wael Radwan, Formwork and scaffolding Operations Manager

wael Radwan

Formwork and scaffolding Operations Manager

Aljaber Engineering

Location
Qatar - Doha
Education
Bachelor's degree, Civil engineering
Experience
20 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 4 Months

Formwork and scaffolding Operations Manager at Aljaber Engineering
  • Qatar - Doha
  • My current job since October 2017

1- Formwork and scaffolding division manager
2- Manging all FMK and Scaffolding works in the company projects (Design, BOQ, Pricing, Delivery and logistics, Training for erection and pre-concrete inspection.
3- Leading team of formwork and scaffolding 4 engineers, 6 draftsmen, 8 supervisors 18 foremen and 100 scaffolder
4- Manging the site methods and work sequence
5- Involved in the projects tender stage
6- Preparing the Formwork agreements and contracts
7- Managing the logistics team and store team.

Interface Manger at QDVC (Qatari diyar - Vinci construction) - ALSTOM
  • Qatar - Doha
  • July 2015 to October 2017

LRT Project (Lusail rail transit) Metro and tramway project
Project value is 12 billion QAR
Consultant : Parsons Aecom
Client : Qatar rail
- Lead the interface team (Civil - MEP - Arch ) engineers
- Identify the possible interfaces between the different entities in the Project
- Edit the Interface coordination documents
- Prepare for the interface coordination meetings between the entities to solve the interfaces in design stage and in construction stage
- Check entities scope of work
- check and comment the raised ICDs by the project partners

Senior Methods Engineer at QDVC (Qatar Diar&Vinci construction)
  • Qatar - Doha
  • November 2013 to July 2015

Senior Methods Engineer
QDVC (Qatar Diar&Vinci construction)
Project: Lusail LRT (light rail transit) Project
Metro and tramway project
Project value is 12 billion QAR
Consultant : Parsons Aecom
Client : Qatar rail
Position: Chief Methods Engineer
Duration: November 2013
Company: QDVC (Qatar Diar&Vinci construction)
Company Industry: Construction
Location: Doha, Qatar
Department: Methods department
Job Responsibilities
 Managing methods team 2 methods engineer 9 draftsmen
 Create construction sequence drawings

 Create site installation drawings, excavation, formwork and traffic management Design formwork drawings and scaffolding erection drawings
 Propose site lifting methods (crane locations and types)
 Reporting to the methods manager

Senior Rebar Engineer at QDVC (Qatari Diar - Vinci construction
  • Qatar - Doha
  • September 2012 to October 2013

Senior Rebar Methods Engineer
QDVC (Qatar Diar&Vinci construction)
Project: Lusail LRT (light rail transit) Project
Metro and tramway project
Project value is 12 billion QAR
Consultant : Parsons Aecom
Client : Qatar rail
Position: Senior Rebar Methods Engineer
Duration: October 2012 till now
Company: QDVC (Qatar Diar&Vinci construction)
Company Industry: Construction
Location: Doha, Qatar
Department: Methods department

Job responsibilities :
Senior Rebar Methods Engineer
Managing 2 rebar engineers, 1 rebar S/C and 3 rebar suppliers
 Reporting to the methods manager
 Create rebar methods (prefab cages and fixing sequence) to facilitate rebar fixing on site
 Coordinating with the designer for drawings production according to construction planning
 Rebar drawings review to match with construction sequence and Formwork drawings
 Managing Rebar delivery from 3 rebar suppliers for 8 under ground stations, 4 at grade stations and Viaduct
 Preparing 3 month look ahead for project rebar Required quantities
 Finding the techniques to solve site fixing problems
 Preparing the rebar lifting methods
 Leading the Rebar s/c and supplier meetings

Project engineer at Kharafinational
  • Egypt - Damietta
  • October 2010 to August 2012

Kharafinational for Electrical & Mechanical Works S.AE
Egypt: Kharafinational for Electrical & Mechanical Works S.AE Position: Project Engineer
Project Name: Dammeitta Simple Cycle Power Plant
500 MW Gas Turbine Project (Fast Track Project).
Category: Industrial Projects
Project Description: Plot Area: 45, 000 m2
Four Gas Turbines 4×125 MW
Two Bruch + Two Elin (From General Electric) with skids
Contract Value: 320 Million U.S Dollars.
Contract Duration: Six Months for the plant firing
Client: Ministry of Electricity and Energy, East Delta Electricity Production Co (EDEPC)
Consultant: Power Generation Engineering and Service Company (PGESCO)

 Roles and Responsibilities: Responsible for two Power Islands #1& 2 and GIS
 Supervise Piles work for Power Island.
 Pedestal (Turbine Foundation) civil work and embedded items
 Co-ordinate with General Electric Energy Co. as a vendor for turbines for their requirements
 Grouting works for sub soul plates and anchors above pedestal
 Pulling chambers work and review the network with Vendor drawings.
 Piping trenches work and review with mechanical vendor drawings.
 External Electrical Manholes and review buildings builder work according
 Network and above ground utilities
 Surround skids and its requirements reference to vendor such as embedded
Items in concrete
 Co-ordinate with underground utilities for implementation plan.
 Monitor safety inside Power Island.
 Responsible for Steel structure erection in GIS (gas isolation switch gear) building and all finishing works.

