July 2013 - Present Project Completion Engineer - PMC
International Bechtel Co. Ltd., (PMC for Ethylene Unit 3 Project, Borouge 3, Ruwais, Abu Dhabi) . Borouge is the Joint Venture of Adnoc & Borealis.
• As a member of IPMT responsible to the Sr. Project Manager.
• Coordinate various engineering interface issues.
• Chair regular lessons learned meetings.
• Chair the project risk assessment meetings.
• Coordinate with EPC Contractor and End user on Project handover documentation.
• Assess the cost impact on approved Concession Requests.
• Coordinate with EPC Contractor and COMPANY Core team on Concession Request and Technical Query review and approval.
• Monitoring the implementation of management of changes (CTNs/VOs)
• Provide professional guidance to the Commissioning team.
•As a member of IPMT responsible to the Sr. Project Manager.
•Coordinate various engineering interface issues.
•Chair regular lessons learned meetings.
•Chair the project risk assessment meetings.
•Coordinate with EPC Contractor and End user on Project handover documentation.
•Assess the cost impact on approved Concession Requests.
•Coordinate with EPC Contractor and COMPANY Core team on Concession Request and Technical Query review and approval.
•Monitoring the implementation of management of changes (CTNs/VOs).
•Provide professional guidance to the Commissioning team.
April 2011 - April 2013 QA/QC Coordinator - PMC
International Bechtel Co. Ltd., (PMC for Ethylene Unit 3 Project, Borouge 3, Ruwais, Abu Dhabi) . Borouge is the Joint Venture of Adnoc & Borealis.
• As a member of IPMT responsible to the Sr. Project Manager.
• Ensure the implementation of Quality Assurance and Quality Control plans and requirements for the execution of EPC work scope associated with the EU3 Project.
• Monitor the EPC Contractor in the execution of all work activities for the EU3 scope and ensure the work is completed to required levels of quality.
• Monitor Third Party Inspection Group in the execution of all work activities for the EU3 scope and ensure the work is completed to required levels of quality.
• Actively participate in the EPC Contractor's Quality Assurance processes of construction, including quality audits and the development of appropriate quality documentation.
• Reviewing and endorsing Contractors Quality Control Plans, Inspection and Test Plans, Method Statements, CRs, TQs, NCRs, DRs etc.
• Ensure EPC Contractor and sub Contractors are in compliance with project technical specifications. Endorse any change in technical specifications.
• Coordinate with TPI group, Engineering group and Construction group as and when necessary.
• Provide professional assistance to Project Management, Planning, Procurement & Project controls.
• Do internal / external project reviews / audits, as necessary.
• Chair the Project Risk Assessment meetings.
•As a member of IPMT responsible to the Sr. Project Manager.
•Ensure the implementation of Quality Assurance and Quality Control plans and requirements for the execution of EPC work scope associated with the EU3 Project.
•Monitor the EPC Contractor in the execution of all work activities for the EU3 scope and ensure the work is completed to required levels of quality.
•Monitor Third Party Inspection Group in the execution of all work activities for the EU3 scope and ensure the work is completed to required levels of quality.
•Actively participate in the EPC Contractor’s Quality Assurance processes of construction, including quality audits and the development of appropriate quality documentation.
•Reviewing and endorsing Contractors Quality Control Plans, Inspection and Test Plans, Method Statements, CRs, TQs, NCRs, DRs etc.
•Ensure EPC Contractor and sub Contractors are in compliance with project technical specifications. Endorse any change in technical specifications.
•Coordinate with TPI group, Engineering group and Construction group as and when necessary.
•Provide professional assistance to Project Management, Planning, Procurement & Project controls.
•Do internal / external project reviews / audits, as necessary.
•Chair the Project Risk Assessment meetings.
Jan.2011 - Mar. 2011 Senior Inspection Engineer - Mechanical - PMT
(Short Term Contract)
Velosi LLC., Qarn Alam Steam Injection Project (onplot), PDO, Sultanate of OMAN.
Qarn Alam Steam Injection Project is a Joint Venture of PDO & Shell, which consist of Thermal Gravity Drainage of Crude and Refining.
• As a Member of QA/QC Deptt., responsible to the QA/QC Manager.
• Review for endorse of EPC Contractor's Mechanical Completion Dossiers.
(Short Term Contract)
•As a Member of QA/QC Deptt., responsible to the QA/QC Manager.
•Review for endorse of EPC Contractor’s Mechanical Completion Dossiers
Sept. 2008-June 2010 QA/QC Team Leader - PMT - TPI Group
ABS Group Inc. (Ethylene Unit 2 Project, Borouge 2, Ruwais, Abu Dhabi)
Borouge is the Joint Venture of Adnoc & Borealis.
• As a member of IPMT responsible to the Sr.Project Manager.
• Ensure the implementation of Quality Assurance and Quality Control plans and requirements for the execution of EPC work scope associated with the EU2 Project.
