Maintenance Planning Engineer
Descon - Qatar
Total years of experience :11 years, 6 Months
Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting
Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting
Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting
1) Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting.
Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting.
GASCO Engineering Pakistan (Oil & Gas Sector) 09-Oct 2008 to Present
Working as Planning Engineer
•••••• Worked with GASCO Engineering at Kadanwari Gas Field Pakistan (OMV Pakistan)
Duration: 20-Aug 2013 to 26-Nov 2013.
• Jobs: wellhead Construction and Flow Line (Pipe Line) 5KM.
Job Responsibilities
1) Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting.
Working as Project Engineer/ Area Planner
• Worked with Al-Tariq Engineering Ltd. at Muzaffar Garh Thermal Power (MEPCO)
Duration: 12-Apr 2013 to 28-June 2013
Jobs: Replacement of piping & Re tubing of Boiler.
• Worked with DESCON Engineering UAE at Abu Dhabi Refinery Umm Al Nar (Takreer)
Duration: 28-Jan 2013 to 18-Mar 2013
• Jobs: Maintenance of Vessels/Tanks, Back Pressure Towers, Selpher Pits, Heat
Exchangers, Columns, Reactors and Heaters.
1
Duration: 25-Dec 2012 to 25-Jan 2013
• Jobs: Maintenance of Heat Exchangers, Columns and Tanks.
• Worked with AL-Barrak industrial services at Saudi Methanol Company Ar-Razi (SABIC)
AL B ARRAK Ind's Service s Saudi Arabia (22-Nov 2011 to 28-Jan 2013)
Working as Planning Engineer
• Worked with AL-Barrak industrial services at Petrokemya Chemical (SABIC)
Duration: 20-Nov 2012 to 22-Dec 2012
• Jobs: Maintenance of Tanks, Heat Exchangers, Towers, Reactors and Replacement of Piping
8" & 6"from CS To SS Material.
• Worked with AL-Barrak industrial services at Yanbu Crude oil tank form (Saudi Aramco)
Duration: 28-Nov 2011 to 23-Dec 2012
• Jobs: Replacement of piping & Valves, Thermocouple, Maintenance of Furnace and Rotary
(Motors & Pumps)
Job Responsibilities
1) Prepare Primavera Plan as per Scope of Work.
2) Preparation of Planed S-Curve.
3) Planning & scheduling all activities according to site requirement..
4) Progress Monitoring on Daily Basis.
5) To establish activity durations and sequence for specific work disciplines.
6) To determine milestones to support project schedule.
7) Continuous communication with the Client for any revisions in the scope of work and tie in jobs.
8) Good Co-Ordination with Client.
Duration: 01-Jan 2012 to 30-Feb 2012
• Jobs: Extension Project of Piping.
• Worked with AL-Barrak industrial services at Saudi Iron Steel Hadeed (SABIC)
Duration: 5-Jun 2012 to 18-Aug 2012
• Jobs: Extension Project of Piping.
• Worked with AL-Barrak industrial services at Petrokemya Chemical (SABIC)
Duration: 22-Apr 2012 to 28-May 2012
• Jobs: Maintenance of Vessels, Heat Exchangers, Columns, Replacement and Modification of
Piping And Valves.
• Worked with AL-Barrak industrial services at Rastanura Refinery (Saudi Aramco)
Duration: 01-Mar 2012 to 14-Apr 2012
• Jobs: Maintenance of Heat Exchangers, Columns, Vessels and Filters.
• Worked with AL-Barrak industrial services At Juaymah Tank Form (Saudi Aramco)
• Worked with SIEMENS Engineering Limited at Kot Addu Power Corporation (KAPCO)
Duration: 02-Sep 2011 to 10-Nov 2011
• Worked with SIEMENS Engineering Limited at Kot Addu Power Corporation (KAPCO)
Duration: 18-Feb 2011 to 27-Apr 2011
• Jobs: Maintenance of Boiler & Turbines.
Job Responsibilities
1) Progress monitoring on daily basis.
2) To Control and check the man power and man hour.
3) Planning and monitoring consumption of direct material.
2
SIEMENS Engineering Limited ( T&I) (18-Feb 2011 to 10-Nov 2011)
Working as Area Planner
DESCON Engineering Limited Lahore, Pakistan (09-Oct 2008 to 29-Jan 2011)
Working as Quantity Surveyor
•• Worked with DESCON Engineering Limited at BYCO Petroleum Pakistan Ltd (Bosicor)
Duration: 06-Jan 2011 to 29-Jan 2011
•• Worked with DESCON Engineering Limited at ENGRO Chemical Pakistan Ltd.
Duration: 09-Oct- 2008 to 04-Jan 2011
•• Jobs: Maintenance of Boiler & Turbines.
Job Responsibilities
1) Joint & Spool Marking on isometric drawing.
2) Prepare piping BOM & BOQ.
3) Ensure the job has been performed as per latest revision.
4) Making as built drawing as per site modification.
5) Provide client supply material as per site demand from the warehouse.
6) As per site requirement raise indent direct & indirect material for procurement.
7) Monitor usage of Direct Material, Direct Consumable on daily basis.
8) Supervise the whole working of Planning (FEDC) department.
2009~2011 B-TECH in Mechanical Engineering
PIMSAT Lahore.
Passed in 1st Devision
PIMSAT University of Higher Education, Lahore 2005~2008 DAE in Mechanical Engineering
Punjab Board of technical Education, Lahore. 2005 Matriculation
Govt College of Technology Multan