Formwork and scaffolding Operations Manager
Aljaber Engineering
Total years of experience :20 years, 4 Months
1- Formwork and scaffolding division manager
2- Manging all FMK and Scaffolding works in the company projects (Design, BOQ, Pricing, Delivery and logistics, Training for erection and pre-concrete inspection.
3- Leading team of formwork and scaffolding 4 engineers, 6 draftsmen, 8 supervisors 18 foremen and 100 scaffolder
4- Manging the site methods and work sequence
5- Involved in the projects tender stage
6- Preparing the Formwork agreements and contracts
7- Managing the logistics team and store team.
LRT Project (Lusail rail transit) Metro and tramway project
Project value is 12 billion QAR
Consultant : Parsons Aecom
Client : Qatar rail
- Lead the interface team (Civil - MEP - Arch ) engineers
- Identify the possible interfaces between the different entities in the Project
- Edit the Interface coordination documents
- Prepare for the interface coordination meetings between the entities to solve the interfaces in design stage and in construction stage
- Check entities scope of work
- check and comment the raised ICDs by the project partners
Senior Methods Engineer
QDVC (Qatar Diar&Vinci construction)
Project: Lusail LRT (light rail transit) Project
Metro and tramway project
Project value is 12 billion QAR
Consultant : Parsons Aecom
Client : Qatar rail
Position: Chief Methods Engineer
Duration: November 2013
Company: QDVC (Qatar Diar&Vinci construction)
Company Industry: Construction
Location: Doha, Qatar
Department: Methods department
Job Responsibilities
Managing methods team 2 methods engineer 9 draftsmen
Create construction sequence drawings
Create site installation drawings, excavation, formwork and traffic management Design formwork drawings and scaffolding erection drawings
Propose site lifting methods (crane locations and types)
Reporting to the methods manager
Senior Rebar Methods Engineer
QDVC (Qatar Diar&Vinci construction)
Project: Lusail LRT (light rail transit) Project
Metro and tramway project
Project value is 12 billion QAR
Consultant : Parsons Aecom
Client : Qatar rail
Position: Senior Rebar Methods Engineer
Duration: October 2012 till now
Company: QDVC (Qatar Diar&Vinci construction)
Company Industry: Construction
Location: Doha, Qatar
Department: Methods department
Job responsibilities :
Senior Rebar Methods Engineer
Managing 2 rebar engineers, 1 rebar S/C and 3 rebar suppliers
Reporting to the methods manager
Create rebar methods (prefab cages and fixing sequence) to facilitate rebar fixing on site
Coordinating with the designer for drawings production according to construction planning
Rebar drawings review to match with construction sequence and Formwork drawings
Managing Rebar delivery from 3 rebar suppliers for 8 under ground stations, 4 at grade stations and Viaduct
Preparing 3 month look ahead for project rebar Required quantities
Finding the techniques to solve site fixing problems
Preparing the rebar lifting methods
Leading the Rebar s/c and supplier meetings
Kharafinational for Electrical & Mechanical Works S.AE
Egypt: Kharafinational for Electrical & Mechanical Works S.AE Position: Project Engineer
Project Name: Dammeitta Simple Cycle Power Plant
500 MW Gas Turbine Project (Fast Track Project).
Category: Industrial Projects
Project Description: Plot Area: 45, 000 m2
Four Gas Turbines 4×125 MW
Two Bruch + Two Elin (From General Electric) with skids
Contract Value: 320 Million U.S Dollars.
Contract Duration: Six Months for the plant firing
Client: Ministry of Electricity and Energy, East Delta Electricity Production Co (EDEPC)
Consultant: Power Generation Engineering and Service Company (PGESCO)
Roles and Responsibilities: Responsible for two Power Islands #1& 2 and GIS
Supervise Piles work for Power Island.
Pedestal (Turbine Foundation) civil work and embedded items
Co-ordinate with General Electric Energy Co. as a vendor for turbines for their requirements
Grouting works for sub soul plates and anchors above pedestal
Pulling chambers work and review the network with Vendor drawings.
Piping trenches work and review with mechanical vendor drawings.
External Electrical Manholes and review buildings builder work according
Network and above ground utilities
Surround skids and its requirements reference to vendor such as embedded
Items in concrete
Co-ordinate with underground utilities for implementation plan.