• Monitor the EPC Contractor in the execution of all work activities in the EU2 scope and ensure the work is completed to required levels of quality.
• Review for endorse EPC Contractor's QCP, ITP & Method statements.
• Ensure EPC Contractor and sub Contractors are in compliance with project technical specifications. Endorse any change in technical specifications.
• Coordinate field inspection of each discipline with respect to the related standard, specifications, ITP & vendor manuals.
• Actively participate in the EPC Contractor's Quality Assurance processes of construction, including quality audits and the development of appropriate quality documentation.
• Provide professional assistance to the Project Management, Procurement & Project controls.
• Review NCR, DR, ITR & Field change documentation.
• Participate internal / external project reviews / audits, as necessary.
•As a member of IPMT responsible to the Sr.Project Manager.
•Ensure the implementation of Quality Assurance and Quality Control plans and requirements for the execution of EPC work scope associated with the EU2 Project.
•Monitor the EPC Contractor in the execution of all work activities in the EU2 scope and ensure the work is completed to required levels of quality.
•Review for endorse EPC Contractor’s QCP, ITP & Method statements.
•Ensure EPC Contractor and sub Contractors are in compliance with project technical specifications. Endorse any change in technical specifications.
•Coordinate field inspection of each discipline with respect to the related standard, specifications, ITP & vendor manuals.
•Actively participate in the EPC Contractor’s Quality Assurance processes of construction, including quality audits and the development of appropriate quality documentation.
•Provide professional assistance to the Project Management, Procurement & Project controls.
•Review NCR, DR, ITR & Field change documentation.
•Participate internal / external project reviews / audits, as necessary.
Sept. 2006 - Aug. 2008 Senior QC Inspector - Mechanical
JGC Arabia Ltd., Rabigh Olefin Plants Project, Petro Rabigh, Kingdom of Saudi Arabia.
Rabigh Olefin Plants Project for Petro Rabigh is a Joint Venture of Saudi Aramco & Sumitomo-Japan, which consist of HOFCC & EC.
• Reporting to Field QA/QC Deputy Manager.
• Review and endorse contractor QCP, ITP & Method statements respect to the mechanical discipline.
• Ensure Contractors are in compliance with project technical specifications.
• Verify documents attached to RFI, if it's comply with the relevant drawing & document revision
• Field inspection of the installation & alignment of Static & Rotating Equipment with respect to the related standard, specifications, ITP & vendor manuals.
• Accepting/Rejecting the inspection result based on standard criteria.
• Prepare/Review NCR, DR, ITR & Field change documentation.
• Review & verification of all records during Discipline Acceptance and Mechanical Completion Acceptance stage.
•Reporting to Field QA/QC Deputy Manager.
•Review and endorse contractor QCP, ITP & Method statements respect to the mechanical discipline.
•Ensure Contractors are in compliance with project technical specifications.
•Verify documents attached to RFI, if it’s comply with the relevant drawing & document revision
•Field inspection of the installation & alignment of Static & Rotating Equipment with respect to the related standard, specifications, ITP & vendor manuals.
•Accepting/Rejecting the inspection result based on standard criteria.
•Prepare/Review NCR, DR, ITR & Field change documentation.
•Review & verification of all records during Discipline Acceptance and Mechanical Completion Acceptance stage.
Mar. 2005 - July 2006. Lead Supervisor - Mechanical
Consortium-Astaldi Arabia Ltd & NSH Co. Ltd. C/O Technip Italy S.p.A.
ORYX GTL Project - Raslaffan. Qatar. ORYX GTL (Gas to Liquid) project is a JV of SASOL & QP.
• Organize & direct the site Installation & alignment activities.
• Verify the latest revision of Drawings & Documents.
• Preparation of Method statements for Equipment installation.
• Field installation & alignment of Static & Rotating Equipment with respect to the related standard, specifications, ITP & vendor manuals.
• Conducting daily Safety toolbox talks.
• Coordinate with Vendor, QC & Field Engineering Section.
•Organize & direct the site Installation & alignment activities.
•Verify the latest revision of Drawings & Documents.
•Preparation of Method statements for Equipment installation.
•Field installation & alignment of Static & Rotating Equipment with respect to the related standard, specifications, ITP & vendor manuals.
•Conducting daily Safety toolbox talks.
•Coordinate with Vendor, QC & Field Engineering Section
June 2003 - Jan. 2005 QC Supervisor - Mechanical
Seeyen Engineering Co. Pvt. Ltd., Guwahati Refinery- HTU and Indmax Unit, Assam
• Reporting to QA/QC Manager.
• Ensure Contractors compliance with project technical specifications.
• Preparation of QCP, ITP etc. for Mechanical construction activities.
• Supervising the Inspector's activities & verification of records.
• Prepare/Review NCR, DR, ITR & Field change documentation.
• Solving the site installation problems based on related standards/other relevant documents.
• Verification of Method Statements submits by construction.
