Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Zuhair Hassan, Sr. Project Architect

Zuhair Hassan

Sr. Project Architect·TC Consultancy - FZC

United Arab Emirates

Master's degree, Architecture

Work experience

Total years of experience: 23 years, 7 months

Sr. Project Architect

January 2012 - Present

TC Consultancy - FZC

Abu Dhabi, United Arab Emirates

January 2012 - Present

. Project: Interior Fit-out works for the Ministry of Labour new HQ
A PROJECT CONTRACT

. The company is specialized in project management with offices in Sharjah, Abu Dhabi & Doha. Reporting to Director, Eng. Thomas Chacko. Contracted for the project design & coordination.

. Responsibilities:

- Consulted and followed-up with the client (Ministry of Labour - Technical Committee)
- Site visits and solution of critical design issues according to the as-built and site conditions
- Developed design proposals & coordinated with building owner & consultant for approvals
- Prepared tender documents, technical report charts till awarding of the contractor
- Conducted design workshops with contractor followed by reviews for ARCH Shop Drawings
- Communicated with authorities representatives (NOC), coordinated with ID & MEP engineers
- Part of the commissioning team for handing over of the job (reports & related documents)

Company industry:
Business Consultancy Services
Job role:
Architecture

Design Architect

November 2009 - November 2011

Schlumberger – Technical Services Inc.

Dubai, United Arab Emirates

November 2009 - November 2011

. Project: Various Overseas Projects

. In 2006 the world’s No. 1 oilfield services provider established an in-house Engineering & Construction department (E&C) stationed in Houston, Paris and Dubai - HQ for Middle East, Asia geo-markets (MEA). Projects were oilfield bases, offices, warehouses and staff housing vary between new, renovation and extension. HQ to approve projects exceeding USD 20 mn.

. Responsibilities:

- Consulted and followed-up with clients (oilfield segment heads or geo-markets managers) and project team members to determine project requirements and standards
- Developed design with initial cost and specifications and handed-out to awarded consultant
- Prepared a full review for the design drawings and documents submitted by consultants
- Coordinated with project managers to monitor compliance with design and specifications
- Delivered timely framed tasks for: Iraq, Saudi Arabia, Qatar, Bahrain, Russia, Kazakhstan, India, Malaysia and Australia - meeting different countries codes with company standards
- Introduced CAD standards, office templates and codes, plus previous work documentation
- Conducted training sessions, passed tests and certified all QHSE company’s requirements

Company industry:
Oil & Gas
Job role:
Architecture

Senior Architect

March 2008 - August 2009

China State Construction Engineering Corporation

Dubai, United Arab Emirates

March 2008 - August 2009

. Project: Creek Front Development - Dubai & City Of Lights - Abu Dhabi

. The Beijing based firm ranking No. 7 Top Global Contractor in both 2007 & 2008 as listed in www.enr.com. CSCEC has been awarded as the Design & Build contractor for Creek Front Development, a mixed-use project at Business Bay (AED 1.5 bn) hotel, 6 residential towers and retailing outlet in 24, 500 sqm. Later, joined new 5 high-rises (3B+G+42) City Of Lights, Al Reem Island, Abu Dhabi (AED 1.8 bn). Reporting to Chief Design Engineer, Zhu Jianchao.

. Responsibilities:

- Worked on high-rises of apartments, offices, 5 star hotel, shopping mall and recreations
- Revision of Location Analysis & Design Control from developer (Dubai Properties / Tamouh)
- In charge to lead coordination of all architectural related tasks between client, government zoning authority (TECOM / AD Municipality) and different consultancies
- Cooperation with design consultant (CCDI / P&T) in Conceptual, Preliminary and Detailed Design stages to comply with Dubai’s building regulations and client outlined requirements
- Part of the management role was assessment of prequalification and quotations from required services suppliers and their conveniences to the overall designed criterias
- Prepared ARCH specifications and submission to the client alongside with ID material board
- Raised up RFIs to consultant and supervised production of architectural shop drawings
- Worked man-to-man with LEED consultant to achieve the USGBC LEED Gold certification: Project registration, energy modeling, occupancy report and LEED NC credits follow up
- Conducted workshops, attended meetings, visited sites of relevant required services

Company industry:
Construction & Building
Job role:
Architecture

Project Architect

June 2004 - March 2008

Dorsch Gruppe – DC Airports

Khartoum, Sudan

June 2004 - March 2008

. Project: Khartoum New Int’l Airport

. This German company is one of the engineering consultancy leaders in Europe, taking role in Khartoum New Int'l Airport, the country's 2nd largest project (USD 2.0 bn) as the Project Consultant. Reporting to Project Director, Mr. Albert Mair, while managing local team of 4 architects. Architectural packages in association with Leit-Werk Architecture & Design, UK.

