Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Abdullah Abdul Fathah, Project Manager (Steel, Facade, Curtain wall, cladding & roofing)

Abdullah Abdul Fathah

Project Manager (Steel, Facade, Curtain wall, cladding & roofing)·ALCE Engineering Qatar.W.L.L, Doha, Qatar.

Qatar

Bachelor's degree, Mechanical Engineering

Work experience

Total years of experience: 18 years, 5 months

Project Manager (Steel, Facade, Curtain wall, cladding & roofing)

September 2017 - Present

ALCE Engineering Qatar.W.L.L, Doha, Qatar.

Doha, Qatar

September 2017 - Present

1. Supply & Installation of 6, 000m2 skylight glazing, Aluminum perforated celling fixtures, 2000 m2 SS laser cut cladding and 1100 tons of conical steel CHS for crystal walkway shading structure at Gewan Island - The Peal Qatar.
Client: UDC, PMC: KEO/F&G


2. Supply & Installation of 4, 300 m2 Rhenzink zinc roofing, 900m2 glazing and casted iron, brass grill and handrail works at the pearl Qatar - “ HE Shk.Hammad bin Jassim bin Al jabor Al Thani Mosque”
Client: HE.Shk.Al Jabor Al Thani, PMC: DARA consultants

3. Supply Installation Perforated Aluminum ceiling works at Waldorf Astoria Hotel - Lusail, Doha, Qatar
Contractor: Man Enterprise, Engineer/PMC: WSP/Turner &Townsend

Company industry:
General Engineering Consultancy
Job role:
Engineering

Project Manager

September 2017 - Present

ALCE Engineering Qatar

Doha, Qatar

September 2017 - Present

Projects Handled:

1. Supply & Installation of Curtain wall & Glazing Works at Al-Rayyan Stadium FIFA 2022 football stadium (6000 m2 curtain wall, 157 Glazed doors, 1800 m2 Aluminium louvers &1200 m glass balustrade)
Client: supreme committee, Contactor: L&T-Al-Balagh JV, PMC: AECOM

2. Supply & installation of acoustic membrane and SS welded mesh at Doha Oasis - Geyser & dragon towers; Contactor: REDCOALAMANA, PMC: ATKINS

3. Supply and installation of secondary steel, standing seam roofing, curtain wall, metal ceiling, wall cladding and sliding doors at Lusail LRT, AT-GRADE Fox station;
Client: Qatar Rail, Contactor: QDVC

Company industry:
Architecture
Job role:
Management

Sr.Project Enigneer - Facade/Finishing Works

May 2012 - August 2017

ALCE Engineering Qatar

Doha, Qatar

May 2012 - August 2017

Projects Handled:

1. Supply & Installation of Architectural Metal Ceiling works (Perforated Aluminium, stainless steel & Anodized aluminium, Expanded Mesh -18000 m2) at Qatar National Library, Qatar Foundation, Consultant: OMA-ASTAD/QP/QF - Main contractor: Multiplex Medgulf (JV).

2. Installation of Stainless Steel Armature media wall, Modular Display cases at Future Museum - CMC; Consultant: Louis Berger; Main contractor: REC/HBK J.V. (Complete Design & fabrication works joint ventured with M/S Tuchschmid - Switzerland & M/S Meyvaert - Belgium).

3. EPIC contract for main entrance leaf canopy includes 450 tons of structural steel, 65 tons of stainless steel CHS and 2200 m2 of spider glazing at SMRC (SIDRA) project, Contractor: OHL -Contrac JV; consultant: KEO

4. Supply & installation of Hospital entrance canopies consist of 100 tons of steel structure, 5000 m2 of stainless steel cladding and 2000 m2 of Aluminum composite cladding.

5. Installation of Architectural Metal Ceiling fixtures (Product of M/s ZAHNER, USA) at George Town University, Qatar Foundation, Consultant: ASTAD/QP/QF.

6. Supply & Installation of Stainless steel cladding at Student Housing - Qatar Foundation, Doha, Qatar (5, 000 sqm); Consultant: Louis Berger; Main contractor: J & P Qatar.

7. Design & Installation of weathering steel panels at College of Media & Communication, Qatar (6, 000 sqm); Consultant: Louis Berger; Main contractor: REC/HBK J.V.

8. Design, fabrication and installation of mandarin mesh ceilings and media mesh at College of Media & Communication, Qatar, contractor: GKD Germany.

