طارق احمد محمد عسل, resident engineer project manager

طارق احمد محمد عسل

resident engineer project manager

DMG-DMA GROUP

البلد
مصر
التعليم
بكالوريوس, Civil department
الخبرات
31 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :31 years, 3 أشهر

resident engineer project manager في DMG-DMA GROUP
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ سبتمبر 2019
Site Supervision Manager في SOMA BAY for touristic development
  • مصر
  • أكتوبر 2018 إلى أغسطس 2019

Lead site Supervision Engineers team

Resident Engineer في Concord Consultant Group
  • مصر - القاهرة
  • سبتمبر 2016 إلى سبتمبر 2018
Project Manager في Othman Al-Ghamdi Contracting
  • المملكة العربية السعودية - الرياض
  • أغسطس 2013 إلى أغسطس 2016

Construction Headquarter of Arab open university - Riyadh (AOU)
My responsibilities comprised of follow up the construction activities to ensure compliance with time schedule and budget, integration between all discipline and prepare the monthly look ahead plans for site and procurement. prepare monthly invoices and review and approval of sub contractors invoices.
attend technical and coordination meeting with consultant and owner Rep.

RESIDENT ENGINEER/ PRINCIPLE CIVIL ENGINEER في (ECG) ENGINEERING CONSULTANTS GROUP
  • مصر
  • أغسطس 2006 إلى أبريل 2013

•October 2011 - DATE, ECG Engineering Consultants Group S.A, Cairo Egypt, Resident Engineer, Outsourcing Building (MB4) for Cairo contact centers park, Maadi (Ministry of communications and information technology). Responsibilities include Direct/supervise all construction activities and acts as the construction representative of ECG and in charge of all site work, prepares necessary daily, weekly and monthly progress reports, review the progress and completion reports prepared by contractor, study and approve the contractors claims and review contractor evaluation (payments) .

•NOVEMBER 2009 - AUGUST 2011, ECG Engineering Consultants Group S.A, Cairo Egypt, Resident Engineer, HALLIBURTON workshop at Kattamia Cairo. Responsibilities include Direct/supervise all construction activities and acts as the construction representative of ECG and in charge of all site work, prepares necessary daily, weekly and monthly progress reports, review the progress and completion reports prepared by contractor, study and approve the contractors claims and review contractor evaluation (payments) .

•APRIL. 2008 - NOV., 2009, ECG Engineering Consultants Group S.A, Cairo Egypt, Principal Civil Engineer, main building and infrastructure for Cairo contact centers park, Maadi (Ministry of communications and information technology). Responsibilities included review the technical submittals (shop drawing, materials, and time schedule), site supervision and inspection the work to assure that it carry out according to the drawings and specifications.


• AUG. 2006 - MAR. 2008, ECG Engineering Consultants Group S.A, Cairo Egypt, Principal civil Engineer. And deputy resident engineer, Extension of Marsa-Alam international airport. Responsibilities included review the technical submittals (shop drawing, materials, and time schedule), site supervision and inspection the work to assure that it carry out according to the drawings and specifications.

Owner Rep.- Civil Engineer في American instituts for research
  • مصر
  • فبراير 2006 إلى أغسطس 2006

•FEB 2006-AUG 2006, American Institutes for research (US AID - Funded), owner representative and area manager. Schools construction at Cairo. Responsibilities included prepare the tender documents and review the design drawings and bill of quantities and contract conditions. Responsible for Contracts Administration, contractors pre-qualification activities, pre-bid activities, bids evaluations and recommendation for selection .

Technical Office Manager / Project Manager في Ahmed Elshaknkiry consultant office
  • مصر - القاهرة
  • يونيو 2003 إلى يناير 2006

Project Manager/ Resident engineer for Projects Misr 2000 language school, Delta Spice medical crops Fumigation & Sterilization Factory, Abou Rawash Industrial distr., Giza. Duties comprised the following:prepare the tender documents and review the design drawings to ensure compliance with the stakeholder requirements and participate in preparation of B.O.Q and contract conditions. Responsible for Contracts Administration, contractors pre-qualification activities, pre-bid activities, bids evaluations.
During executing my duties include Direct/supervise all construction activities and acts as the construction representative of Consultant office and in charge of all site work, prepares necessary daily, weekly and monthly progress reports, review the progress and completion reports prepared by contractor, study and approve the contractors claims and review contractor evaluation (payments) .

Construction manager في Egydan ( Egyptian Danish project managment company )
  • مصر
  • أكتوبر 2002 إلى مايو 2003

Construction manager for Elshouifat International school at Dream Land. Duties comprised the following: coordination between the technical office and site engineers at all disciplines, prepare plans for requirements and look ahead weekly& monthly time schedule and follow up the activities to be carried out according to the drawings and specs.

Site manager في Lagouna touristic development
  • مصر
  • أغسطس 2001 إلى سبتمبر 2002

Site Manager. For four stars hotel Sharm-Elsheikh. Duties comprised the following: management and planning, quantity survey, monitoring construction works, cost control and performing quality control works.

Site Manager في Excel for integrated arch. & construction
  • مصر
  • سبتمبر 1996 إلى يونيو 2001

Site Manager. Duties comprised the following: management and planning, quantity survey, monitoring construction works, cost control and performing quality control works.
- Renewing Petro-Gas factories Kattamia, Tanta, Mostord, Suze.
- Luxuries Villas in new Cairo.
- Residential building for Eng. Qutb A. Khalid, El Nozha St., Heliopolis, Cairo, Egypt.

Site & Technical office engineer في Adel Nasr consultant&contrac. office
  • مصر
  • أغسطس 1992 إلى يونيو 1996

•construction engineer. Duties comprised the following: construction supervision to assure that the work carried out according to the drawings and specifications.
- Diplomatic Touristic village at (KM 33) Alex - Mattrouh.
- Construction of several residential and administration buildings, Nasr City, Cairo.
- Forrer secondary school Helioplis.
- Egik Plast & Queens factory for Eng. Tarek Azab, Industrial distr. 6th October, Egypt.

الخلفية التعليمية

بكالوريوس, Civil department
  • في Ain Shams university
  • يونيو 1992

Structural Division

Specialties & Skills

Construction Methods
Construction Management
Project Planning
Primavera P6
Report Building
Autocad, Primavera P6 Rel. 8.1, Excel,Managerial skills

اللغات

الانجليزية
متمرّس

العضويات

Egypt Engineers Syndicate
  • Engineer
  • June 1992

التدريب و الشهادات

PMP preparation course (الشهادة)
تاريخ الدورة:
April 2013
صالحة لغاية:
May 2013
Primavera P6 Rel. 8.1 (الشهادة)
تاريخ الدورة:
April 2013
صالحة لغاية:
April 2013
Primavera Ver. 5.0 (الشهادة)
تاريخ الدورة:
March 2006
صالحة لغاية:
March 2006
Primavera Expedition (الشهادة)
تاريخ الدورة:
February 2006
صالحة لغاية:
February 2006