Lead Engineer ( Electrical )
Arabian Petrochemical Company - Petrokemya
Total years of experience :35 years, 2 Months
Position - Lead Elect. Engineer in Power Distribution division & Ethylene Plant.
Responsibility -
- Maintenance & upkeep of electrical equipment.
- Reliability improvement.
- Tech. Support to other Plants - PE, PPS, PVC & VCM.
Projects handled -
1. Condition assessment & load testing of Em. DG sets
2. Replacement of Old UPS Chargers & batteries. -
3. 230 KV & 115 KV GIS maintenance.
E & I) in Estimation & Proposal, Construction division.
Projects handled -
•Recovery Plus module & PSA Skid for KPPC, Kuwait (Customer - UOP, USA / SKEC Korea) at ISCO workshop - Elect. Works.
Achievement - Timely completion of the Project (7 months) to Customer satisfaction.
•Elect. Estimation work for PD Jobs ( KNPC ) -
•Consultancy service for Flood Light - ( Under execution )
•Replacement of 20 ‘’ LSFO / HFO filling system - Heat Tracer installation ( Under execution ) -
•24 ‘’ Black Oil Pipe line Heat Tracer installation - ( Under execution )
•Replacement of Regenerated Tower
•Clean Fuel Project - Cathodic Protection work.
•Parallel HP Steam Header
•New IRT Pipe Line - Cathodic Protection
•Elect. Estimation work for Tenders - KOC & others -
•MEW - Shuaiba Power Plant - For Fisia Italy ( Under negotiation )
•JO - PMP Back wash facility & Tank Cathodic Protection
•KOC Projects -
RFP 1640, RFP 1663, RFP 1668, RFP 1677, RFP 1699, RFP 1707
RFP 1734, RFP 1844, RFP 1899 (Working).
•KNPC - Ammonia Injection facilities ( Under evaluation )
•KNPC - Operating Shelter
• KNPC - Fired heater replacement for SKEC.
•KNPC - Flare Gas recovery Project
Achievement - Timely completion of the Tender submission & accurate estimation
(Elect.) - CPP, PP, PE & Olefins Plant
Plant was recently taken over by NNPC & started.
•Streamlining of Contract procedures.
•Maintenance system was established.
•Training of Nigerian staff to new maintenance technique.
•Preparation of debottlenecking proposals like UPS replacement etc.
•Maximo system implementation.
Achievement - System establishment from zero to 95 % level in hostile
Unsafe atmosphere
MEG, Tank Farm & ETP plant.
•ETP 3 Plant -
DEC - John Brown / Davy Powergas, India.
Installation, Erection, Testing & Commissioning of
•2 * 25 / 27.5 MVA KEC make Transformers-
•L & T make 4 nos. PCC & 6 nos. MCC.
•Neo Power 220 V DC Battery Charger
•Tata Liebert Emerson make UPS - 2*120 KVA
•14 nos. HT motors ranging from 500 KW to 4400 KW. - Make BHEL, Siemens Germany.
•400 nos. LT Motors ranging from 0.37 KW 160 KW.
•30 nos. VSD’s ranging from 0.37 KW to 500 KW. - Make SEW, Simovert - P, GTO drive.
•3 nos. Bagging lines of 30 Ton capacity each.
•Replacement of 90 KW Pelletizer / Simovert - P drive by Siemens Master Drive.
•Replacement of 500 KW Melt Pump / Simovert - P drive by ABB ACS 800 drive.
•W & P make Extruder Package.
•Pneumatic Conveying Package by M/s Waeschle.
•Achievement -
Both lines of PP plants are commissioned in record time of 24 months.
V. Captive Power Plant
DEC - DCL, India
Testing & Commissioning of 220 KV Switchyard. 33 KV Switchgear & 2 *Frame 6 GT -Thomassen International ( 40 MVA capacity )
•Achievement -
Both Gas Turbines (Frame 6) & Switchyard was commissioned in time
Urea & Ammonia plant.- Electrical Maintenance
SWelding Gen. development section )
Training :
•Siemens make Master drive - Operation & Maintenance.
•ISO 9001 : 2000 ( LRQA
First class with distinction