9. Supply & installation of Museum of Islamic affairs terrace renovation works-it includes limestone raised flooring, glass balustrade and seasonable polycarbonate vestibules and SS screen/framed glass door. Contractor: lindner steel -Germany

Duties & Responsibilities’:

1. Overall project administration including project documents preparation such as: Method Statement, Quality Plan, HSE Plan.

2. Study of architectural drawings and the complete co-ordination for the shop drawing preparation & follow up for client approval.

3. Study of contract documents to clarify scope of works, responsibility, Terms & condition, payments.

4. Preparation of project plan/program, list of required materials, tools, accessories and manpower requirement for the project.

5. Manage complete work execution and work progress and safety at site.

6. Close co-ordination and attend various technical meetings with clients, consultants, main contractors, sub-contractors.

7. Managing technical staff such as Site in charge, Draftsman, Foremen, safety officer, Store Keeper and Technicians.

8. Checking the detailed fabrication order to workshop or supplier and complete material delivery follow-up.

9. Checking the quality of the materials received from workshop, monitoring the work progress as per the installation program and check the quality of works.

10. Raise the RFIT for the work-completed areas in order to obtain the approval on completed works from client.
11. Preparation of Invoice as per contract payment condition & follow up for payment certificates from client.

12. Making weekly progress reports and monthly payments to management.

13. Close co-ordination for Redline markup & as built drawing preparation and follow up for approval.

14. Preparation of O &M manual and other project close out documents

15. Follow up for project completion certificate & close out project accounts

Company industry:
Architecture
Job role:
Engineering

Project Engineer/Design Coordinator

January 2010 - March 2012

ETA (Electromechanical Technical Associates)

Doha, Qatar

January 2010 - March 2012

Projects Handled:

10. Supply & Installation of Architectural metal wire mesh cladding at Qatar Education City Convention Centre, Doha, Qatar (6, 000 sqm); Consultant: KEO Internationals; Main contractor: Baytur Contracting Co.

11. Design & Installation of Alucobond Composite Panel at Qatar University, Doha, Qatar (8, 000 sqm); Consultant: Arab Architect.

12. Design & Installation of Alubond Composite cladding at Al-Saad Sports Club, Doha, Qatar (3, 000 sqm); Consultant: Projacs Qatar; Main contractor: Tadmur Eng. & Cont. Co.

13. Design & Installation of Alucobond Composite Interior cladding at The Gate Project (salaam Tower), Doha, Qatar (2, 000 sqm); Consultant: MZ & Partners; Main contractor: MAN Enterprises

Company industry:
Architecture
Job role:
Engineering

Site Engineer

December 2007 - December 2009

ETA (Electromechanical Technical Associates)

Doha, Qatar

December 2007 - December 2009

Project Handled:

14. Supply & Installation of Unitized glazing system, Spider glazing, Sky light system (18500 m2) & Roof cladding (2800m2) at AL-BIDDA Platinum Tower, Doha, Qatar. Joint Venture with PMB Façade Tech. BHD.SDN - Malaysia

15. Supply & Installation of Alucobond Composite cladding at Al-Bidda Platinum Tower, Doha, Qatar (12, 000 sqm); Consultant: GHD; Main contractor: Higgs&Hills and QACC (JV).

16. Installations of 25 numbers of BESAM automatic sliding and revolving doors at various projects in Qatar

Company industry:
Architecture
Job role:
Civil Engineering

Education

Anna University

April 2007

April 2007

Bachelor's degree, Mechanical Engineering

India

GPA (percentage): 88%

GPA (percentage): 88%

Skills

Insurance
Expert
Insurance
Expert
Installation
Expert
Installation
Expert
QC
Expert
QC
Expert
Payments
Expert
Payments
Expert
Supply
Expert
Supply
Expert
 AutoCAD (AutoCAD 2008).
Intermediate
 AutoCAD (AutoCAD 2008).
Intermediate
Alpha Cam (For CNC Machine operation
Expert
Alpha Cam (For CNC Machine operation
Expert
PRO-Engineering
Intermediate
PRO-Engineering
Intermediate
MS-Project
Beginner
MS-Project
Beginner
MS-Office 2003 & 2007
Intermediate
MS-Office 2003 & 2007
Intermediate
Insurance
Expert
Insurance
Expert
Installation
Expert
Installation
Expert
QC
Expert
QC
Expert
Payments
Expert
Payments
Expert
Supply
Expert
Supply
Expert

Languages

English

Expert

Hindi

Intermediate

Malayalam

Beginner

Tamil

Expert