Monitor safety inside Power Island.
Responsible for Steel structure erection in GIS (gas isolation switch gear) building and all finishing works.
Project engineer
Kharafinational for Electrical & Mechanical Works S.AE
Project: WWTP Wathba Water Treatment Plant
Employer: Kharafi National Company & Biwater
Consultant: ILF, Fishtner & ADWEA
Contractor: Kharafi National Company
Job: Project Engineer
Project description:
The project is a sewage water treatment plant located at Abu Dhabi with a cost around 1.2 billion dirham’s.
The project consists of several parts such as pump stations, sedimentation tanks, digester, aeration & chlorine tank.
My scope was constructing the IPS Inlet Pump Station, Screening building & sand& grease trap
It contains slope walls 6m height 40m long, pump station height was 30m all my scope around 17000 meter coupe
Responsibilities
Responsible for execution of Inlet chamber, Inlet pumping station, screening building and sand & grease trap
Following drawings, coordinating with QC engineer, mechanical engineer, planning engineer and electrical engineer,
Following design of the special shutter, climbing shutter and scaffolding work
Leading the team work for progress and following the time schedule under safe condition
Responsible for concrete surface lining (epoxy coating, GRB, Polyurya lining)
Section Engineer
Rowad Modern Engineering & Vinci Grand Projects
Project: Metro Algeria
Employer: Algerian Ministry of transport.
Consultants: SYSTRA (ECPE)
Subcontractor: Rowad Modern Engineering
Contractor: VINCI Grand Projects & EIMENS S&CAF
Job: Section manager of El Anasser Site
(PHT Metro main electrical substation and transformer building) - (PR main control building) (PCC central administrative and control building 9+ basement)
Metro Work Shop of Maintenance at Bach Djerah Alger
Reporting Project Manager.
Flowing of production Rates.
Planning & scheduling and updated it’s weekly.
Coordinating with the consultant and the main contractor.
Coordinating bet. Form works and rebar works.
Checking for All Drawing and comparing bet. Its.
Rebar manager (power house section)
Vinci construction grand projects, Bilfinger Berger & Orascom JV
Project: new Naga Hammadi barrage and hydropower plant .450 million euro .
Employer: ministry of water resources & irrigation (reservoir &grand barrage sector) & ministry of electricity.
Consultants: New Naga Hammadi barrage development consultants (Lahmayer Int’l, Sogreah, Electrowatt )
Contractor: Vinci construction grand projects, Bilfinger Berger & Orascom JV.
Rebar manager (power house section) June 2006 till December2006
Manager for all reinforcement installation works in the section, carried out by subcontractor and JV personal
Reporting directly to barrage manager Managed the works of subcontractor staff of two engineers, 3Supervisors and100 steel fixers.
Supervision of Rebar installation works including works preparation and installation procedures
Coordination of delivery logistic with rebar yard
Coordination of design with the consultant and technical office
Preparation of quantity reports and material orders
Preparation of weekly planning and monthly forecast based on the construction schedule
Preparing and leading of weekly production meetings
Following up of checking and inspection procedures
Responsible for reinforcement works for powerhouse section amounting to 20, 000 tons
Site engineer Responsible for rebar works in site
Vinci construction grand projects, Bilfinger Berger & Orascom JV
Preparing daily construction reports
Checking permanent the quality and grade of completion of executed works, ensuring successful final inspections by consultant engineer
Preparation and follow up all the steps necessary to fulfil the requirement of the JV’S plan
Responsible for the survey works to adjust the rebar according to the concrete drawings and rebar drawings
Site Engineer
Upper Egypt dredging company
Project: covered drainage net in EL Edisia - qena 3million ₤
Employer: ministry of irrigation
Contractor: Upper Egypt dredging company
Make the drainage net for 2800*4200m2
Responsible for the pipes delivery from ministry factories and order according the work progress
Coordination the site machines (excavators & dredging machines).
Make all the invoices with the employer to the company and from the company to the subcontractor.
Responsible for the quantity survey and reports showing the work progress
Tender engineer
Dredging company
- Studying the projects before starting work
- Making time schedules for the company projects
- Reporting directly the head of the company by the results and the progress in all the projects according to the reports which made by the site engineers.