. Responsibilities:

- Architectural design management from Masterplan through Preliminary to Detailed Design:
1. Hajj PAX terminal 2. Commercial core (hotel, shopping mall & business centre)
3. Mosque & landscape 4. Staff housing 5. Bus terminals
- Prepared Khartoum Sub-regional Plan documentation - an urban planning study
- Worked with other consultants for different services (MEP, Landscape, Environment.. etc) and Ministry of Urban Planning, State of Khartoum, Civil Aviation & Civil Defence authorities
- Technical coordination between Khartoum and London, and supervision of local team
- Construction supervision for the LCC phase (Local Contract Constructions)
- Design management and project coordination throughout all design and tendering stages
- Followed up and conducted meetings with the client and handed over weekly progress reports and presentations (KNIA Project Implementation Unit, The Republic Presidency)

Company industry:
General Engineering Consultancy
Job role:
Design, Creative, and Arts

Site Architect

December 2003 - May 2004

Altakamul Alhandasi Arch. & Consultants

Khartoum, Sudan

December 2003 - May 2004

. Project: Existing Khartoum Int’l Airport

. From main office in Dubai, AA was commissioned for some projects in Khartoum, the major was extension of Int’l Departure Terminal and renovation of Domestic Terminal in existing Khartoum Int’l Airport. Leading 2 inspectors, reporting to Project Manager, Kamal Saliem.

. Responsibilities:

- Shop drawings reviews and comments, approvals of ARCH and ID submittals
- Coordination with sub-consultants and facilities suppliers
- Prepared site weekly reports & presentations to the client (Sudan Civil Aviation Authority)
- Communications and updates follow up between Khartoum and Dubai offices
- Submitted all required constructions/installations under cost and quality control
- Checked up drawings (from Dubai) and followed instructions for producing on-site details

Company industry:
Architecture
Job role:
Architecture

Const. Sup. Architect

July 2002 - October 2002

Hamdi Consulting Group

Khartoum, Sudan

July 2002 - October 2002

Project: Central Bank of Sudan HQ

. The group is a well-recognized consulting bureau in Sudan, responsible for the design and supervision of new headquarters of Central Bank of Sudan (USD 42 mn) one of the major multi-storey buildings in Khartoum. Reporting to General Manager, Arch. Mohamed Hamdi.

. Responsibilities:

- Revisions and approvals for aluminum cladding, internal wall ceiling and landscape finishes
- Checked Front-of-House shop drawings in accordance to tender drawings & documents
- Prepared site work weekly reports to the client (Central Bank of Sudan)
- Submitted all required constructions / installations under cost and quality control
- Followed up and attended meetings with the client & contractor and prepared minutes

Company industry:
Architecture
Job role:
Architecture

Junior Architect

July 2001 - June 2002

Centre for Housing Studies – University of Khartoum

Khartoum, Sudan

July 2001 - June 2002

. Project: Archi./Housing/Urban

. A Uni. of Khartoum institution, undertakes architecture, housing and urban design projects. Appointed for the job as one of the best 4 GPA graduates, supervised by Dr. Seif Hassan.

. Responsibilities:

- Prepared conceptual and design drawings and 3D models by stages
- Prepared technical working drawings; upon client requests / project conditions
- As part of the team, won competitions for 2 different large scale projects (No. 1 & 4)
- Increased the productivity of 3D concepts by launching the use of ArchiCAD in office

Company industry:
Architecture
Job role:
Design, Creative, and Arts

Education

Swiss Federal Institute of Technology (ETH)

October 2003

October 2003

Master's degree, Architecture

Switzerland

GPA (percentage): 83.33%

GPA (percentage): 83.33%

MAS (Masters of Advanced Studies) in Architecture Building in Developing Countries – Urban Design ETH ranks the world’s 8th uni. in engineering: TopUniversities.com

University of Khartoum

July 2001

July 2001

Bachelor's degree, Architecture

Sudan

GPA (percentage): 78.3%

GPA (percentage): 78.3%

BSc (Bachelors of Science) Honours in Architecture 2nd Class Upper (GPA 78.3 of 100) – Awarded 3rd best GPA graduate

Skills

Design Management
Expert
Design Management
Expert
Project Coordination
Expert
Project Coordination
Expert
Interior Architecture
Expert
Interior Architecture
Expert
LEED Consulting
Expert
LEED Consulting
Expert
AutoCAD (2D & 3D)
Expert
AutoCAD (2D & 3D)
Expert
MS Project
Beginner
MS Project
Beginner
Adobe (Photoshop, Illustrator & InDesign)
Intermediate
Adobe (Photoshop, Illustrator & InDesign)
Intermediate
3D MAX
Beginner
3D MAX
Beginner
ArchiCAD
Expert
ArchiCAD
Expert
MS Office (Word, Excel & PowerPoint)
Expert
MS Office (Word, Excel & PowerPoint)
Expert
Revit
Intermediate
Revit
Intermediate
Design Management
Expert
Design Management
Expert
Project Coordination
Expert
Project Coordination
Expert
Interior Architecture
Expert
Interior Architecture
Expert
LEED Consulting
Expert
LEED Consulting
Expert

Languages

Arabic
Expert
English
Expert
German
Intermediate

Memberships

Green Building Certification Institute

Preparations for LEED AP Certification

May 2011

Sudan Engineering Council

Specialized Engineer Registration

December 2012

Sudanese Institute of Architects

Professional Architect Registration

October 2002

Training and Certifications

Training
Project Management Fundamentals course
Promastar (registered by PMi, USA)
Feb 2007
Training sessions and tests – certified all QHSE company’s requirements
Schlumberger MEA Loss Prevention Board
Feb 2010
Preparations for LEED AP Certification
AMIDEAST & American Uni. of Sharjah
May 2011
Airport Projects Preparatory Training + British Standards
Leit-Werk Architecture & Design (London)
Jul 2004