Assistant Manager
Hisooper Gas Pvt Ltd Nankana Sahib
Total years of experience :13 years, 3 Months
Provided maintenance support to machinery and equipment.
Liaised with different departments and schedule repair and maintenance works.
Reviewed plant conditions and prepared presentation on prevailing issues.
Identified electrical faults and applied preventative maintenance measures.
Modified and improved functions of machinery and equipment.
Installed, tested, and repaired a wide range of latest electrical equipment.
Followed Company's guidelines and policies and scheduled work.
To ensure the efficient testing of Power Transformers at Grid System Operation at the event of any fault and to resume the power supply by rectifying the fault.
To coordinate the examination and repair of damaged transformers.
To analyze transformer failures, decide if unit should be repaired or junked. Provided technical assistance to staff for operation.
To maintain overall reliability through co-ordination of distribution levels, transformer loading's and customer demand. To prepare Loss reduction schemes to prepare Arial Bundle Conductor schemes against theft.
To co ordinate with all relevant centers, departments and customers for technical aspects and queries of buchhloz tripping consisting of normal as well as major faults and its resolutions.
To prepare the technical reports and new strategies during the testing at site for the purpose of reduction in tripping and other faults. To design control and protection scheme for the transformers at substations.
Inspection of WEIDMAN Insulation Material at supplier’s site is carried out. Improve and boost the handling of projects to obtain the optimum feedback
I have done Bsc electrical engineering with strong technical concepts