Shreif Ahmed, Team lead site electrical engineer

Shreif Ahmed

Team lead site electrical engineer

Orascom construction

Location
Egypt - Cairo
Education
Bachelor's degree, ُElectrical engineering
Experience
16 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 11 Months

Team lead site electrical engineer at Orascom construction
  • Egypt - Cairo
  • My current job since September 2016

Responsibility: Team Lead Electrical site engineer.

Job description: Responsible to lead a team for all electrical installation, testing and hand over two Modules each one equipped with 2x400 MW gas turbine + 1x400 MW steam turbine including generators, PCCs, air intake, ACC, Turbines auxiliaries, HRSG, and complete BOP area including Gas receiving and compressing, air compressing, water treatment and tanks, CCR, switch gear buildings, ancillary buildings…

Scope of work:
• Analyzing and review erection drawings.
• Estimates, prepare and assign resources such as manpower, materials, equipment, tools, consumables, etc… required for all electrical related works prior to execution.
• Plan and analyze all possible construction methodologies and recommends the best options to assist project manager for approval prior to execution in site.
• Generally responsible for implementation and monitoring of all electrical related work in site.
• Coaches, advice and motivate team members, and comprehend, solve on-site problems.
• Manage the logistics at site, coordinate and balance the equipment as per schedule.
• Directly responsible for the safety of all team members of the project by ensuring the jobs execution will be done according to all applicable health, safety, sanitary and environmental standards.
• Supervise the erection of the following:
o Electric panels, cable trays, lighting, duct banks, earthing systems.
o Fire alarm, fighting, heat tracing systems.
o Cables pulling, termination and testing.
o MV, LV switch gears, transformers and VFD drives.
o Siemens SIMATIC S7-1200 PLC.
o Telecomm. And security Systems (Paging, LAN, TELE, CCTV, intrusion, gate access, etc..)
o I&C for combined cycle and BOP area.
o Cables test, loop check, signal test, cold commissioning.
o IO checks for DI, DO, AI, AO, motors, solenoid valves, actuators,

Team leader site Electrical Engineer at Orascom Construction Industries
  • Egypt - Cairo
  • June 2014 to September 2016

Responsible for all electrical installation and commissioning work for complete Air Field Lighting system in Cairo International Airport including AFL units, CCRs, Cables and isolating transformers.

Senior Electrical Engineer at Orascom Construction Industries
  • Iraq
  • March 2013 to May 2014

-Biji power plant, Iraq.
- I act as senior site electrical engineer in 6x160 MW Baiji power plant. Responsible for all electrical and instruments work in 6 Siemens gas turbine SGT5-2000E.
-Generally responsible for implementations and monitoring of all electrical related works at site.
-Estimates, prepare and assign the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior to execution.
-Plans and analyses all possible construction methodologies and recommends the best options to the Asst. Project Manager for approval prior to execution at site.
-Directly responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.
-Coaches and advice motivate team members and comprehend and solve on-site problems.
-Manage the logistic at site, coordinate and balance the equipment per schedule.

Senior Electrical engineer at Orascom Construction Industries
  • Egypt - Cairo
  • December 2011 to March 2013

-Grand Heights (infra-structure project), Egypt.
- Acting as Technical office engineer in an infra-structure project for 900 FDD residential compounds.
- Make the shop drawings for the low and medium voltage cables routs, street lighting system, substations lighting and sockets, equipment arrangement in substations and pump stations.
- Make cable calculations and selection, voltage drop calculations, short circuit study, power factor improvement calculation and circuit breakers coordination.
-Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
-Review Technical submittals for low voltage transformers, low voltage distribution boards, RMU, MCC, pumps, cables, cables accessories, motors, diesel generators and lighting material.

Intermediate Electrical Engineer at Orascom Construction Industries
  • Algeria - Oran
  • April 2011 to September 2011

-Terga power plant, Algeria.
- supervise the Algerian sub-contractor (Eltrkib company) for the erection work in the non process areas in Terga 3x360 MW power plant.
- My rule to ensure that, the sub-contractor executes the job according to the specifications and standards with high quality and matching the schedule and making the weekly progress.
-Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works.
-Managing sub-contractors, coordinate and balance the sub-contractors man power & and equipment as per the work plan

Electrical manager at Orascom Construction Industries
  • Egypt - Ismailia
  • May 2010 to April 2011

-Abu Atwa sewage pump station, Egypt.
- Acting as electrical manager for a replacement and upgrade of 6 pump MV motors, MV panels, PLC panels, starters and instruments without stop of a main sewage pump station in Ismailia city
- The replacement is divided into two stages to not stop the station, remove the old equipment and erect the new ones.
- We Defies the time and water flow to success to replace all equipment in short time.
-Estimates, prepare and assign the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior to execution.

Junior Electrical Engineer at Orascom Construction Industries
  • Saudi Arabia - Jeddah
  • September 2008 to March 2010

-Safwa cement plant, Saudi Arabia.
-Supervise a team from 5 to 20 persons to perform all electrical erection work including cable tray, lighting and sockets, low and medium voltage panels, distribution transformers, light current system, cable connection and testing, signal test and commissioning for the Kiln and cement silos areas in a 5000TPD cement plant.

Junior Electrical Engineer at Orascom Construction Industries
  • Iraq
  • March 2007 to August 2008

Bazian cement plant, Iraq.
-Supervise a team from 5 to 15 persons to perform all electrical erection work including cable tray, lighting and sockets, low and medium voltage panels, light current system, cable connection and testing, signal test and commissioning for the crusher and cement mill areas in a 7200 TPD cement plant.

Education

Bachelor's degree, ُElectrical engineering
  • at Faculty of Engineering
  • July 2006

• B.Sc. in Electrical Engineering (Electrical Power and Machines Section)(2006), Cobra Faculty of Engineering, Benha University. • Cumulative Grade: Good, Last year grade: Excellent. • Graduation Project title: Design of Low and Medium voltage networks. • Project Grade: Excellent. Training: • Summer 2002: New & Renewable Energy Authority. (Ministry of Electricity & Energy) • Summer 2003: Cairo West power station. (Ministry of Electricity & Energy) • Summer 2004: ABB Arab company. • Summer 2005: AutoCAD course (2D). • Summer 2009: OSHA safety standard (29 CFR 1926) for Construction safety and health in sites.

Specialties & Skills

Instrumentation
Electric Power
Electrical Testing
Electrical Engineering
Command
Excellent Command of all Microsoft Operating Systems.
Excellent Command of all Microsoft Operating Systems.
• Team player, with great tendency towards learning new concepts.
• High ability to work under pressure.

Languages

English
Expert

Hobbies

  • Reading
    - 2nd position in my college in cultural competition