Syed Mudassir Hussain Pirzada, Sr. Project Engineer

Syed Mudassir Hussain Pirzada

Sr. Project Engineer

Orient Energy Systems Pvt. Ltd.

Location
Pakistan - Karachi
Education
Bachelor's degree, Mechanical Technologist
Experience
18 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 5 Months

Sr. Project Engineer at Orient Energy Systems Pvt. Ltd.
  • Pakistan - Karachi
  • My current job since January 2013

Execution.

Construction Manager at Orient Energy Systems Pvt. Ltd.
  • Pakistan - Karachi
  • January 2012 to December 2012

Execute the Gas Engine based EPC Power Project, i.e; "Civil, Electrical and Mechanical"

Execution of Mechanical Piping of Gas Generator (GEJ Jenbacher) based power plant as per GEJ Jenbacher's specification. Model JMS 620 upto 3.3 MW.

Installation and placement of Electro Mechanical Equipment i.e. Gas Compressor, Gas tanks, Plate type Heat Exchanger, Centrifugal Pump for circulation of cooling water, Rectangular type reduce drop induce draft cooling towers, Gas supply system "Low and High Pressure" (Compensated Gas Street) and Exhaust Silencers etc.

Installation of piping 1/2" to 20" Dia. for Cooling water circulation, Fuel Gas System as well as Lube Oil system etc.

Installation of M.S Support Structure for cooling water system, Lube Oil Tanks, Lube Oil Supply and return System, Gas Filter-ration System with Bypass arrangement and Gas street platform,


Conduct the N.D.T, i.e, Radiography, Hydro-test etc.

Sr. Project Engineer at Orient Energy Systems (Pvt.) Ltd.
  • Pakistan - Karachi
  • January 2011 to December 2011

Execution of Mechanical Piping of Gas Generator (GEJ Jenbacher) base power plant as per GEJ Jenbacher's specification. Model No. JGS 620F.

Installation and placement of Electro Mechanical Equipment i.e. Gas Compressor, Gas tanks, Plate type Heat Exchanger, Centrifugal Pump for circulation of cooling water, Rectangular type reduce drop induce draft cooling towers, Gas supply system "Low and High Pressure" (Compensated Gas Street) and Exhaust Silencers etc.

Installation of piping 1/2" to 20" Dia. for Cooling water circulation, Fuel Gas System as well as Lube Oil system etc.

Installation of M.S Support Structure for cooling water system, Lube Oil Tanks, Lube Oil Supply and return System, Gas Filter-ration System with Bypass arrangement and Gas street platform,


Conduct the N.D.T, i.e, Radiography, Hydro-test etc.

Project Engineer at Orient Energy Systems
  • Pakistan - Karachi
  • April 2008 to December 2010

1 Carrying out the selection of equipments necessary for installations of gas generators

2 Correspondence with Customers/Consultants for proper execution & completion of projects.

3 Looking after all the installation activities and trouble shooting of all technical, social and commercial problem arises.

4 Correspondence & coordination with suppliers / contractors for satisfactory workmanship & timely procurement & delivery of equipments.

5 Analyzing and designing Process & Instrumentation Diagrams

6 Preparing Power house designs and layout as per GE Jenbacher standards

7 Floating inquiries, making comparative statements and technical clarification from GE Jenbacher, obtaining financial approval from management.

8 Selection of Instruments such as Cooling Tower, Pump, Pipes and Ventilation Fans.

Shift Incharge in Utility Department. at Orient Textile Mills
  • Pakistan - Karachi
  • March 2003 to May 2005

I worked at Orient Textile Mills as a Utility Shift Incharge.

In this duration My job responsibilities were to look after/ supervise uninterrupted supply of Electricity by Gas Generator, Smooth operation of Air Compressor, W.H.R Boiler and H.W.F Chillers as well as preventive and corrective maintenance in Utility department .

Education

Bachelor's degree, Mechanical Technologist
  • at Indus Institute for Higher Education
  • May 2009

The GPA is 3.0,

Diploma, Mechanical
  • at Pakistani Swedish Institute of Technology
  • March 2003

I had completed My D.A.E in Mechanical Technology with 70.05 % Marks, in the year of 2003.

Specialties & Skills

Project Execution
Cooling Towers
Equipment Installation
Power Plant Operations
Electro mechanical
Execution of EPC Power Project.
AutoCAD 2006.
Team Leader
Project Planing and Controlling by Primavera P6.
Conduct On Site ND T's (Hydro test, Radio Graphy of Welding Joints)
Operation and Maintenance of Gas Engine Power Plant
Project Management

Languages

English
Intermediate

Training and Certifications

Work Shop (Training)
Training Institute:
NED University of Engineering & Technology
Date Attended:
February 2013
Visit to the Manufacturing Plant of Cooling Tower. (Training)
Training Institute:
Layingchi Cooling Tower
Date Attended:
April 2012