srinivasan parthiban, SR. PROJECT MANAGER

srinivasan parthiban

SR. PROJECT MANAGER

SOBHA HARTLAND CONTRACTING LLC

Location
United Arab Emirates
Education
Diploma, Mechanical Engineering
Experience
32 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :32 years, 7 Months

SR. PROJECT MANAGER at SOBHA HARTLAND CONTRACTING LLC
  • United Arab Emirates - Dubai
  • My current job since April 2018

• Steering operations for managing long term plans; identifying risks, opportunities and options
• Development and implementation of effective construction monitoring and controlling tools to maintain team’s focus on progress constantly.
• Aptitude for analysing, identifying problems, and coming with out-of-the box solutions; promoting a culture of informed decision making ensuring that units of corporate responsibility are planned, structured and focused
• Attracting, motivating and coaching talent to achieve the objectives
• Anticipation of project requirements in line with client requirements
• Making available the design and site clearances to MEP vendors
• Obtaining the site clearances from MEP vendors for other trades of work viz; finishes, false ceiling works, toilet works, and elevator/escalator lobbies etc.
• On/off site MEP coordination
• Making the manpower and material available in time
• Value engineering
• Responsible for feasibility studies, enquiry generations, techno-commercial discussions, tendering, order execution, collection of receivables and coordination for after sales service
• Managing recruitment, training and selection of personnel as well as organising, planning, and staffing operations

Senior Project Manager at Trans Gulf Electro Mechanical International WLL Doha – Qatar
  • Qatar - Doha
  • September 2013 to December 2017

Identifying the resources required for the construction and monitoring the performance
and progress of the works in relation to approved works program
2 Coordinate with Pes and ensure that resources are allocated as per the project plan.
3 Assist in identifying potential sub‐contractors and coordinate through the PE’s to get
quotes and prepare evaluation.
4 Participate in project progress meeting.
5 Ensure productivity targets are met and the works are carried out as per the approved
Project Quality Plan
6 Liaises with the consultants, the Main contractor, the sub‐contractors, the suppliers to
ensure works at site are not delayed.
7 Identify and highlight any bottlenecking issues and provide hands on solution to resolve
the same.
8 Coordinates for inspections and clearances as required for the Main contractor to
ensure smooth working at site.
9 Preparation of close out schedules in coordination with discipline in charges / main
contractors.

SR.CONSTRUCTION MANAGER at TRANS GULF INTERNATIONAL ELECTRO-MECHANICAL WLL
  • Qatar - Doha
  • October 1998 to September 2013

ORGANISATIONAL EXPERIENCE
Since October 2011: Trans Gulf International Electro-Mechanical WLL as Project Manager/ Senior
Construction Manager (MEP Services), associated with following Landmark projects
1. Project :Msheireb Downtown Doha Land Phase-2
a. Client :Msheireb Properties
b. Consultants :M/S Buro Happold
c. Main contractor:M/S Arabtec
2. Project :Ministry of Interiors Head Quarters
a. Client :Ministry of Interiors, Government Of Qatar
b. Consultants :M/S CEG
c. Main contractor :M/S Berhad
3. Project :Q-Tel Technical & Customer service Building
a. Client :Qatar Telecom (Q-tel-OORDEOO)
b. Consultants :M/S United Consultant
c. Main contractor :M/S Amana contracting
4. Project :Sinyar Tower
a. Client :Shk.Faisal Bin/Jassim Al Thani
b. Consultants :M/S Diwan Architects
c. Main contractor :M/S Derwind contracting


From October 1998 to October 2011: Trans Gulf Electro-Mechanical LLC, Dubai as Construction Manager (MEP Services), associated with following Landmark projects
5. Project : Park Hyatt, At Saadiyat Island, Abu Dhabi
a. Client : TDIC / AUH National Hotels
b. Consultants : M/s EHAF Associates / Hill International
c. Main contractor : M/s ALEC
d. Role :Construction Manager

6. Project : The Nad Al Sheba Racecourse(Meydan) Dubai
a. Client : Meydan LLC
b. Consultant : Teo A. Khing Design Consultants/ Ian Banham
c. Main Contractor : M/s WCT / Arabtec
d. Role : Sr. Project Engineer

7. Project : District Cooling Plant, Healthcare City, Dubai
a. Client : Emaar Properties PJSC
b. Consultant : M/s Ellarbe Becket/ Tebodin
c. Role : Sr. Project Engineer

From 1996 to 1998: M/S Qatar Building Engineering Co. Qatar as HVAC Engineer, associated with following Landmark projects
8. Al Ghanem Commercial Complex
9. Farm house - Abufas for Emir
10. NCC Building of Cegelec
11. Office Complex for GRIDCO
12. Salam Tower
13. Doha Office Tower
From 1989 to 1993: M/s. Airvent Pvt. Ltd., Bangalore, India as Project Engineer, associated with following Landmark projects
14. ITC Bangalore & Sharangapur, Uttar Pradesh, India
15. KCP, Chennai, India
16. MRL, Chennai, India
From 1987 to 1988: M/s. Industrial Rubber Products, India as Maintenance Engineer


