Ali Mubarak Ali Abdullah, Principal Project Engineer

Ali Mubarak Ali Abdullah

Principal Project Engineer

BORETS

Location
Kuwait
Education
Diploma, Electrical Engineering
Experience
16 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 6 Months

Principal Project Engineer at BORETS
  • Kuwait - Al Ahmadi
  • August 2016 to May 2019

Duties/Achievements include, but are not limited to:
• Introducing new methodologies to achieve high quality service with the best economical and technical efficiency for Kuwait operations.
• Actively interacting with customers and coordinating with the Company’s Regional Sales Managers and local Sales Representatives to execute the projects as designed.
• Preparing and issuing technical proposals including work scope, project plan and manpower plan for Field Service projects.

Special Projects Engineer at Schlumberger
  • Kuwait - Al Ahmadi
  • April 2013 to August 2016

• Installing successfully the first ZEiTECS Rigless Shuttles with Schlumberger equipment in 2013 for KOC, which lead to the later acquisition of ZEiTECS by Schlumberger in November 2014.
• Overseeing the field operation of ZEiTECS Rigless ESP Retrievable Technology in the Middle East, Asia and some African countries.
• Coordinating with sales and manufacturing to execute the projects as designed.
• Evaluating the quality and efficiency of field operations through personal observations and QC.

Artificial Lift Field Supervisor at Schlumberger
  • Kuwait - Al Ahmadi
  • October 2005 to April 2013

• Assisting in the planning of operations to ensure high quality service with the best economical and technical efficiency for our clients WNPOC, PDOC, GNPOC, Saudi ARAMCO and KOC.
• Overseeing the installation, commissioning and troubleshooting of a wide range of ESP equipment and related accessories, including ESP/By-pass Systems, ESP/CT-PLT Operations, Downhole Monitoring Systems, Variable Speed Drives (VSDs), Fixed Speed Drives (FSDs) and espWatcher/Liftwatcher Systems (Remote surveillance and control systems for the ESPs).
• Supervising some special projects for KOC: POD Systems in SE Kuwait, Water Dumpflooding in North Kuwait, Shrouded ESP+Y-tool, 18 Pulse VSD Preventive Maintenance.

Electrical Field Engineer at Al-Khorayef Petroleum Co.
  • Sudan - Khartoum
  • June 2005 to October 2005

Duties Include, but were not limited to:
• Installing and troubleshooting of ESP and FSD/VSD systems.
• Ordering necessary parts and materials.
• Working as a Safety Officer in the operation base camp.

Electrical Engineer and Database Manager at National Electricity Corporation (Sudan)
  • Sudan - Khartoum
  • December 2002 to May 2005

Duties Include, but were not limited to:
• Managing Khartoum Distribution database.
• Preparing and reviewing electrical & structural drawings.
• Supervising the GIS implementation.
• Dealing with the EMS (Energy Management System) applications and assisting the ABB distribution consultant in replanning the national grid with the aid of the power system optimization software packages Calpos® and NEPLAN®.

Education

Diploma, Electrical Engineering
  • at Sudan University of Science and Technology
  • December 2002

3-year Diploma in Electrical Engineering

Specialties & Skills

Electrical Engineering
Project Engineering
Operation
Production
Field Service
Operation Management
People and Asset Management
Production Optimization
Project Management
Technical Sales and Support

Languages

Arabic
Expert
English
Expert

Memberships

The Society of Professional Engineers, UK
  • Member
  • September 2009
International Association of Engineers (IAENG)
  • Member
  • December 2008
The Society of Petroleum Engineers (SPE)
  • Member
  • November 2011

Training and Certifications

Variable Speed Drives (Training)
Training Institute:
Schlumberger
Date Attended:
December 2007
Duration:
40 hours
Managing & leading your people (Training)
Training Institute:
Schlumberger
Date Attended:
December 2008
Duration:
40 hours
Time Management, Problem Solving and Basic Finance (Training)
Training Institute:
Schlumberger
Date Attended:
April 2007
Duration:
20 hours
Electrical Submersible Pumping Systems (Training)
Training Institute:
Schlumberger
Date Attended:
June 2006
Duration:
240 hours
Reservoir Engineering & Drilling Introduction (Training)
Training Institute:
Schlumberger
Date Attended:
June 2006
Duration:
40 hours
Introduction to E&P Industry and QHSE (Training)
Training Institute:
Schlumberger
Date Attended:
October 2005
Duration:
40 hours
BIW EFT™ Electrical Penetrator System (Training)
Training Institute:
ITT
Date Attended:
July 2016
Duration:
16 hours
QHSE Training For Supervisors and LPT Leaders (Training)
Training Institute:
Schlumberger
Date Attended:
July 2014
Duration:
24 hours