• Bore scope Inspection for Centrifugal compressor internals & any
necessary rectification.
•Reporting to QA/QC Manager.
•Ensure Contractors compliance with project technical specifications.
•Preparation of QCP, ITP etc. for Mechanical construction activities.
•Supervising the Inspector’s activities & verification of records.
•Prepare/Review NCR, DR, ITR & Field change documentation.
•Solving the site installation problems based on related standards/other relevant documents.
•Verification of Method Statements submits by construction.
•Bore scope Inspection for Centrifugal compressor internals & any
necessary rectification
June 2002 - May 2003 QC Supervisor - Mechanical
Seeyen Engineering Co. Pvt. Ltd., Revamp of HFC Ltd. Namrup unit (Assam)
• Reporting to QA/QC Manager.
• Ensure contractor's compliance with project technical specifications.
• Preparation of QCP, ITP etc. for Mechanical construction activities.
• Supervising the Inspector's activities & verification of records.
• Prepare/Review NCR reports, DR, ITR & Field change documentation.
• Solving the site installation problems based on related standards/other relevant documents.
• Verification of Method Statements submits by construction.
•Reporting to QA/QC Manager.
•Ensure contractor's compliance with project technical specifications.
•Preparation of QCP, ITP etc. for Mechanical construction activities.
•Supervising the Inspector’s activities & verification of records.
•Prepare/Review NCR reports, DR, ITR & Field change documentation.
•Solving the site installation problems based on related standards/other relevant documents.
•Verification of Method Statements submits by construction.
November 2000 - March 2002. QC Inspector - Mechanical
NSH Co. Ltd., C/O Joint Venture - Snamprogetti S.p.A. & Hyundai Engg.Co.Ltd.
NGL-4 Plant - Umm said-Mesaieed - Qatar, QATAR PETROLEUM.
• Reporting to Lead QC Engineer.
• Verify the attachments of RFI, it's complying with drawings & document revision
• Field inspection for installation & alignment of Static & Rotary Equipment, Structures as per the related standard/documents.
• Coordinate with client for final inspection.
• Preparation of all inspection records.
• Review & verification of all records during the final closure & hand over.
•Reporting to Lead QC Engineer.
•Verify the attachments of RFI, it’s complying with drawings & document revision
•Field inspection for installation & alignment of Static & Rotary Equipment, Structures as per the related standard/documents.
•Coordinate with client for final inspection.
•Preparation of all inspection records.
•Review & verification of all records during the final closure & hand over.
March 1999 - October 2000 Supervisor - Static & Rotary Equipment
Seeyen Engineering Co. Pvt. Ltd., Digboi Refinery- Cocking, De-waxing and HTU, Assam
• Organize & direct the site Installation & alignment activities.
• Verify the latest revision of Drawings & Documents.
• Field installation & alignment of Static & Rotary Equipment with respect to the related standard, specifications, ITP & vendor manuals.
• Conducting daily Safety toolbox talks.
• Coordinate with Field Engineering to solve any non-conformance.
• Classroom training & Coordinating on job practical training in precision alignment to an assigned group of technicians.
•Organize & direct the site Installation & alignment activities.
•Verify the latest revision of Drawings & Documents.
•Field installation & alignment of Static & Rotary Equipment with respect to the related standard, specifications, ITP & vendor manuals.
•Conducting daily Safety toolbox talks.
•Coordinate with Field Engineering to solve any non-conformance.
•Classroom training & Coordinating on job practical training in precision alignment to an assigned group of technicians
Feb. 1998 - Jan. 1999 Millwright supervisor
Star Constructions - Mumbai., Jindal Strips Ltd., Mumbai.
• Installation & alignment of Equipment for Skin pass mill, zendzimer mill & auxiliary equipments, Annealing & Pickling Line, Coil Build up line, Coil Galvanizing line etc.
• Preparation of Relevant documents for Inspection.
• Coordinating with QC & Field Engineering section
///////
•Installation & alignment of Equipment for Skin pass mill, zendzimer mill & auxiliary equipments, Annealing & Pickling Line, Coil Build up line, Coil Galvanizing line etc.
• Preparation of Relevant documents for Inspection.
• Coordinating with QC & Field Engineering section
Qualifications: • Diploma in Mechanical Engineering (3 years). • Pre-Graduation Course - Science (2 Years). • ASNT Level II in PT, MPT, RT and UT (valid up to 2016) • Diploma in Computer Application. (Experienced in MS Office, Indra, EDIS, Lotus Notes, Documentum 5, Procorr, Smart Plant Review, Navis Works Review, Atlas etc.)
• Diploma in Mechanical Engineering (3 years) • Pre-Graduation Course - Science (2 Years) • ASNT Level II in PT, MPT, RT and UT (valid up to 2016) • Diploma in Computer Application. (Experienced in MS Office, Indra, EDIS, Lotus Notes, Documentum 5, Procorr, Smart Plant Review, Navis Works Review, Atlas etc.)