Construction Manager
Descon Enginerring
Total years of experience :31 years, 8 Months
Acted as Construction Manager for SGD project EPC Package 2 and 3. Manage all 4 Unit total Piping Erection Inch Dia 252000, Support Fabrication and Pre-Commissioning including Sand Blasting, Painting, Insulation, Spools Transportation. Deftly coordinated with client and sub-contractors.
• Assisting the Construction Lead to ensure projects are delivered safely on time and to budget.
• Participation in constructability reviews to optimise construction safety and efficiency.
• Participation in Risk Assessments to establish Project Risk Registers.
• Reviewing construction work packages and ensuring construction work is carried out in accordance to the issued scope of work while adhering to the agreed HSE plan, quality plan and schedule.
• Assisting in the tender technical bid evaluations, in co-operation with the Projects Team.
• Ensuring the construction interfaces and coordination are managed efficiently, facilitating the swift resolution of any technical queries at site.
• Review and approval of Method Statements and Job Safety Analysis.
• Ensuring that all Permit to Work requirements are followed.
Deftly assessed
o EPC contractor construction planning, logic, schedules, organization plans and manning plans, and detailed procedures.
o Subcontract plans, subcontract documents and schedules.
o Development of temporary facilities
o Mechanical completion plans and Pre-Commissioning Manual.
Successfully managed the construction during EPC to meet performance parameters as per the Statement of Requirements.
Ensured that all actions, works and services performed by EPC Contractor were in accordance with the respective Agreement with company.
Adhered to the company's objectives, requirements, priorities, policies, procedures, standards, rules, regulations and guidelines.
Provided cost-effective solutions in Engineering Design while maintaining quality, constructability, operability and maintainability.
Pivotal in ensuring that project was technically sound & optimally designed, engineered to appropriate standards and specifications as per the required product specification and HSE requirements.
Tracked the progress of work at site against the project schedule and recommended actions to correct any delays.
Instrumental in providing on-site construction consultation during Construction, Pre-Commissioning & Commissioning stages.
Performed as Construction Manager for Gas Co. Project. Managed all site construction activities (56”@48” GRE/GRV Pipelines and Valve Chamber Maintenance Pit, excavation of pipe trench, etc.).
Managed the construction of RGX-6 Project, \[Fabrication-shop and Site\]. Handled the total Piping and related support Fabrication .Executed Erection and Pre-Commissioning including Sand Blasting, Painting, Insulation, Spools Transportation. Deftly coordinated with client and sub-contractors
Diploma in Mechanical Engineering Passed 1992 April with ' First Class ', B.Tech in Mechanical Engineering passed 2012 with grade - 'A'