Key Assignments Handled
• Handled the estimation, execution and hand over to operations of the following:
o HVAC:
 Water cooled/air cooled central air conditioning/screw, centrifugal chillers/cooling towers/primary-secondary-condensor pumps/AHUs/CCUs/Energy Transfer stations/centrifugal fans/axial fans/Basementventilation/Atriumventilation/Smokeextraction/staircasepressurization/ Chilledwaterpipingsizing, installation/Ductingsizing, installation/Kitchenventilation/Valves/dampers/ Insulation/starters/VFDs/Green buildings/RCP

o Electricals:
 11KV/Transformers/HT/LT/Standby power by Diesel Generator/HT/LT Cabling, Poles, Switchgear, MCC, PCC & MDB/Power Factor Correction panel, Earthing /Circuiting/Distribution boards/Lighting/Lightning arrestors
 ELV services:FA/PAVA/CCTV/ACS/LCS/Structured cabling/
o Plumbing:
Water supply/Drainage/Water supply piping, Water supply pipe material-CPVC, UPVC, GI, CI, PP-R, HDPE/Drainage, soil, waste, vent, kitchenwaste, Stormwaterpiping/PipematerialUPVC, HDPE, SWG, CI, RCC Hume pipes/Water treatment plant/Pump sets-End suction, Inline, close coupled, /Distribution

Consultant at Msheireb Properties
  • India
  • October 1998 to October 2011

M/s Buro Happold
Main Contractor : M/s Arabtec Contracting
Project Value : QAR 485 Million


M/s. Trans Gulf Electro‐Mechanical (LLC)

Construction Manager at TRANS GULF ELECTRO MECHANICAL LLC
  • United Arab Emirates - Dubai
  • October 1998 to September 2011

• Developing project baselines; monitoring and controlling projects with respect to cost, time over-runs and quality compliance to ensure satisfactory execution of projects
• Overseeing the estimation of material quantities and preparing deviation statements of quantities according to the site condition
• Liaising with sub-contractors and subordinates to get the things done within scheduled duration
• Developing effective understanding & relations and coordination of design services & specifications.
• Executing the MEP inspection with client and consultants
• Planning and coordinating upstream developmental construction activities which involve MEP Design Management/Coordination and reviewing the same within stipulated time and cost parameters
• Ensured sequential progress of MEP works for releasing areas to other agencies to work
• Assured areas are released for teams to be freed & cross-substituted workers across similar groups of different streams
• Identifying the resources required for the construction and monitoring the performance and progress of the works in relation to approved works program
• Coordinate with PEs and ensure that resources are allocated as per the project plan.
• Assist in identifying potential sub-contractors and coordinate through the PE’s to get quotes and prepare evaluation.
• Participate in project progress meeting.
• Ensure productivity targets are met and the works are carried out as per the approved Project Quality Plan
• Liaises with the consultants, the Main contractor, the sub-contractors, the suppliers to ensure works at site are not delayed.
• Identify and highlight any bottlenecking issues and provide hands on solution to resolve the same.
• Coordinates for inspections and clearances as required for the Main contractor to ensure smooth working at site.
• Preparation of close out schedules in coordination with discipline in charges / main contractors.

HVAC Engineer at M/s. Airvent Pvt. Ltd
  • India
  • January 1996 to January 1998

Major Projects Handled :
1. Al Ghanem Commercial Complex
2. Farm house - Abufas for Emir
3. NCC Building of Cegelec
4. Office Complex for GRIDCO
5. Salam Tower
6. Doha Office Tower

Project Engineer at KCP
  • India
  • January 1989 to January 1993

Major Projects Handled :
1. ITC Bangalore & Sharangapur, Uttar Pradesh, India

Maintenance Engineer at M/s. Industrial Rubber Products
  • India
  • January 1987 to January 1988
Consultant at Qatar Telecom
  • India
  • to

Main Contractor : M/s Amana Contracting
Project Value : QAR 100 Million


Project : SINYAR TOWER
Client : Shk. Faisal Bin / Jassim Al Thani
Consultant : M/s DIWAN Architects
Main Contractor : M/s Derwind Contr.
Project Value : QAR 51 Million





Project : Msheireb Downtown Dohaland Phase ‐ 2

Sr. Project Engineer at Meydan LLC
  • United Arab Emirates
  • to

Project : The Nad Al Sheba Racecourse(Meydan) Dubai

Consultant at Madinat Jumeirah Resor
  • India
  • to

RPW Consulting Engineers/CKR/Africon
Main Contractor : M/s Brookfield
Project Value : AED 330 Million

Duties and Responsibilities for the below mentioned projects

1 Responsible for the supervision of works and activities of personnel under his control.
2 Raising site stock requisitions.
3 Ensures the conformity with all quality procedures and inspection requirements.
4 Inspection of the materials received from suppliers / main stores
5 Performance of day to day inspection and test activities in the sites.
6 Responsible to inspect the customer supplied product upon delivery at site stores.
7 Give necessary feedback to the project management on the progress of works.
8 Keep track of abortive works / variation work and forward the relevant details to QS
department for necessary claims
9 Monitor and control site resources utilized by supervisors / foremen as per site
requirement.
10 Provide updates to supervisors / foremen of any changes in scope of works.
11 Ensure adequate productivity measure and control of day to day activities

Sr. Site Engineer at The Fairmont Hotel
  • India
  • to
Consultant at Arabian Construction Co
  • United Arab Emirates
  • to

AED 118 Million

M/s Qatar Building Engineering Co., Qatar

Consultant at Ministry of Interior
  • United Arab Emirates
  • to

Major Projects handling in Doha‐ Qatar



Project : Ministry of Interior Head Quarters

Education

Diploma, Mechanical Engineering
  • at chennai univercity
  • June 1987

Specialties & Skills

Project Closeout
Contract Administration
Job Design
Construction Management
Project Management
BUDGETING
CONSULTING
CUSTOMER RELATIONS
CUSTOMER SERVICE
DELIVERY
MECHANICAL
MICROSOFT OFFICE
MICROSOFT WORKS
PROGRESS
QUALITY

Languages

English
Expert

Hobbies

  • PLAYING CRICKET AND READING BOOKS,