Project engineer at Kharafinational
  • United Arab Emirates - Abu Dhabi
  • January 2009 to October 2010

Project engineer
Kharafinational for Electrical & Mechanical Works S.AE
Project: WWTP Wathba Water Treatment Plant
Employer: Kharafi National Company & Biwater
Consultant: ILF, Fishtner & ADWEA
Contractor: Kharafi National Company
Job: Project Engineer
Project description:
The project is a sewage water treatment plant located at Abu Dhabi with a cost around 1.2 billion dirham’s.
The project consists of several parts such as pump stations, sedimentation tanks, digester, aeration & chlorine tank.
My scope was constructing the IPS Inlet Pump Station, Screening building & sand& grease trap
It contains slope walls 6m height 40m long, pump station height was 30m all my scope around 17000 meter coupe
Responsibilities
 Responsible for execution of Inlet chamber, Inlet pumping station, screening building and sand & grease trap
 Following drawings, coordinating with QC engineer, mechanical engineer, planning engineer and electrical engineer,
 Following design of the special shutter, climbing shutter and scaffolding work
 Leading the team work for progress and following the time schedule under safe condition
 Responsible for concrete surface lining (epoxy coating, GRB, Polyurya lining)

Section engineer at Rowad Modern Engineering & Vinci Grand Projects
  • Algeria - Algiers
  • February 2007 to December 2008

Section Engineer
Rowad Modern Engineering & Vinci Grand Projects
Project: Metro Algeria
Employer: Algerian Ministry of transport.
Consultants: SYSTRA (ECPE)
Subcontractor: Rowad Modern Engineering
Contractor: VINCI Grand Projects & EIMENS S&CAF
Job: Section manager of El Anasser Site
(PHT Metro main electrical substation and transformer building) - (PR main control building) (PCC central administrative and control building 9+ basement)
Metro Work Shop of Maintenance at Bach Djerah Alger
 Reporting Project Manager.
 Flowing of production Rates.
 Planning & scheduling and updated it’s weekly.
 Coordinating with the consultant and the main contractor.
 Coordinating bet. Form works and rebar works.
 Checking for All Drawing and comparing bet. Its.

Rebar Manager at Vinci construction
  • Egypt
  • June 2006 to January 2007

Rebar manager (power house section)
Vinci construction grand projects, Bilfinger Berger & Orascom JV
Project: new Naga Hammadi barrage and hydropower plant .450 million euro .
Employer: ministry of water resources & irrigation (reservoir &grand barrage sector) & ministry of electricity.
Consultants: New Naga Hammadi barrage development consultants (Lahmayer Int’l, Sogreah, Electrowatt )
Contractor: Vinci construction grand projects, Bilfinger Berger & Orascom JV.
Rebar manager (power house section) June 2006 till December2006
Manager for all reinforcement installation works in the section, carried out by subcontractor and JV personal
 Reporting directly to barrage manager Managed the works of subcontractor staff of two engineers, 3Supervisors and100 steel fixers.
 Supervision of Rebar installation works including works preparation and installation procedures
 Coordination of delivery logistic with rebar yard
 Coordination of design with the consultant and technical office
 Preparation of quantity reports and material orders
 Preparation of weekly planning and monthly forecast based on the construction schedule
 Preparing and leading of weekly production meetings
 Following up of checking and inspection procedures
 Responsible for reinforcement works for powerhouse section amounting to 20, 000 tons

Site Engineer at Vinci construction
  • Egypt
  • January 2005 to June 2006

Site engineer Responsible for rebar works in site
Vinci construction grand projects, Bilfinger Berger & Orascom JV
 Preparing daily construction reports
 Checking permanent the quality and grade of completion of executed works, ensuring successful final inspections by consultant engineer
 Preparation and follow up all the steps necessary to fulfil the requirement of the JV’S plan
 Responsible for the survey works to adjust the rebar according to the concrete drawings and rebar drawings

Site Engineer at Upper egypt dredging company
  • Egypt - Luxor
  • April 2004 to December 2004

Site Engineer
Upper Egypt dredging company
Project: covered drainage net in EL Edisia - qena 3million ₤
Employer: ministry of irrigation
Contractor: Upper Egypt dredging company
 Make the drainage net for 2800*4200m2
 Responsible for the pipes delivery from ministry factories and order according the work progress
 Coordination the site machines (excavators & dredging machines).
 Make all the invoices with the employer to the company and from the company to the subcontractor.
 Responsible for the quantity survey and reports showing the work progress

Tender Engineer at Upper Egypt dredging company
  • Egypt - Luxor
  • January 2004 to March 2004

Tender engineer
Dredging company
 - Studying the projects before starting work
 - Making time schedules for the company projects
 - Reporting directly the head of the company by the results and the progress in all the projects according to the reports which made by the site engineers.

Education

Bachelor's degree, Civil engineering
  • at Assiut University
  • May 2003

Specialties & Skills

Concrete
PowerPlant
Civil Engineering
Autocad
communication
Formwork
Scaffolding
Concrete
Utilities
Power plant
MS office
Sewage treatment plant
Reinforcement

Languages

Arabic
Expert
English
Expert
French
Intermediate

Memberships

Egyptian Engineers Syndicate
  • member
  • November 2003

Training and Certifications

Vinci training programme (Orchestra) (Training)
Training Institute:
Vinci construction
Cranage and lifting (Training)
Training Institute:
Kharafinational
Nebosh (Training)
Training Institute:
Enartech- Qatar
Concrete Anchors (Training)
Training Institute:
ACI
PMP (Training)
Training Institute:
Mica - Qatar
Revit (Training)
Training Institute:
Promedia
Microsoft - EXCEL (Training)
Training Institute:
Apteck-Qatar

Hobbies

  • Swimming
  • Kung Fu