Total Years of Experience: 20 Years, 3 Months
May 2014
To November 2014
Executive Director
at Radiance Precision Industries Pvt Ltd
Location :
India - Hyderabad
• Providing Technical Consultancy for setting up of Precision component Manufacturing unit.
• Providing technical consultancy for manufacture of Mobile Self loaders, Dredging equipment, underwater pipeline laying.
• Managing the preparation of DPRs for projects
• Spearheading the preparation of training modules for Project Management, Time scheduling, Cost Management, Quality Management, etc.
• Providing technical consultancy for manufacture of Mobile Self loaders, Dredging equipment, underwater pipeline laying.
• Managing the preparation of DPRs for projects
• Spearheading the preparation of training modules for Project Management, Time scheduling, Cost Management, Quality Management, etc.
April 2013
To April 2014
General Manager
at MEIL
Location :
India - Hyderabad
• Headed the project for laying and commissioning of Sea-water intake/outfall pipeline for 2x800 MW Thermal Power Plant at Nellore
• Coordinated with more than 8 suppliers/contractors for timely completion of project
• Liaised with Government authorities -APGENCO and obtained all statutory clearances
• Coordinated with more than 8 suppliers/contractors for timely completion of project
• Liaised with Government authorities -APGENCO and obtained all statutory clearances
January 2011
To September 2012
CEO
at Greta Energy Ltd
Location :
India - Nagpur
• Set up and commissioned a 15 MW Thermal Power Plant in Chandrapur district
• Effectively utilized Project Management skills to progress with all activities, whilst ensuring cost-cutting where possible
• Coordinated with more than 20 suppliers/contractors for timely completion of project
• Liaised with Government authorities such as PCB, EDA and SEBs at various levels and obtained all statutory clearances
• Liaised with external agencies for Power Purchase Agreement and concluded the same
• Effectively utilized Project Management skills to progress with all activities, whilst ensuring cost-cutting where possible
• Coordinated with more than 20 suppliers/contractors for timely completion of project
• Liaised with Government authorities such as PCB, EDA and SEBs at various levels and obtained all statutory clearances
• Liaised with external agencies for Power Purchase Agreement and concluded the same
April 2007
To May 2010
Head Aviation Projects
at Naval Liaison Establishment
Location :
India - Hyderabad
• Liaised with the Defence PSUs to ensure scheduled delivery of materials and services as per contract terms
• Planned requirements of aviation spares and coordinated with Naval stock to line up delivery of Quality Aviation Spares at the repair agencies to maximize operational availability of aircraft
• Coordinated with Defence PSUs to catalyze qualitative performance of maintenance/repair jobs of aircraft resulting in minimum downtime
• Identified new sources of Maintenance/Production of Avionic spares
• Planned requirements of aviation spares and coordinated with Naval stock to line up delivery of Quality Aviation Spares at the repair agencies to maximize operational availability of aircraft
• Coordinated with Defence PSUs to catalyze qualitative performance of maintenance/repair jobs of aircraft resulting in minimum downtime
• Identified new sources of Maintenance/Production of Avionic spares
May 2004
To April 2007
Joint Director
at Naval Headquarters
Location :
India - Delhi
• Actively involved in 22 major procurement processes, including solicitation, price negotiations, and signing of contracts.
• Successfully accomplished 04 indigenization projects for Naval Aviation generating savings in procurement/ import costs to the tune of 20 lakhs per annum. Executed periodical review of operational performance of Naval Air Technical units and provided necessary inputs to maintain desired efficiency and quality levels
• Set up infrastructure for operation and maintenance of newly inducted fleet of 16 aircraft and associated front and second-line maintenance equipment.
• Successfully accomplished 04 indigenization projects for Naval Aviation generating savings in procurement/ import costs to the tune of 20 lakhs per annum. Executed periodical review of operational performance of Naval Air Technical units and provided necessary inputs to maintain desired efficiency and quality levels
• Set up infrastructure for operation and maintenance of newly inducted fleet of 16 aircraft and associated front and second-line maintenance equipment.
March 2003
To May 2004
HOD Electrical
at Indian Naval Ship
Location :
India
Ship's Technical Officer, Visakhapatnam (Mar’03 - May’04)
• Successfully accomplished the ship’s refit schedule of 05 months with deft application of resource planning and maintenance strategies
• Effectively maintained survey equipment for operation in rough seas
• Evolved breakdown solutions for technically complicated imported electronic machinery and sea-gravity detection system by systematic approach to defect investigation & root cause analysis despite non-availability of relevant technical documents.
• Successfully accomplished the ship’s refit schedule of 05 months with deft application of resource planning and maintenance strategies
• Effectively maintained survey equipment for operation in rough seas
• Evolved breakdown solutions for technically complicated imported electronic machinery and sea-gravity detection system by systematic approach to defect investigation & root cause analysis despite non-availability of relevant technical documents.
June 2001
To March 2003
Manager
at Naval Aircraft Yard
Location :
India
• Played key role in securing ISO certification for the Yard in 2002.
• Successfully implemented project of “conversion of a non-fly worthy aircraft into a dynamic Ground Testing Unit” contributing modern project management techniques.
• Successfully implemented project of “conversion of a non-fly worthy aircraft into a dynamic Ground Testing Unit” contributing modern project management techniques.
May 1997
To June 2001
Officer-in-Charge (Technical Manager)
at Indian navy - Naval Avionic Repair Establishment
Location :
India
• Effectively managed repairs of more than 40 electronic equipments indigenously, assessed non-reparable by the OEM
• Spearheaded the indigenization of more than 30 complex Avionic equipment, for which I was awarded Commendation by the Chief of Naval Staff
• Spearheaded the indigenization of more than 30 complex Avionic equipment, for which I was awarded Commendation by the Chief of Naval Staff
May 1995
To April 1997
Aviation Technical Manager
at Indian Naval Ship
Location :
India - Mumbai
I was the Aviation Technical Manager for the ship during this period, and effectively spearheaded the maintenance, repairs and various periodical and hourly based inspections to ship-based aircraft. During this time, also spearheaded major repairs to one aircraft, viz. entire cable change to all electrical and electronic components damaged severely due to fire.
August 1993
To April 1995
Aviation Technical Manager
at Indian Naval Air Establishment
Location :
India
As an Aviation Technical Officer of the Naval base, I spearheaded the repairs, maintenance and periodic and hourly based inspections to 8 aircraft during this period.
Share on Facebook
Share on Twitter
Share Via Email