Projects Manager
OZCO group / Al-Diyafa real estate CO.
Total des années d'expérience :20 years, 1 Mois
Projects:
Al Dyiafa mall - Holy city of Makkah.
Tasks & Responsibilities:
Facility management and operations.
Maintenance team works directing and managing.
Shops fit out supervising and directing.
Relations management with tenants during fitting out phase.
Development projects leading, achieving, and delivering.
Projects:
1. TEMA Tahinah and confectionary factory,
2. Dairy Products factory ( Cortina plant B) for breakfast cream and yogurt products.
3. Arabian Sweets factory ( Almealim Factory)
4. Dates factory ( Nadyia Factory)
5. Almadinah Almnouarah warehouse
6. ALkhomra warehouses in Jeddah
Tasks & Responsibilities:
Ensure operation & project's requirements of the factories projects complying regulatory stipulation.
Establish project plan and feasibility study in accordance with operation standards.
Establish connections with consultancy offices approved by Modon, , align the exact and veritable requirements understood.
Review all outputs of consultancy offices in regard the layout design, structural, electromechanical and HVAC designs and drawings.
Approve BOQs, Specifications, and technical standards submitted by consultancy office.
Ensure construction work permit issuing and relevant permits issuing like civil defense, environment permit.
Prepare contracting and bid documents. Managing communication with stakeholders.
Ensure that contractors and other project parties apply all safety requirement.
Participate in machine selection and specification.
Participate with operation team in process mapping and lean manufacturing applying to factory.
Participate with operation to apply ISO standards and food safety regulations.
Leading development projects in factories.
Projects:
1. Villas compound:
1.1 - Alsameriah 28 villa - Obhour district
1.2- ALhamrah 5 villas - ALhamrah district
1.3- 3 villas - Alshatee district
1.4- 16 villas - Albandar - Obhour district
2. Hotels:
2.1- Alzahra suites - Almadinah road.
2.2- Alsalamah - Quraish Street.
2.3- Heraa street hotel.
2.4- Alhamraa suites - ALandalus district.
3. Residential:
3.1- Alnahdah residential building project
Tasks & Responsibilities:
Participate to prepare the feasibility study of the project ( regulations, objectives, market surveys, customer’s needs, areas calculations, floor numbers selection, preliminary budgets based on previous records and experience, all technical aspects necessary for FS)
Conduct the architectural proposals with the architect engineer.
Conduct the process of issuing land papers (KROKI, deeds, land surveys)
Issuing the construction permit through consultancy office.
Review and approve designs (structural, Electrical, Plumbing, HVAC), BOQs, Specs from consultancy office.
Conduct interior design process.
Conduct and direct project management activities (projects plan, budgets, time schedules, communication plan, reporting, construction works as per project management standards) .
Participate with the sales team while advertising and selling the propriety. (mock ups - advertising materials preparation - presentation to costumers)
Ensure the maintenance and well operating of facilities after startup and along operation.
Projects:
Movennbic hotel ALKHUORAFY company,
ALZAHRYAH library rehabilitation,
BEIT ALBAROUDY rehabilitation works.
Tasks & Responsibilities:
Supervising rehabilitation works for the historical buildings of Damascus old city.
Participate in preparing rehabilitation studies for sensitive historical sites.
Participate to prepare of building code specialized for old sites in Damascus city.
Participate with historical documentation project of old sites in Damascus city.
Structural Design for projects (concrete design, Steel design),
Preparing bills of quantities,
Preparing list of technical specification for each item in the design,
Achieving structural drawings,
Site consultancies.
Projects:
HAMAH Hospital 200 bed, 3 Story,
Jamal Abd ALNASSER Hotel, 7 Stories,
Administration Building in Alqunitra,
Ministry of Environment Desalination sewage water station in Alraqad valley,
Afordable Residential house Project, Type A :8 stories, Type B: 11 Stories in Homs,
Rehabilitation of buildings Ras Al Ain after the problem of soil erosion one axis : national hospital, 3 secondary schools, 9 residential buildings.
Testing and Experimenting mechanical specifications of earth soil materials to be used as a construction materials in reinforcement with many type of cement types. Publication : Bui, Q.B.; Morel, J.C.; Reddy, B.V.V.; Ghayad, W. Durability of rammed earth walls exposed for 20 years to natural weathering. Build. Environ. 2009, 44, 912–919.
Structural Engineer