curtain wall, stones etc.

• Keeping a well oriented filing system for the traceability of all documents as per ISO 9001:2008 requirements.

• Establish a system for final handover of dossier, Implement the system and arrange to keep it in specified period.

QA/QC Engineer at M/S SIX CONSTRUCT LTD.
  • United Arab Emirates - Abu Dhabi
  • May 2004 to October 2005

A mosque to pray for 25, 000 peoples at a time with high quality Islamic architectural and finishing works from all over the world. Which includes 90% of the total are marble and other architectural works.

• Preparing / Review Project Quality Plans, Inspection and Test Plan, Quality Control Procedures and Method Statements of works, submitting and obtaining approval from Engineers.
• Inspection off all works as per approved Drawings, Specifications, and International Standards.
• Checking and approving all test reports for materials like concrete & its ingrediants, decorative stones etc.
• Keeping a well oriented filing system for the traceability of all documents as per ISO 9001:2008 requirements.
• Establish a system for final handover of dossier, Implement the system and arrange to keep it in specified period.

QA/QC Inspector at Consolidated Contractors International Company
  • Saudi Arabia - Khobar
  • September 1997 to November 2003

QA/QC INSPECTOR

• CCW PROJECT - QATAR
• DGL PROJECT - QATAR.
• Q-CHEM 1 PEOJECT QATAR.
• OGD 2 PROJECT ABUDHABI.
• SHAYBAH PROJECT, K.S.A.
• Carry out inspections to all works to ensure as per approved Drawings, Specifications, and Standards \{BS, ASTM and Company Standards like Armco, Q.P., ADNOC, etc.\} and obtain approval from Clients, Engineers/ Third party inspectors for proceeding the works.
• Issue Non-Conformance Reports and Corrective Action Request, perform root cause analysis and ensure follow-up with corrective and preventive action as necessary.
• Checking and approving all test reports for materials, concrete, Special materials using in oil / Gas projects, etc.
• Keeping a well oriented filing system for the traceability of all documents as per ISO 9001:2008 requirements.

Education

Bachelor's degree, Civil Engineering
  • at KENSINGTON UNIVERSITY, U.S.A.
  • March 2000
Diploma, Civil Engineering
  • at Govt. Sree Rama Polytechnic, Valapad
  • May 1991

Specialties & Skills

Auditing
Quality Management
Project Execution
Concrete
civil engineer

Languages

English
Expert

Memberships

DET NORSKE VERITAS {DNV}.
  • INTERNAL QUALITY MANAGEMENT SYSTEM {QMS} AUDITOR
  • October 2005
CHARTERED QUALITY INSTITUTE
  • ASSOCIATE
  • November 2012
BSI
  • Lead Quality Auditor
  • August 2013

Training and Certifications

BASIC LIFE SUPPORT & FIRST AID. (Certificate)
Date Attended:
February 2010
Valid Until:
February 2010