construction project manager
hydropower energy and general construction
Total years of experience :19 years, 8 Months
• Project management including control and monitor of schedule, cost etc
• Conidiation with disciplinary engineers in terms of project execution
• Coordination with client and consultant and different authorities
• Overall responsible for the project up to success full completion
• Technical support for mechanical and pipeline scopes
Construction supervision of Water, Sewerage and Storm Water networks and pumping stations
•Design and development of CS, DI and GRP and uPVC piping and pipelines including preparation of plan and profile drawings, isometric drawing hydraulic calculations, BOM etc
•Design and development Water /Sewage pumping station, including pump selection, development of GA drawing, material take off
•Planning and execution of piping and equipment erection work
•Installation and commissioning of various static and rotating equipment and corresponding documentation work, including centrifugal pumps, submerged pumps, butterfly/gate/control valves, Air compressors, HVAC systems, Chillers, Onsite Hyphochlorination generation systems, etc
•Testing and commissioning of water pipelines including hydro test, disinfection, and flushing, tie -in etc
•Procurement of Equipment and piping material, including negotiation with supplier, preparation of material submittal, FIRD, etc
•Estimating and pricing for new projects
•Preparing of Hydraulic calculations, Surge analysis and stress analysis
Projects handled
Infrastructure works for Emarati neighborhood, Zaid city Package# 4
Client - Musanada.
Maintenance of and operation of GEA ATLAS RAY 100 freeze drying plant .
•Maintenance of Ammonia Refrigeration system compressors up 700 KW cooling capacity.
•Maintenance of and operation of Evaporative cooling towers.
•Maintenance of and operation of Water tube boilers up to 800 Kg/Hr capacity.
•Maintenance of and operation of Stand by generators upto 1000 MVA .